Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025

Ended Master IDIQ Awarded

Federal agency
Awardees
9
Task orders
87
Obligated
$84,221,238

Vehicle facts

Opportunity
Agency
  • ENDIST Alaska US Army Corps of Engineers, Department of Defense
Combined task order value
  • $84,300,244 Current, with exercised options
  • $93,282,211 Potential, with all options
Last date to order 100% complete
Shared ceiling 60% used
$140,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Army Corps of Engineers Engineering District Alaska awarded this Master IDIQ for environmental remediation services on April 22, 2020, with a shared ceiling of $140 million; ordering closed on October 22, 2025. The vehicle is now inactive for new orders.

The IDIQ funds investigations, site characterizations, remedial designs, removal and remedial actions, and operations and maintenance at Formerly Used Defense Sites (FUDS) across Alaska and the U.S. Pacific Command area of responsibility, including Hawaii, Japan, Korea, and Guam. Work is primarily driven by the USACE Alaska District's FUDS program and Army and Air Force environmental initiatives. Task orders span environmental assessments, hazardous waste assessments, groundwater monitoring, contaminated soil removal, and long-term monitoring and land use controls at military installations and remote sites including Joint Base Elmendorf-Richardson, Eielson Air Force Base, Fort Wainwright, and smaller installations throughout Alaska.

Ordering activity peaked in 2021–2023, averaging 21–22 orders per year, then dropped to 10 orders in 2024 and 2 orders in the first four months of 2025. Of 87 total task orders awarded, 87 obligated $82.4 million against the $91.5 million combined potential value, representing 90% spend-down of available capacity.

Competition is highly concentrated. Brice Engineering, LLC dominates with 31 orders worth $41.8 million in combined potential value, representing roughly 46% of the vehicle's activity. North Wind-Ea JV, LLC holds 15 orders for $15.8 million, and Bethel Environmental Solutions LLC, Ahtna Engineering Services, LLC, and Paragon-Jacobs Joint Venture, LLC split the remainder. The top five primes account for 93% of combined potential value. All 87 task orders fund the Department of the Army Corps of Engineers Engineering District Alaska; no cross-agency activity exists.

Set-aside usage is minimal: 89% of orders carry no set-aside designation, while 11% (10 orders) are Total Small Business set-asides. Pricing is exclusively firm-fixed-price. Individual task orders range from roughly $50,000 to $12.1 million in ceiling value, with most falling in the $200,000–$2.8 million range. The largest single order is a contaminated soil removal task (W911KB20D0002-W911KB22F0092) valued at $12.1 million.

Description

Investigations, studies, engineering support, remedial designs, removal and remedial actions and operations and maintenance activities for ENDIST Alaska customers. The task orders support the USACE Alaska District's Formerly Used Defense Sites (FUDS) program, Army and Air Force environmental programs and the environmental programs of other non-DoD customers. Requirements will be carried out as specified in the individual task order at locations within Alaska and also potentially within the U.S. Pacific Command (USPACOM) area of responsibility (AOR) in locations which may include Hawaii, Japan, Korea, or Guam.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
POL soil removal/disposal W911KB23F0077 Ahtna Engineering Services, LLC ENDIST Alaska (USACE) $2,084,755
Field work W911KB24F0037 Brice Engineering, LLC ENDIST Alaska (USACE) $464,021
NE cape fuds W911KB23F0088 Brice Engineering, LLC ENDIST Alaska (USACE) $226,698
Environmental assessment installation security perimeter fence W911KB23F0145 North Wind-Ea JV, LLC ENDIST Alaska (USACE) $232,030
Planning documents W911KB24F0121 Ces-Rescon LLC ENDIST Alaska (USACE) $227,888
Remedial environment services for formerly used defense site F10AK0251-07 at… W911KB24F0118 Brice Engineering, LLC ENDIST Alaska (USACE) $833,333
The department of the air force (DAF) is proposing to develop a combat… W911KB24F0079 North Wind-Ea JV, LLC ENDIST Alaska (USACE) $540,651
Avgas hill kodiak navy army formerly used defense site (F10AK100712) phase IV… W911KB22F0076 Paragon-Jacobs Joint Venture, LLC ENDIST Alaska (USACE) $2,405,454
Enviornmental assessment (EA) for consolidation of munitions at eielson air… W911KB24F0116 Brice Engineering, LLC ENDIST Alaska (USACE) $307,523
2023 LTM and LUC inspections W911KB23F0033 Ces-Rescon LLC ENDIST Alaska (USACE) $340,267
Base tasks 1- 5 W911KB23F0111 Brice Engineering, LLC ENDIST Alaska (USACE) $1,109,749
Supplemental RIS and risk assessments W911KB22F0052 Ces-Rescon LLC ENDIST Alaska (USACE) $2,626,182
Contaminated soil removal W911KB22F0092 Brice Engineering, LLC ENDIST Alaska (USACE) $12,107,737
Task order award of clins 0001-0003, and optional task 0004 rota EBS. W911KB24F0126 North Wind-Ea JV, LLC ENDIST Alaska (USACE) $251,377
Moose creek long-term water supply interim remedy continuation. W911KB23F0161 North Wind-Ea JV, LLC ENDIST Alaska (USACE) $1,120,542
Feasibilty study for port heiden W911KB23F0132 North Wind-Ea JV, LLC ENDIST Alaska (USACE) $596,214
The objective of this effort is to fill data gaps identified in the 2020… W911KB22F0039 Bethel Environmental Solutions LLC ENDIST Alaska (USACE) $1,421,502
Bethel AC & w station fuds PIT 3 area htrw contaminated soil W911KB23F0096 Ahtna Engineering Services, LLC ENDIST Alaska (USACE) $799,530
FWA nouri - remedial investigations and actions at various sites fort… W911KB21F0145 Brice Engineering, LLC ENDIST Alaska (USACE) $2,046,046
Unalaga island, alaska CON/htrw removal W911KB21F0100 North Wind-Ea JV, LLC ENDIST Alaska (USACE) $1,601,760
Ehmp bellows W911KB23F0100 North Wind-Ea JV, LLC ENDIST Alaska (USACE) $228,357
Investigations & monitoring at fairbanks, AK W911KB21F0111 Paragon-Jacobs Joint Venture, LLC ENDIST Alaska (USACE) $1,463,319
Base-wide monitoring, land use controls, and holding cell management at eielson… W911KB21F0112 Bethel Environmental Solutions LLC ENDIST Alaska (USACE) $669,182
Well decommissioning and site restoration haines-fairbanks pipeline milepost… W911KB25FA011 Ahtna Engineering Services, LLC ENDIST Alaska (USACE) $80,116
The objectives of this task order are to perform a visual inspection at the… W911KB25FA009 Brice Engineering, LLC ENDIST Alaska (USACE) $58,968
Show 15 more

Latest 25 of 87 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Brice Engineering, LLC $40,619,495 48%
2 Bethel Environmental Solutions LLC $10,086,756 12%
3 North Wind-Ea JV, LLC $9,559,920 11%
4 Ahtna Engineering Services, LLC $9,018,571 11%
5 Paragon-Jacobs Joint Venture, LLC $9,000,032 11%
6 Ces-Rescon LLC $4,175,379 5%
7 Bristol Environmental Remediation Services, LLC $1,072,600 1%
8 FPM Remediations, Inc. $638,931 1%
9 Cape-Weston JV2 LLC $49,555 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $84,221,238 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $2,982,233
FY2025 -$2,863,834
FY2024 $6,433,722
FY2023 $12,482,518
FY2022 $30,549,460
FY2021 $24,796,970
FY2020 $9,840,169

Quick answers

What is the Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025 contract vehicle?

Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Alaska (US Army Corps of Engineers), awarded on April 22, 2020.

Which companies hold Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025?

9 companies hold Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025's IDV awards, one each. The latest went to Ces-Rescon LLC on June 25, 2020. The awardees whose task orders obligated the most are Brice Engineering, LLC, Bethel Environmental Solutions LLC and North Wind-Ea JV, LLC.

How much has been spent through Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025?

87 task orders have been placed under Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025, obligating $84,221,238. Their combined current value, with exercised options, is $84,300,244.

What is the shared ceiling of Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025?

Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025's shared ceiling is $140,000,000; its task orders have used 60% of it.

Which agencies use Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025 the most?

The departments whose task orders under Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025 obligated the most are Department of the Army ($84,221,238).

How much was obligated through Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025 in fiscal year 2025?

Task orders under Alaska and Pacific Rim Environmental Remediation Services 2020 - 2025 obligated -$2,863,834 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle