Army Medical Facility Construction in Honolulu

Ended Master IDIQ Awarded

Federal agency
Awardees
2
Task orders
5
Obligated
$15,029,261

Vehicle facts

Opportunity
  • W9128A12R0014 Solicitation number
Agency
Combined task order value
$15,029,261 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 31% used
$49,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Army Corps of Engineers Engineering District Honolulu established a $49 million multiple-award task order contract for design-bid-build and design-build construction services supporting medical facilities in Hawaii, with ordering authority closed since June 7, 2018.

The vehicle is inactive for new work. The last task order was awarded in September 2014, and all five orders issued under the contract have been obligated at their ceiling values. The contract generated ordering activity only during 2013–2014 (four orders in the award year, one in the following year), with no activity in the subsequent four-year window before the ordering deadline elapsed. The combined task-order potential value reached $15 million against the $49 million shared ceiling, representing 31 percent utilization before the vehicle closed.

Task orders funded construction and repair work at Army installations on Oahu, including the Soldier Centered Medical Home at Wheeler Army Airfield, an embedded behavioral health facility at Schofield Barracks, and health clinic repairs and surveys at Schofield Barracks. All work was performed for the Corps of Engineers Engineering District Honolulu, with no multi-agency funding participation. All five awarded task orders carried Total Small Business set-asides and used firm fixed-price contracting.

Competition was split evenly between two small business primes. Pioneer Contracting Company, LIMITED received three orders totaling $7.3 million in potential value; Hawk Contracting Group LLC received two orders totaling $7.8 million. The actual distribution of work between the two firms reflected the multiple-award structure, with no single contractor dominating the portfolio.

Awarded task orders ranged from $2.9 million to $7.8 million in ceiling value, with performance periods between 24 and 36 months. Two deliveries — minimum-guarantee placeholder orders issued at the contract inception — carried zero obligation and represented administrative minimum-guarantee requirements rather than funded work scope.

Description

$49M multiple award task order contract (MATOC) for design-bid-build (DBB) and design-build (DB) construction services for medical facilities within the Honolulu engineer district's area of responsibility.

IDV awards

Latest task orders

Top awardees by obligations

Rank Awardee Obligated Share
1 Hawk Contracting Group LLC $7,770,061 52%
2 Pioneer Contracting Company, LIMITED $7,259,200 48%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $15,029,261 100%

Obligations by fiscal year

Fiscal year Obligated
FY2016 $848,519
FY2015 $1,056,287
FY2014 $2,847,064
FY2013 $10,277,391

Quick answers

What is the Army Medical Facility Construction in Honolulu contract vehicle?

Army Medical Facility Construction in Honolulu is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Honolulu (US Army Corps of Engineers), awarded on June 6, 2013.

Which companies hold Army Medical Facility Construction in Honolulu?

2 companies hold Army Medical Facility Construction in Honolulu's IDV awards, one each. The latest went to Pioneer Contracting Company, LIMITED on June 6, 2013. The awardees whose task orders obligated the most are Hawk Contracting Group LLC and Pioneer Contracting Company, LIMITED.

How much has been spent through Army Medical Facility Construction in Honolulu?

5 task orders have been placed under Army Medical Facility Construction in Honolulu, obligating $15,029,261.

What is the shared ceiling of Army Medical Facility Construction in Honolulu?

Army Medical Facility Construction in Honolulu's shared ceiling is $49,000,000; its task orders have used 31% of it.

Which agencies use Army Medical Facility Construction in Honolulu the most?

The departments whose task orders under Army Medical Facility Construction in Honolulu obligated the most are Department of the Army ($15,029,261).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle