Block 45 Full Rate Production Group A Kit

Ended Master IDIQ Awarded

Federal agency
Awardees
5
Task orders
12
Obligated
$18,353,897

Vehicle facts

Opportunity
  • FA810514R0009 Solicitation number
Agency
Combined task order value
$17,948,697 Current and potential, with all options
Last date to order 100% complete

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Air Force Materiel Command awarded this Master IDIQ on August 18, 2015, for development, fabrication, testing, packaging, and management to deliver up to 377 Block 45 Group A Production Kits that integrate and install Block 45 Group B Line Replaceable Units into C/KC-135 aircraft. Ordering under this vehicle closed on August 30, 2024, and is no longer accepting new orders.

The vehicle established 12 task orders over seven years, with activity concentrated in the initial award year and declining thereafter — one order per year from 2018 through 2022, with the most recent award in July 2022. Combined task-order potential value stands at $17.9 million, against which $18.4 million has been obligated, indicating full commitment and minor overages against stated potential. All task orders fund Air Force Materiel Command programs exclusively.

Phoenix Logistics, LLC dominates the competitive base, holding four orders valued at $7.8 million (44% of combined potential value). Westwind Technologies, Inc., Strata-G Solutions LLC, and Aircraft Engineering & Installation Services, Inc. each hold orders in the $2.5–$2.6 million range. A longer tail of smaller primes — Tfab Manufacturing, LLC and Richard Manufacturing Company — fills out the remaining activity across six distinct prime contractors. Individual task orders range from roughly $325 thousand to $2.6 million, all structured as firm fixed price. The vehicle reflects a 58% small-business set-aside mix by order count, with seven of twelve task orders designated Total Small Business and five unrestricted. Orders awarded in 2015 and 2016 predominantly carried small-business set-asides; unrestricted orders began appearing in 2018 and increased thereafter, suggesting a shift toward open competition as the production profile matured. The vehicle's ordering window has closed, eliminating new opportunity, though completion dates on some outstanding task orders extended into 2024.

Description

The Government has awarded a Master IDIQ for Block 45 Full Rate Production Group A Kit acquisition. This vehicle primarily consists of the development, fabrication, testing, packaging and management to deliver up to 377 Block 45 Group A Production Kits. Contractors under this vehicle are required to construct a kit IAW drawings and technical data provided. The Block 45 Group A Production Kit is required to integrate and install Block 45 Group B Line Replaceable Units (LRUs) into the C/KC-135 aircraft.

IDV awards

Latest task orders

Show all 12

Top awardees by obligations

Rank Awardee Obligated Share
1 Phoenix Logistics, LLC $8,201,487 45%
2 Westwind Technologies, Inc. $2,603,575 14%
3 Strata-G Solutions LLC $2,571,071 14%
4 Aircraft Engineering & Installation Services, Inc. $2,484,384 14%
5 Tfab Manufacturing, LLC $2,095,537 11%
6 Richard Manufacturing Company $397,842 2%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $18,353,897 100%

Obligations by fiscal year

Fiscal year Obligated
FY2023 $1,234
FY2022 $2,571,071
FY2021 $2,478,517
FY2020 $2,595,220
FY2019 $2,183,495
FY2018 $2,111,328
FY2017 $1,781,842
FY2016 $2,425,268
FY2015 $2,205,922

Quick answers

What is the Block 45 Full Rate Production Group A Kit contract vehicle?

Block 45 Full Rate Production Group A Kit is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Materiel Command (Air Force), awarded on August 18, 2015.

Which companies hold Block 45 Full Rate Production Group A Kit?

5 companies hold Block 45 Full Rate Production Group A Kit's IDV awards, one each. The latest went to Aircraft Engineering & Installation Services, Inc. on August 18, 2015. The awardees whose task orders obligated the most are Phoenix Logistics, LLC, Westwind Technologies, Inc. and Strata-G Solutions LLC.

How much has been spent through Block 45 Full Rate Production Group A Kit?

12 task orders have been placed under Block 45 Full Rate Production Group A Kit, obligating $18,353,897. Their combined current value, with exercised options, is $17,948,697.

Which agencies use Block 45 Full Rate Production Group A Kit the most?

The departments whose task orders under Block 45 Full Rate Production Group A Kit obligated the most are Air Force ($18,353,897).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle