Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025
Ended Master IDIQ Awarded
- Federal agency
-
Air Mobility Command
- Awardees
- 3
- Task orders
- 40
- Obligated
- $37,486,340
Vehicle facts
- Opportunity
-
- Underground Utilities Solicitation · FA448419RA001 · Posted Jul 3, 2019
- Agency
-
- Air Mobility Command Air Force, Department of Defense
- Combined task order value
- $38,975,833 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling 62% used
- $60,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Air Force Air Mobility Command awarded this Master IDIQ on February 13, 2020, for construction and replacement of sanitary, storm, and water conveyance systems at Joint Base McGuire-Dix-Lakehurst, with ordering authority that closed on February 12, 2025. The vehicle is fully exhausted: 40 task orders have obligated $37.5 million of the $39 million combined potential value (96% obligated), and no new orders may be placed.
The originating solicitation was set aside for total small business, though awarded task orders show a 50/50 split between small-business and unrestricted orders, reflecting how competition evolved across the vehicle's lifecycle. Work centers on repair and replacement of potable water lines, sanitary sewer systems, and storm drainage infrastructure across the base. Typical orders range from tens of thousands to low single-digit millions; the largest single order (PTFL221002, repair of potable water distribution lines at multiple locations) obligated $3.1 million with a $3.1 million ceiling.
Ranco Construction Inc. dominates the vehicle: 19 orders with $20.9 million combined potential value (54% of the portfolio). Eastern Construction & Electric Inc. holds 17 orders and $17.5 million (45%). Flagship Contracting Inc. received 4 orders totaling $539 thousand (1%). Nearly all funding flows through Air Mobility Command (39 of 40 orders, $39 million), with a single Army Forces Command order for $5 thousand.
Ordering momentum peaked in 2024 with 11 awards, then dropped to 5 in 2025. The most recent task orders (dated July 2025) continued filling the remaining obligation capacity, with small individual repairs and spot replacements ranging from $8 thousand to $69 thousand. The vehicle's closure precludes new work unless a successor contract is established.
IDV awards
| Awardee | IDV award | Awarded |
|---|---|---|
| Flagship Contracting Inc. | FA448420D0013 | |
| Ranco Construction Inc. | FA448420D0012 | |
| Eastern Construction & Electric Inc. | FA448420D0014 |
Latest task orders
Show 15 more
Latest 25 of 40 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Ranco Construction Inc. | $20,891,746 | 56% |
| 2 | Eastern Construction & Electric Inc. | $16,067,778 | 43% |
| 3 | Flagship Contracting Inc. | $526,816 | 1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Air Force | $37,481,091 | 100% |
| 2 | Department of the Army | $5,249 | <1% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | -$6,500 |
| FY2025 | $3,002,606 |
| FY2024 | $4,188,021 |
| FY2023 | $7,606,173 |
| FY2022 | $15,422,251 |
| FY2021 | $3,940,291 |
| FY2020 | $3,333,498 |
Quick answers
What is the Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025 contract vehicle?
Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Mobility Command (Air Force), awarded on February 13, 2020.
Which companies hold Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025?
3 companies hold Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025's IDV awards, one each. The latest went to Flagship Contracting Inc. on February 13, 2020. The awardees whose task orders obligated the most are Ranco Construction Inc., Eastern Construction & Electric Inc. and Flagship Contracting Inc.
How much has been spent through Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025?
40 task orders have been placed under Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025, obligating $37,486,340. Their combined current value, with exercised options, is $38,975,833.
What is the shared ceiling of Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025?
Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025's shared ceiling is $60,000,000; its task orders have used 62% of it.
Which agencies use Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025 the most?
The departments whose task orders under Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025 obligated the most are Air Force ($37,481,091) and Department of the Army ($5,249).
How much was obligated through Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025 in fiscal year 2025?
Task orders under Construction and Replacement Of Sanitary, Storm, And Water Conveyance Systems At Joint Base Mcguire-Dix-Lakehurst 2020-2025 obligated $3,002,606 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle