S201--WPBVAMC Temp Routine and COVID-19 Janitorial Support Service New BOA for Temp Routine and COVID-19 Janitorial Support
Page 8 of 8
COMBINED SYNOPSIS/SOLICITATION
The West Palm Beach VA Medical Center located at 7305 N Military Trail, West Palm Beach, FL 33410 has a requirement to provide a service contract support services for Janitorial Services for the Veterans Health Administration (VHA). The purpose of this solicitation is to establish a one-year Blanket Purchase Agreement (BPA) with four one-year options. This BPA will be for Temporary Janitorial Services for routine and disinfection procedures following Centers for Disease Control and Prevention (CDC) Guidance for COVID-19 cleaning. Orders will be placed of this BPA as needed for temporary routine and COVID-19 cleaning. The attached Performance Work Statement (PWS) shall be adhered to.
This is a combined synopsis/solicitation, Request for Quotation (RFQ), for commercial items prepared in accordance with FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. The applicable North American Industry Classification System (NAICS) Code and size standards in millions of dollars are 561720 and $19.5 Million, respectively.
FAR 52.212-2, Evaluation - Commercial Items is applicable to this procurement. This requirement will be awarded to a responsible contractor whose proposal represents the best value to the Government, considering price and technical factors, with technical and past performance factors more important than price.
The evaluation of offers received in response to the solicitation will use a tiered or cascading order of precedence. Tiered evaluation of offers, also known as cascading evaluation of offers, is a procedure used in negotiated acquisitions when market research is inconclusive for justifying limiting competition to small business concerns or sub-categories of small business concerns. The contracting officer
(1) Solicits offers from both small and other than small business concerns that will be evaluated in the following tier order:
(a) service-disabled veteran-owned small business (SDVOSB);
(b) veteran-owned small business (VOSB);
(c) all other small business concerns;
(d) other than small business.
(2) If an award or a sufficient number of awards cannot be made at the first tier, evaluation of offers will proceed at the next lower tier until an award or a sufficient number of awards can be made.
Evaluation factors will be considered in descending order of importance:
Technical Capability: Provide technical performance plan and proof of applicable certifications, license, and insurance.
Past Performance: Prospective contractors may provide a list of five business references for which the contractor performed the same or similar scope as required in the performance work statment. The reference information shall include: name of business; name and title of point of contact; brief description of services performed; and date services performed.
Contractor s Proposed Rate for:
Temporary Routine Cleaning- Price Per Square Foot
AND
COVID-19 Cleaning- Price Per Square Foot.
Offers shall include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications Commercial Items, with its offer. The provision may be accessed at http://farsite.hill.af.mil/. The clause at FAR 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition.
The following provisions related to FAR clause 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items (Oct 2010) apply to this acquisition:
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. 7104(g)).
___Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2010) (Pub. L. 109-282) (31 U.S.C. 6101 note).
52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).
52.219-28, Post Award Small Business Program Re-representation (Jul 2013) (15 U.S.C. 632(a)(2)).
52.222-3, Convict Labor (June 2003) (E.O. 11755).
52.222-19, Child Labor Cooperation with Authorities and Remedies (Oct 2016) (E.O. 13126).
52.222-21, Prohibition of Segregated Facilities (Apr 2015).
52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).
52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
52.222-37, Employment Reports on Veterans, (Feb 2016) (38 U.S.C. 4212).
52.222-54, Employment Eligibility Verification (Oct 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
52.225-1, Buy American Supplies (May 2014) (41 U.S.C. 10a-10d).
52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O. s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
52.232-33, Payment by Electronic Funds Transfer System for Award Management (Jul 2013) (31 U.S.C. 3332).
52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
52.222-41, Service Contract Act Labor Standards (May 2014) (41 U.S.C. 351, et seq.).
52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
(d)  Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
(ii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) [Reserved]
(iv) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vi) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(vii) [Reserved]
(viii) 52.222-41, Service Contract Act of 1965 (May 2014) (41 U.S.C. 351, et seq.).
(ix) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. 7104(g)).
Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. 7104(g)).
(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007) (41 U.S.C. 351, et seq.).
