Army Design Build Sri Lanka 2013-2018
Ended Master IDIQ Awarded
- Federal agency
-
ENDIST Alaska
- Awardees
- 3
- Task orders
- 13
- Obligated
- $5,164,093
Vehicle facts
- Opportunity
-
- W911KB13R0034 Solicitation number
- Agency
-
- ENDIST Alaska US Army Corps of Engineers, Department of Defense
- Combined task order value
- $5,164,093 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling 34% used
- $15,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering District Alaska established this Master IDIQ for design-build work in Sri Lanka with a shared ceiling of $15 million, but ordering closed on March 24, 2019, and the vehicle is no longer available for new task orders.
All 13 task orders awarded under the vehicle funded Army Corps of Engineers work and carried no set-aside designations. Combined task-order potential value totaled $5.2 million, with 100 percent of that amount obligated as of the most recent award in September 2016. Peak ordering activity occurred in 2015, when seven orders were placed; subsequent years saw declining volume (three orders in 2016, none after that date). The vehicle demonstrated front-loaded consumption: the majority of the shared ceiling appears to have been allocated against specific task orders early in the vehicle's life, leaving no apparent headroom for additional work.
Hairu Engineering Consultancy PVT LTD dominated the competitive landscape, securing seven of the thirteen orders representing $2.8 million in combined potential value. Salasi Lanka Private LTD captured four orders worth $1.6 million, and Resources Development Consultants (Private) LIMITED earned two orders valued at $757 thousand. All three primes were Sri Lanka-based firms.
Task orders were firm fixed price design-build contracts for school construction projects across Sri Lanka, including work at Vivekananda School, Koonitheevu, Soodaikkuda, Al-Noor Vidyalaya, Al-Mazhar, Dharussalam, Al-Ameen Maha, Abdul Cader, Wesley, Kariapper, Ladies, Bathuriya Vidyalaya, and Osmaniya Secondary School. Individual task-order values ranged from approximately $183 thousand to $603 thousand, with completion dates concentrated between mid-2017 and late 2018.
This vehicle is not suitable for current pursuit; ordering authority expired seven years ago and all available funds have been obligated.
IDV awards
Latest task orders
Show all 13
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Hairu Engineering Consultancy PVT LTD | $2,757,829 | 53% |
| 2 | Salasi Lanka Private LTD | $1,649,202 | 32% |
| 3 | Resources Development Consultants (Private) LIMITED | $757,062 | 15% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $5,164,093 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2020 | $1,412 |
| FY2019 | -$5,278 |
| FY2018 | -$16,833 |
| FY2016 | $1,130,458 |
| FY2015 | $2,687,070 |
| FY2014 | $1,046,338 |
| FY2013 | $320,927 |
Quick answers
What is the Army Design Build Sri Lanka 2013-2018 contract vehicle?
Army Design Build Sri Lanka 2013-2018 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Alaska (US Army Corps of Engineers), awarded on August 7, 2013.
Which companies hold Army Design Build Sri Lanka 2013-2018?
3 companies hold Army Design Build Sri Lanka 2013-2018's IDV awards, one each. The latest went to Hairu Engineering Consultancy PVT LTD on August 13, 2013. The awardees whose task orders obligated the most are Hairu Engineering Consultancy PVT LTD, Salasi Lanka Private LTD and Resources Development Consultants (Private) LIMITED.
How much has been spent through Army Design Build Sri Lanka 2013-2018?
13 task orders have been placed under Army Design Build Sri Lanka 2013-2018, obligating $5,164,093.
What is the shared ceiling of Army Design Build Sri Lanka 2013-2018?
Army Design Build Sri Lanka 2013-2018's shared ceiling is $15,000,000; its task orders have used 34% of it.
Which agencies use Army Design Build Sri Lanka 2013-2018 the most?
The departments whose task orders under Army Design Build Sri Lanka 2013-2018 obligated the most are Department of the Army ($5,164,093).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle