Construction and Fire Protection MATOC

Active Master IDIQ Awarded

Federal agency
Awardees
4
Task orders
6
Obligated
$2,378,572

Vehicle facts

Opportunity
  • 3/11/2029 Solicitation number
Agency
Combined task order value
$2,378,572 Current and potential, with all options
Last date to order 57% complete
Shared ceiling 2% used
$99,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Army Corps of Engineers Engineering District Charleston established a Construction and Fire Protection MATOC with a shared ceiling of $99 million and authority to place orders through March 11, 2029—approximately 2 years and 7 months of remaining ordering window. All six awarded task orders carry unrestricted set-asides.

The vehicle is nearly dormant. Only six task orders worth a combined potential value of $2.4 million have been awarded since September 1, 2023, with ordering momentum declining sharply: four orders in 2023, one in 2024, and one in 2025. All $2.4 million of combined potential value is already obligated; no remaining capacity exists under the shared ceiling relative to work actually contracted. The gap between the $99 million shared ceiling and the $2.4 million obligated suggests either minimal utilization of the vehicle's design capacity or a structural mismatch between the ceiling and customer demand.

Awarded work centers on fire protection systems and repairs: Building 4270 fire alarm system upgrades, VESDA fire alarm and interface card repairs at Joint Base Charleston-North Patrol Training Unit, and base-period fire protection services. Task orders are small, ranging from $1,000 base-period awards to $783,724 for a single repair engagement. Two firms, Mig Gov LLC and Gideon Contracting LIMITED Liability Company, split the workload equally at $1.2 million potential value each; HSU EGI JV LLC and Bristol Prime Contractors LLC each hold token $1,000 awards. All orders fund the Engineering District Charleston itself; no cross-agency customer base exists.

The vehicle operates under a firm fixed-price model with completion windows typically under one year. Given the minimal obligated value against a $99 million ceiling, sparse ordering cadence, and tight concentration among two primes capturing 100% of significant value, this vehicle warrants a watch posture rather than active pursuit unless your firm has existing relationships within the Charleston District's fire protection scope or plans regional growth in Army facilities management.

IDV awards

Latest task orders

Top awardees by obligations

Rank Awardee Obligated Share
1 Gideon Contracting, LIMITED Liability Company $1,204,870 51%
2 Mig Gov, LLC $1,171,702 49%
3 HSU EGI JV LLC Minimum guarantee only $1,000 <1%
4 Bristol Prime Contractors, LLC Minimum guarantee only $1,000 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $2,378,572 100%

Obligations by fiscal year

Fiscal year Obligated
FY2025 $426,955
FY2024 $753,952
FY2023 $1,197,665

Quick answers

What is the Construction and Fire Protection MATOC contract vehicle?

Construction and Fire Protection MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Charleston (US Army Corps of Engineers), awarded on September 1, 2023.

Which companies hold Construction and Fire Protection MATOC?

4 companies hold Construction and Fire Protection MATOC's IDV awards, one each. The latest went to Gideon Contracting, LIMITED Liability Company on September 1, 2023. The awardees whose task orders obligated the most are Gideon Contracting, LIMITED Liability Company, Mig Gov, LLC and HSU EGI JV LLC.

How much has been spent through Construction and Fire Protection MATOC?

6 task orders have been placed under Construction and Fire Protection MATOC, obligating $2,378,572.

What is the shared ceiling of Construction and Fire Protection MATOC?

Construction and Fire Protection MATOC's shared ceiling is $99,000,000; its task orders have used 2% of it.

Which agencies use Construction and Fire Protection MATOC the most?

The departments whose task orders under Construction and Fire Protection MATOC obligated the most are Department of the Army ($2,378,572).

How much was obligated through Construction and Fire Protection MATOC in fiscal year 2025?

Task orders under Construction and Fire Protection MATOC obligated $426,955 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle