Indefinite Delivery Contract GS09P98KSD0046

Ended Awarded Last action

Contract number
GS09P98KSD0046
Awardee
Awarding agency
Task orders
83 $7,262,568 obligated

Award facts

Combined order value
  • $1,271,721 Current, with exercised options
  • $1,271,723 Potential, with all options
Last date to order 100% complete
Award type
Single award
NAICS code
Not on record
Set-aside
No set-aside
Competition
Full and Open Competition · 2 offers
Pricing
Firm Fixed Price
Legislative mandates

Award details come from SAM.gov/FPDS.

Task orders

Task order Ordering agency Obligated Awarded
Provide labor and materials to install 3 each dedicated outlets & move 2 each ceiling light fixtures per provided… GSP0908WF0022 Region 9 (PBS) $2,208
Install breaker GSP0907WF0047 Region 9 (PBS) $2,206
The project is titled "replace boiler safety valves and VFD" and consists of the following: repair faulty high and… GSP0907WF5041 Region 9 (PBS) $4,180
Replace BAS computer for 501 i street, sub level 2 mechanical maintenance office, sacramento, CA 95814. GSP0907WF0046 Region 9 (PBS) $2,982
Water cabling GSP0907WF0044 Region 9 (PBS) $4,247
Metal hollow doors GSP0907WF0041 Region 9 (PBS) $6,259
Boiler testing GSP0907WF0038 Region 9 (PBS) $5,039
Lighting in corridors in 8TH floor at 650 capitol mall GSP0907WF0039 Region 9 (PBS) $9,428
Wet pipe sprinklers GSP0907WF0040 Region 9 (PBS) $9,489
New boilers for building GSP0907WF0036 Region 9 (PBS) $268,481
Contractor shall provide material, labor, and supervision to provide new material for the elevator floors which is… GSP0907WF5038 Region 9 (PBS) $14,500
Granite facing GSP0907WF5037 Region 9 (PBS) $68,526
Contractor shall provide material, labor, and supervision to repair/replace fire pump project located at the federal… GSP0907WF5033 Region 9 (PBS) $18,980
Contractor shall provide labor, material, equipment & supervision to replace floor tiles in 6 (six) elevators at the US… GSP0907WF5032 Region 9 (PBS) $3,656
Sump pump GSP0907WF5030 Region 9 (PBS) $13,212
Landscaping GSP0907WF5031 Region 9 (PBS) $17,711
Add fire sprinkler to mechanical room for the cafe GSP0907WF5028 Region 9 (PBS) $9,926
Replace domestic water VFD GSP0907WF5025 Region 9 (PBS) $10,397
Hot water boiler replacement GSP0907WF5027 Region 9 (PBS) $22,394
Emergency lighting GSP0907WF5026 Region 9 (PBS) $6,718
Proper drainage for fire sprinkler testing GSP0907WF0029 Region 9 (PBS) $16,900
Install cafe equipment GSP0907WF5023 Region 9 (PBS) $4,478
Traffic gates GSP0907WF0025 Region 9 (PBS) $20,678
Air handlers GSP0907WF0024 Region 9 (PBS) $35,621
Guardrails for 501 i street GSP0907WF5022 Region 9 (PBS) $21,191
Jockey pump GSP0907WF0020 Region 9 (PBS) $2,214
Emergency power curcuits GSP0907WF5021 Region 9 (PBS) $9,003
Monthly, quarterly, annal preventive maintenance. GSP0907WF0012 Region 9 (PBS) $11,104
Install condenser GSP0907WF5012 Region 9 (PBS) $3,419
Repair hot water pumps at 2800 cottage way GSP0906WF1010 Region 9 (PBS) $4,999
Repair drive way at the loading dock located at 801 i street GSP0906WF1011 Region 9 (PBS) $3,583
Microlite panels GSP0906WF1012 Region 9 (PBS) $3,490
Freon refrigerant detection system expansion GSP0906WF5013 Region 9 (PBS) $46,526
Remove and replace VFD/starter unit for 501 i street, sacramento, CA 95814 GSP0906WF1002 Region 9 (PBS) $55,873
Electrical wiring for new equipment P0905WF0006 Region 9 (PBS) $11,757
Insulation of air handler P0905WF0005 Region 9 (PBS) $21,834
Fire pump maintenance P0905WF0004 Region 9 (PBS) $8,019
Sally port gates, security risk P0905WF0003 Region 9 (PBS) $1,180
Provide new hydraulic gate operators and photo electric sensors for entry and exit gates at the usms sally port located… P0905WF0002 Region 9 (PBS) $4,274
Maintenance and replacement of the fire pump controller P0905WF0027 Region 9 (PBS) $60,659
Chiller VFD repair P0905WF0026 Region 9 (PBS) $3,969
Perform montly no-load generator testing GSP0905WF0015 Region 9 (PBS) $4,717
Primer and caulk 12 cracked seams in rotunda stainless steel walkway, and clean and prime joints at 16TH floor lockout. GSP0905WF0001 Region 9 (PBS) $3,750
Change water filter monthly GSP0904WF0003 Region 9 (PBS) $773
Switchgear maintenance GSP0904WF0017 Region 9 (PBS) $62,749
Repair emergency lighting system throughout 650 capitol mall GSP0904WF0021 Region 9 (PBS) $5,000
Switchboard maintenance for 501 i street, sacramento, CA GSP0904WF0018 Region 9 (PBS) $55,842
Switchgear maintenance for 801 i street, sacramento GSP0904WF0019 Region 9 (PBS) $25,420
Switchgear maintenance for 650 capitol mall GSP094WF0020 Region 9 (PBS) $37,339
Remove existing valve replacement with new valve and electronic actuator GSP0904WF0016 Region 9 (PBS) $2,680
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope PO06 $0
Original award $0

Quick answers

Who was awarded contract GS09P98KSD0046?

GS09P98KSD0046 was awarded to SMI International, LLC by Region 9 (Public Buildings Service) on November 15, 2001.

How much is contract GS09P98KSD0046 worth?

Orders under GS09P98KSD0046 have obligated $7,262,568. Their combined current value, with exercised options, is $1,271,721. Their combined potential value, with all options, is $1,271,723.

How many orders have been placed under contract GS09P98KSD0046?

83 orders have been placed under GS09P98KSD0046, the latest on March 13, 2008.

Who can order from contract GS09P98KSD0046?

GS09P98KSD0046 is a single award indefinite delivery contract.

Was contract GS09P98KSD0046 competed?

The extent of competition for GS09P98KSD0046 was full and open competition. The government received 2 offers.

On GovTribe

See this IDV's full record

  • Every order and transaction
  • The awardee's other awards and teaming partners
  • Similar IDVs and recompete opportunities
  • Ask GovTribe AI about this IDV