(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. 351, et seq.).
(xii) 52.222-54, Employment Eligibility Verification (Oct 2015).
(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
Other applicable provisions and clauses incorporated by reference:
FAR 52.204-7 System for Award Management
FAR 52.212-1 Instructions to Offerors Commercial items
FAR 52.212-4 Terms and Conditions Commercial items
FAR 52.217-5 Evaluation of Options
FAR 52.217-8 Option to Extend Services
FAR 52.217-9 Option to Extend the Term of the Contract
FAR 52.222-41 Service Contract Labor Standards
FAR 52.225-2 Buy American Certificate
FAR 52.232-33 Payment by Electronic Funds Transfer System for Award Management
FAR 52.233-1 Disputes
FAR 52.233-4 Applicable Law for Breach of Contract Claim
VAAR 852.273-75 Security Requirements for Unclassified Information Technology Resource
VAAR 852.203-70 Commercial advertising
VAAR 852.237-70 Contractor responsibilities
VAAR 852.270-1 Representatives of contracting officers
VAAR 852.273-70 Late offers
VAAR 852.273-74 Award without exchanges
52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/Far/loadmainre.html http://www1.va.gov/oamm/oa/ars/policyreg/vaar/
http://farsite.hill.af.mil/
This announcement constitutes the only solicitation and interested parties are solely responsible for monitoring this solicitation and any amendments thereto. All contractors that intend to participate in the solicitation shall have an active registration with System for Award Management (SAM). If quoters do not have an active SAM account; account registration will be required at the following website. https://www.sam.gov/portal/public/SAM/. All quoters that are SDVOSB or VOSB must be verified through the Vendor Information Pages (VIP). An application and information is available at the following website https://www.vip.vetbiz.gov/. In accordance with VAAR 852.273-74, the Government intends to evaluate proposals and award a contract without exchanges with offerors. Therefore, each initial offer should contain the offeror s best terms from a cost or price and technical standpoint. However, the Government reserves the right to conduct exchanges if later determined by the contracting officer to be necessary.
Offerors are instructed to submit clear and concise offers which adhere to the following format:
Introductory/Response Letter to include brief business history and capability statement (letter not to exceed 3 pages)
Technical Ability section shall include a technical performance plan and proof of insurance and bonding. (section not to exceed 5 pages > not including copies of certificates)
Past Performance section may include up to five business references with the following: name of business; name and title of point of contact; brief description of services performed; and date services performed (section not to exceed 5 pages)
Completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications Commercial Items (provision may be accessed at http://farsite.hill.af.mil/), if not completed in SAM.
Completed Schedule of Rates. Contract support services for temporary routine cleaning and COVID-19 cleaning.
Temporary Routine Cleaning- Price Per Square Foot.
AND
COVID-19 Cleaning- Price Per Square Foot.
All sources who believe that they have the experience and capabilities to perform the required services referenced above and detailed in the Performance Work Statement may submit their detailed quote no later than 4:00pm EST on July 9, 2020 to the following: Scott Frankel, Scott.Frankel@va.gov. Oral communications are not acceptable in response to this notice.
See attached document: Performance Work Statement.
Performance Work Statement
JANITORIAL SERVICES
Background Information
1.1 This is a non-personal services contract to provide janitorial services for the Veterans Health Administration (VHA), one of the largest integrated health care system in the United States, providing care at 1,255 health care facilities, including 170 VA Medical Centers and 1,074 outpatient sites of care of varying complexity (VHA outpatient clinics) to over 9 million Veterans enrolled in the VA health care program. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Agencies shall train their employees in appropriate cleaning and disinfection procedures following Centers for Disease Control and Prevention (CDC) Guidance as well as for interaction with private sector temporaries to assure that the supervisory responsibilities identified in paragraph (a) of § 300.501 of this subpart are carried out by the temporary help service firm. At the same time, agencies must give technical, task-related instructions to private sector temporaries including orientation, assignment of tasks, and review of work products, in order that the temporaries may properly perform their services under the contract.Â
Â
1.2 Period of Performance: Initial period of performance for the BPA will be one year. With the option to extend for an additional four one year option periods.
1.3 Place of Performance:
West Palm Beach VA, Medical Center
7305 N. Military Trail
West Palm Beach, FL 33410
1.4 Hours of Operation: Normal business hours are between 8:00 a.m. to 12:00 midnight everyday including Federal holidays. The janitorial services will be required 24 hours per day, 7 days per week, including Federal holidays. The contractor will be provided a list of the rooms to be cleaned by 8:00 a.m. specific to respective Time Zone. Additional rooms to be cleaned may be assigned to the contractor at varying times of the workday.
1.5 Work Schedule: Prior to commencing performance under this contract, the Contractor shall provide a proposed work scheduled to the Point of Contact (POC) on site describing how services will be accomplished. All work shall be coordinated with the POC or designated representative when accomplished during normal business hours to avoid disruptions or conflicts between the Government functions and the provision of service under this contract. The facility POC will communicate with the designated Contracting Officer Representative (COR) services and completion of those services to validate work was accomplished as required. The Contractor shall maintain a CEH on site during normal work hours 8-4:30 and by phone 24/7.
Area of Responsibility:
Base Request
Contractor shall provide all labor, transportation and supervision to clean and disinfect in accordance with the following:
shifts -Public Space cleaning of up to 600,000 sf .
shifts - High touch surfaces wiped down 4X per shift within public areas. Â This includes wiping down high touch surfaces of 18 elevators at minimum 4x per shift. Â
Full cleaning l Approximately 200 public restrooms 4X daily.
30 waiting rooms 1 x every 2hrs on 1st shift only. 2nd shift 1x cleaning complete. Â
The areas the contractor may be expected to provide services may include:
Building # Name Square Footage
Bldg. 1 Hospital 811,737
Bldg. 3 CLC 56,949
Bldg. 4 Fisher House 6,912
Bldg. 5 Pump House 600
Bldg. 6 Volunteer (Trailer) 960
Bldg. 7 Police (Trailer) 2,160
Bldg. 9 M/C Storage (Trailer) 920
Bldg. 10 FDOT (VSO and VBA) 10,000
Bldg. 11 Transportation (Trailer) 464
Bldg. 12 HRMS 4,602
Bldg. 13 Warehouse 10,000
Bldg. 14 MH 3,600
Bldg. 15 Cancer Center 13,100
Bldg. 16 Mental Health OPC 11,874
Bldg. 17 Decon Building 500
Bldg. 18 PET/CT Building 3,600
Bldg. 19 Hospice 12,100
Bldg. 20 Domiciliary 29,233(under Const)
Bldg. 21 MRI Building 6,199
Cleaning and disinfecting should be done at minimum with CDC and Joint Commission facility cleaning recommendations. The following high touch surfaces should be CLEANED and DISINFECTED frequently (includes, but not limited to:)
High touch areas such as tables, doorknobs, light switches, countertops, handles, desks, phones, keyboards, toilets, faucets, sinks, etc.
Soft surfaces such as carpeted floor, rugs, and drapes
Electronics such as touch screens, keyboards, remote controls, and ATM machines
The above should be performed at minimum in accordance with the following standards:
Aseptic areas apply to all areas within the medical center. Contractor will be required to perform Two-Step Cleaning in accordance with Centers for Disease Control (CDC) guidance. https://www.cdc.gov/oralhealth/infectioncontrol/faqs/cleaning-disinfecting-environmental-surfaces.html.
Option Item 1: There will be cases where a room requires a terminal cleaning in the case of discharge, an isolation room, sick patient or otherwise. Upon request from VA staff, the contractor shall perform a terminal clean to affected areas.
Tasks and Cleaning Standards
The following table summarizes the tasks required under this PWS.
Tasks
Frequency
Empty waste cans and reline
As Requested by on-site POC
Place furniture in proper locations
Spot clean/wash interior windows and door glass
Dust mop/wet mop all tile floors
Clean patient restrooms mid-day
Clean public restrooms
Check and Refill all paper towel, toilet paper, and soap dispensers
Clean and organize all housekeeping closets
Clean/sanitize all bathrooms utilizing a germicidal disinfectant
Buff all tile floors
Dust all horizontal and vertical surfaces
Spot clean furniture
Spot clean waste cans
Empty Recycling Containers
Wash walls and doors
Vacuum carpets, entrance mats, and runners
Clean and Polish all stainless steel
Cover all bed discharges which includes cleaning, disinfecting and remaking beds
Staging and storage of both clean and soiled linen, which includes washing of bed sheets
Strip and refinish all tile floors
Shampoo/extract carpets utilizing soil retardant
Interior and Exterior of windows and doors on first floor level.
Cleaning of High Touch Surfaces
Change privacy curtains
Unoccupied room cleaning
Occupied Patient room cleaning
Isolation room cleaning, Terminal Cleaning, Discharge Cleaning
Carpet Maintenance: Vacuum all carpeted areas in the corridors, elevators, offices, group rooms and public areas. Furniture shall be moved for thorough cleaning and replace the furniture after cleaning. Spot cleaning as required so that the carpet presents a uniform and clean appearance, free of spots and stains. The Contractor shall report any tears, burns and raveling to the attention of the on-site POC or designated representative.
Light Shampoo to protect carpet with soil-repellent and/or static free application of treatment as required.
Deep Steam Clean by using steam or other residue-free cleaning product. The carpet shall be dried to the touch upon completion.
Door and Doorjambs: Perform spot cleaning by damp-wiping and polishing unpainted metal doors, washable surfaces of walls, partitions, doors and fixtures, and handrails. Sanitize as needed.
Ducts, Light Fixtures, Vents and Louvers: These areas are to be cleaned and vacuumed. The ducts shall be cleaned as needed.
Elevators: The Contractor shall clean all interior surfaces, including doors, metal thresholds, tracks, fans. Spot-clean walls.
Entrance Area: Sweep landing, steps, sidewalk of front entrance area, clean the walk-off mats, hose off as required, and remove standing water. The Contractor shall damp-mop the entrance and lobby floors during inclement weather. Trash containers located inside and outside of entrances shall be emptied.
Floor maintenance (non-carpeted):
The Contractor shall strip wax, finish and buff using non-slip floor finish. The Contractor shall turn back the rugs in order to clean and finish the floor areas. The stripping of wax, finish and buffing shall be performed as requested. The scheduling of this task will be coordinated between the Contractor and on-site POC and staff occupying building to ensure there is no disruption to staff and visitors.
Individual rooms and/or a designated area requiring the stripping of wax, refinishing and rebuffing, shall occur and direction of the on-site POC. The area or the room requiring the service will be identified by on-site POC or designated representative to the COR.
The Contractor shall wet mop using a neutral floor cleaner, using a Micro-Fiber Mopping System to mop all accessible areas including corners and abutments. The Contractor shall remove any splash marks or streaks on furniture, walls, baseboards, etc... Isolation room cleaning will include disinfecting floors using a flat microfiber system.
The Contractor shall not mop wood or carpeted floors. The Contractor will only use string mops in the case of large spills. When string mops are required, a double bucket mopping process will be used.
The Contractor shall sweep, dust, and damp mop hard-surfaces, resilient flooring to include normal traffic areas, group rooms, and restrooms. The floors shall be swept, dusted and damp mop using a treated or dust- free method/mop. The Contractor shall ensure that the cleaning includes the corners and abutments. The Contractor shall tilt or move chairs, trash receptacles, and other easily movable items to clean underneath and shall return items to their proper position.
The Contractor shall spray and buff all floors accessible to floor machine unless specified elsewhere as having carpet or special flooring. The Contractor shall apply a uniform coating of non-skid floor finish to protect and restore gloss or sheen. The Contractor shall remove excess floor finish solutions. The Contractor shall apply these techniques only to the portion of the floor needing work, to bring the entire floor up to standard.
Furniture and Flat Surface Cleaning: (Low Dusting refers to areas 36 and below) The Contractor shall dust specific uncluttered horizontal surfaces per direction of the on-site POC within reach with a treated dust cloth (i.e., desks, counters, file cabinets, ledges, bookcases, tables, credenzas, window sills, etc.). The Contractor shall dust vertical surfaces and underneath desks in such a manner as to prevent airborne dust.
The Contractor shall dust furniture items such as chairs, file cabinets and other types of office furniture. The Contractor shall damp-dust other office furniture such as vinyl chairs, lamps, telephones, furniture bases, picture frames.
Furniture and Flat Surfaces Cleaning (High Dusting refers to areas higher than 36 up to 70 ): High dusting includes all the wall surfaces, door frames, shelves, equipment, windowsills, ledges, handrails, etc. that are 70 inches from the floor or more.
Furniture: The Contractor shall vacuum upholstered furniture; clean behind furniture and corners. Move items as necessary to ensure thorough and adequate cleaning; replace to original position. The Contractor shall spot clean upholstered furniture as required.
Doors (Entrance areas): The Contractor shall clean all glass partitions, interior and exterior glass doors, display cases, directory boards, and draft shields on windows, mirrors and adjacent trim.
Stairwells: The Contractor shall sweep, dust and damp mop as needed. Lamps, vents, ceiling and wall areas shall be free of cobwebs, dust, debris and insects.
Walls: Spot/Clean/Wash. The Contractor shall spot-clean wall surfaces to remove cobwebs, fingerprints, smudges. The Contractor shall sanitize the walls as needed.
Blinds/Shades: The Contractor shall vacuum, and damp clean all blinds/shades to remove surface dust, vacuum drapes in place.
Window Cleaning Interior: The Contractor shall wash all windows on interior surfaces, damp-wipe window sashes/sills. The contractor is not responsible for the highest interior windows.
Laundry Service: The contractor shall collect all soiled linen daily and place in designated soiled linen storage until items are picked up by laundry distribution personnel.
Bed Cleaning: The contractor shall remake beds on customer request. After customer has checked out from facility all linens are to be removed from bed and stored in soiled linen room until picked up by the laundry service contractor. The contractor shall use a two-step cleaning process to clean and disinfect beds. The contractor shall remake bed using clean linens.
Miscellaneous
Water Fountains: The Contractor shall empty, rinse and sanitize drinking fountains, water coolers, the hot/cold water dispensers with a germicidal type detergent ensuring that the surface remains visibly wet for the proper dwell time.
Polish Metal. The Contractor shall polish the brass and other metal, aluminum, stainless steel hardware on doors, push bars, and the kicking plates.
Loading Dock. The Contractor shall sweep and hose off loading dock area as needed.
Restrooms
The Contractor shall clean and sanitize sinks, urinals, and toilets.
The floor traps shall always be maintained free from odor .
The Contractor shall sweep and wet mop the floors daily and spray buff as required. The Contractor shall apply a uniform coating of non-skid floor finish. The Contractor shall remove any excess floor finish solutions.
The Contractor shall damp-wipe walls, doors, partitions, mirrors, shelving, and window frames and sills. The Contractor shall use an approved germicide/detergent in restrooms to disinfect all surfaces of partitions, stalls, faces of toilet bowls, urinals, lavatories, showers, dispensers, and other such surfaces.
The Contractor shall damp-wipe and polishes the chrome fixtures.
The Contractor shall clean (descale) toilet bowls and urinals.
The Contractor shall replenish restroom supplies for example: soap dispensers, paper towels and toilet tissue.
The Contractor shall empty, clean, disinfect, and re-line all sanitary napkin and all waste receptacles.
Waste
Trash Removal: The Contractor shall pick up and empty all trash or waste receptacles. Waste will be deposited at established waste collection sites/holding areas at the facility for waste hauler pick up.
Regulated Medical Waste (RMW) Red Bag Bio-hazardous: All receptacles lined with "Red Bags" (plastic bags containing bio-hazardous medical waste material) shall be serviced. The Contractor shall pick up the Red Bag waste and deposit it in specially designated, locked "infectious waste" bins or designated holding areas in a safe and timely manner, and in accordance with established standards and procedures. NOTE: Red Bags may not be used for any other purpose. Under no circumstance will red bag waste be co-mingled with any other types of waste.
