- Opportunity
-
- Civil Engineering Building and Utilities Mechanical III (CE BUMP III) at Arnold AFB Pre-Solicitation · FA910123RB007 · Posted Jan 4, 2023
- Agency
-
- Air Force Test Center Air Force Materiel Command, Department of Defense
- Combined task order value
-
- $10,975,438 Current, with exercised options
- $11,683,241 Potential, with all options
- Last date to order 64% complete
- Shared ceiling 11% used
- $99,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Air Force Materiel Command Test Center established this master IDIQ for mechanical installation, minor construction, infrastructure sustainment, maintenance and repair services for heating, ventilation and air conditioning, water, steam and fuel systems at Arnold Air Force Base, Tennessee, with a shared ceiling of $99 million and ordering authority through August 15, 2028.
The vehicle remains active with approximately two years and four weeks of ordering period remaining. Since award on August 15, 2023, the vehicle has issued 13 task orders totaling $4.9 million in combined potential value, with all dollars obligated. Ordering momentum has declined: six orders were placed in 2023, three in 2024, and four in 2026, with the most recent award on April 9, 2026. The vehicle represents only 5% of its $99 million ceiling capacity to date, indicating substantial remaining headroom.
Blue Oak Projects, LLC dominates the prime contractor base, holding six of 13 orders worth $2.2 million combined potential value. Ingenium Spectrum Sdvosb JV 2 LLC, LHH Construction Services, Inc., and Bacik Group LLC account for the remaining activity. About 54% of orders carry a total small business set-aside designation; the remaining 46% are unrestricted. Task orders range from $4.5 thousand to $975 thousand in obligated value, typically firm fixed price, with completion dates stretching from 2024 through 2027. Recent work spans HVAC system replacement, boiler and cooling tower repairs, fire alarm and suppression system upgrades, and facility mechanical infrastructure replacement across multiple buildings.
The Air Force Materiel Command Test Center funds 11 of 13 orders ($3.8 million), with the broader Department of the Air Force placing two orders ($1.1 million). All activity to date occurs at Arnold Air Force Base, Tennessee. The vehicle's originating solicitation anticipated task orders ranging from $50 thousand to $15 million individually; awarded orders have remained below $1 million ceiling to date, suggesting the vehicle has not yet drawn larger planned efforts.
Description
The Department of the Air Force Materiel Command Test Center is procuring mechanical installation, minor construction, infrastructure sustainment, maintenance and repair services for heating, ventilation and air conditioning, water, steam and fuel systems
IDV awards
Latest task orders
Show all 16
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | LHH Construction Services, Inc. | $6,189,313 | 56% |
| 2 | Blue Oak Projects, LLC | $3,056,926 | 28% |
| 3 | Ingenium Spectrum Sdvosb JV 2 LLC | $1,079,999 | 10% |
| 4 | Bacik Group LLC | $649,200 | 6% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Air Force | $10,975,438 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $8,160,744 |
| FY2024 | $1,333,668 |
| FY2023 | $1,481,026 |
Quick answers
What is the CE BUMP III contract vehicle?
Civil Engineering Building and Utilities Mechanical III (CE BUMP III) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Test Center (Air Force Materiel Command), awarded on August 15, 2023.
Which companies hold CE BUMP III?
4 companies hold CE BUMP III's IDV awards, one each. The latest went to Bacik Group LLC on August 15, 2023. The awardees whose task orders obligated the most are LHH Construction Services, Inc., Blue Oak Projects, LLC and Ingenium Spectrum Sdvosb JV 2 LLC.
How much has been spent through CE BUMP III?
16 task orders have been placed under CE BUMP III, obligating $10,975,438.
What is the shared ceiling of CE BUMP III?
CE BUMP III's shared ceiling is $99,000,000; its task orders have used 11% of it.
Which agencies use CE BUMP III the most?
The departments whose task orders under CE BUMP III obligated the most are Air Force ($10,975,438).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle