RECOVERY--Z--PROJECT NUMBER 5790, Fall River Lake, KS, PROJECT NUMBER 7850, Hulah Lake, OK, PROJECT NUMBER 8790, Kaw Lake, OK, PROJECT NUMBER 8990, Keystone Lake, OK
Added: Apr 04, 2011 6:19 pm
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Overland Corporation, W9126G-08-D-0083, TO DS01, Basic Ordering Agreement (BOA)As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Overland Corporation., to extend the contract as follows: This modification is issued to extend the contract completion date 8 calendar days for all work under Special Contract Requirements Clause "Commencement, Prosecution, and Completion of Work" as a result of delays caused by inclement weather in excess of the anticipated delays set forth in the Special Contract Requirements Clause "Time Extension for Unusually Severe Weather. These delays occurred during the period of May 1, 2010 through February 28, 2011, and were not due to any fault or negligence on the part of the contractor.
W9126G-08-R-0171 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 11/12
4/4/11, 6:19 PM RECOVERY--Z--PROJECT NUMBER 10650, Marion Lake, KS
Added: Nov 04, 2010 3:09 pm
(Subject Continued) Lake, OK, PROJECT NUMBER 20120, Wister Lake, OK, PROJECT NUMBER 2040, Broken Bow Lake, OK, PROJECT NUMBER 2570, Canton Lake, OK, PROJECT NUMBER 3890, Copan Lake, OK, PROJECT NUMBER 510, Mcclellan-Kerr Arkansas River Navigation System, OK, PROJECT NUMBER 5360, Elk City Lake, KS, PROJECT NUMBER 5790, Fall River Lake, KS, PROJECT NUMBER 6000, Fort Gibson Lake, OK, PROJECT NUMBER 6040, Fort Supply Lake, OK, PROJECT NUMBER 6850, Great Salt Plains Lake, OK, PROJECT NUMBER 74925, Sardis Lake, OK, PROJECT NUMBER 74945, Lake Texoma, Denison Dam, TX, PROJECT NUMBER 7500, Heyburn Lake, OK, PROJECT NUMBER 75378, Skiatook Lake, OK, PROJECT NUMBER 7830, Hugo Lake, OK, PROJECT NUMBER 7850, Hulah Lake, OK, PROJECT NUMBER 8790, Kaw Lake, OK, PROJECT NUMBER 8990, Keystone Lake, OKRECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Overland Corporation, to perform the following work: Provide and delete guardrails at various locations.
W9126G-08-R-0171 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 9/12
11/4/10, 3:09 PM RECOVERY--Z--PROJECT NUMBER 2040, Broken Bow Lake, OK, PROJECT NUMBER 2570, Canton Lake, OK
Added: Jun 13, 2011 10:33 am
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Overland Corporation, W9126G-08-D-0083, DS01, Multiple Award Task Order Contract (MATOC)As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Overland Corporation, to perform the following work: (1) Canton Cable Barrier: The Phase 3 design called for approximately 5,125 LF of guardrail on Thunder Road at Canton to replace substandard rail on both sides of the road. The existing roadway width is only 24 FT. Guardrail installation per ODOT Standards requires 1 FT clear space outside the back of guardrail post, an 8 inch post, 8 inch block out, and 3 inch rail element. The resulting driving width for two way traffic after guardrail installation to Oklahoma Department of Transporation Standards would only be 19 FT, and would be too narrow to accommodate two way traffic. Therefore cable barrier substitution was proposed in lieu of guardrail, and any cost savings would be applied to replacement cable barrier parts and training. (2) Broken Bow Electric Conduit: The Phase 3 design calle for an existing high voltage line that was attached to existing guardrail to be removed from the guardrail and buried under ground. When the contractor for the guardrail contract arrived on site at Broken Bow, another contractor had already performed the work under a different contract. It was therefore decided install additional needed guardrail in lieu of the conduit work.
W9126G-08-R-0171 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 12/12
6/13/11, 10:33 AM RECOVERY--Z--PROJECT NUMBER 18050, Tenkiller Ferry Lake, OK, PROJECT NUMBER 18350, Toronto Lake, KS, PROJECT NUMBER 5790, Fall River Lake, KS, PROJECT NUMBER 6000, Fort Gibson Lake, OK, PROJECT NUMBER 7850, Hulah Lake, OK, PROJECT NUMBER (See Desc)
Added: Jan 07, 2011 3:00 pm
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)As part of Operations and Maintenance, Army, Recovery Act, this modifications has been issued to Overland Corporation, to perform the following work: STRUCTURAL CONCRETE REVISIONS: Kaw--Delete two parapet walls. Toronto--Delete two parapet walls.
W9126G-08-R-0171 Department of the Army Corps of Engineers Engineering District Tulsa
Award Notice 10/12
1/7/11, 3:00 PM