Recyclables: The Contractor shall pick up and empty all recycled collection receptacles and deposited them at established holding sites.
Supplies: The dispensers and supplies will be provided by the Government.
1.7 Government Furnished Property, Equipment, and Services
The government will furnish all supplies and equipment Including cleaning supplies (chemicals, PPE, mops, equipment, and SDS).
1.8 Contractor Furnished Items and Services
The contractor shall provide a standard custodial type uniform which is easily recognizable and clearly distinguish them as the Contractor. for employees and ensure all work meets performance standards specified in this Performance Work Statement (PWS) and referenced documents.
Uniforms shall present a neat, distinctive appearance; shall be clean and maintained in good repair; and shall be worn as designed by the manufacturer. Standard custodial type uniform is defined as collared work short (button-down or polo style) and pants or skirt of twill or similar material (no denim). The Contractor shall wear appropriate footwear that will cover the entire foot for safety purposes. The Contractor will not wear hats.
1.9 Contractor Personnel
The Contractor shall assign an International Executive Housekeeper Association (IHEA) Certified Executive Housekeeper (CEH) to supervise and train the contracted personnel. The supervisor shall develop and evaluate the environmental sanitation procedures in order to ensure compliance with all provisions contained in this contract. A supervisor shall be available anytime employees are working on site to provide oversight.
The CEH shall have at least one (1) year of prior Healthcare Sanitation experience as a CEH Manager within the last three years. Written certification of experience and copies of any formal training program (i.e. National Executive Housekeeping Association (NEHA) shall be submitted to the COR before starting work. The COR s approval must be received prior to an employee working at any of the facilities.
The CEH or stand-in representative shall be available during normal duty hours to respond by telephone within thirty (30) minutes of notification by the COR and shall be available to meet with COR or designated representative within 2 hours after notification to discuss problems areas. After normal duty hours, the CEH or stand-in representative shall be available within 3 hours.
The contractor s employees shall be English speaking and shall be able to read, write, speak, understand and communicate effectively in English.
Prior to beginning performance under this contract, the Contractor shall provide the following:
List of employees who will provide services under this contract
Name, telephone number and address of the CEH
List of shift supervisors
The Contractor shall notify the COR in writing whenever there is a change of personnel appointed to fulfill supervisory or shift leader function or when there is a planned absence of key personnel. The CEH shall, in the absence of the Contractor, act as the Contractor Representative. He/she shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.
The Contractor shall not consume food, snacks, or drinks products except during specified break periods in appropriate designated break areas only.
The Contractor shall adhere to the VHA smoke-free campus policy.
The Contractor shall also be responsible for adhering to all requirements under the Privacy Act due to the possibility that confidential medical record information may be accessible and/or visible to contractor employees during performance of their daily duties. The Contractor shall obtain a signed Confidentiality Certificate from each employee prior to allowing them to start work under this contract. The contractor shall keep a copy of confidentiality certificate on site for inspection purposes.
The Contractor is required to have physical examination prior to work on this contract. The Contractor shall not be assigned to this contract if not in good physical health or pose a risk to patients. The Contractor who acquires a communicable illness shall not perform service under the contract and shall be free of illness before returning to work. The Contractor will inform the COR, if their employee was at risk of exposing Veterans, visitors or VHA employees to a communicable disease.
The Contractor will obtain appropriate background checks. Online questionnaire must be completed and scheduled for review prior to staff arriving at a VA location. Fingerprinting will be required to complete the background check but will not need completed prior to commencing work.
Contractor will be required to obtain a Non-PIV badge from the VA. The Non-PIV badge is good for no more than 180 cumulative days onsite at any facility. If, contractors are expected to perform on-site more than 180 cumulative number of days, the Contractor will be required to obtain a PIV badge with no network access. It is the responsibility of the designated COR to track the number of days the Contractor is performing and collect the PIV badges at the end of the Contractor s term.
1.10 Safety Training Requirements
Contractor-Furnished Safety Training: The Office of Occupational Safety and Health has identified the minimum worker safety standards and related training that are required by respective State Laws and that are applicable to all employees. All Contractors providing service at VA facilities shall follow these established Code of Regulations General Industry Safety Orders (OSHA) section listed below, as a condition of contract award:
Section 3203 Title 8 Illness and Injury Prevention Program. Exception: Employers having fewer than 10 employees shall be permitted to communicate to and instruct orally in general safe work practices with specific instructions with respect to hazards unique to the employees job assignments, as compliance with subsection (a) (3).
Section 5193 Title 8. Blood Borne Pathogens
Section 5194 Title 8. Hazard Communication
The above-listed orders establish minimum standards and apply to-employment s and places of employment s in California as defined by Labor Code Section 6303; provided, however, that when the Occupational Safety and health Standards Board has adopted or adopts safety orders applying to certain industries, occupations or employment s exclusively, in which like conditions and hazards exit, those orders shall take precedence wherever they are inconsistent with the General Industry Safety Orders hereinafter set forth.
The above-listed orders, effective 1 July 1991, require the employer to develop, implement and document written programs, as well as requiring initial and recurring employee training and record keeping. The Contractor shall provide to the COR an annual written certification that each employee has received the State-required safety training; that each employee has received the Hepatitis B vaccination; or provide a written certification from any employee who declines the Hepatitis B vaccination.
Hepatitis B Vaccination: The final rule on Occupation Exposure to Blood Borne Pathogens, 29 CFR Part 1910.1030, states employers shall make available the Hepatitis B vaccine and vaccination series to all employees who have occupational exposure, and post-exposure evaluation and follow-up to all employees who have had an exposure incident. Under the terms of this contract, the Contractor shall either provide, at no expense to the Government, the required vaccination defined herein, or have a letter of declination on file with the Contractor.
All contract employees need to be screened for tuberculosis prior to employment
All contract employees need to be medically cleared to wear respiratory protection
All contract employees shall be cleared for fitness of duty to perform physical tasks required for the job such as lifting a minimum of 50 lbs., prolong standing walking and frequent bending.
All contract employees shall comply with VA policy regarding influenza vaccine for staff and contractors.
A copy of this letter shall also be filed with the COR and placed in the COR s contract file, and an additional copy shall be sent to the VA employee physician s office. Following Contractor employee s exposure to a contaminated needle or other sharp object, the employee shall be seen by a physician. Records of treatment and follow-up shall be maintained for the duration of employment by the contractor and for thirty (30) years thereafter. Copies of treatment and follow up records shall be provided to the COR.
Handling of Regulated Medical Waste, Infectious Medical Waste ( Red Bag Waste and Sharps Containers):
The Contractor may be required to collect bio-hazardous Red Bags waste (double-bagged) and solid, enclosed SHARPS containers from the medical facility exam and treatment rooms, and to deposit the bags and containers in designated bio-hazardous waste container (usually located outside and at the rear of the facility in locked cage or storage facilities). The Contractor shall maintain records on employee training and shall notify the COR appointed under this contract, as to when new annual training is required. The Contractor shall provide a certification of annual training for each employee.
1.11 Contractor s Attire and Identification
The Contractor shall wear a standard custodial type uniform which is easily recognizable and clearly distinguish them as the Contractor. Uniforms shall present a neat, distinctive appearance; shall be clean and maintained in good repair; and shall be worn as designed by the manufacturer. Standard custodial type uniform is defined as collared work short (button-down or polo style) and pants or skirt of twill or similar material (no denim). The Contractor shall wear appropriate footwear that will cover the entire foot for safety purposes.
Identification Tags/Cards. The Contractor shall wear on the front of the uniform, clearly readable name identification (ID) logo identifying the contractor s and employee s name. The Government will issue ID cards to the Contractor after background checks have been completed. The Contractor shall obtain Visitors Badges during the interim period via VA Police or Human Resource Department.
In precaution type isolation situations, the Contractor will be required to wear Personal Protective Equipment (PPE) which will be supplied by the medical facility. Such items are disposable and will be disposed of as directed by the on-site POC.
Contractor s Personal Hygiene: The Contractor s attire and presentation shall be appropriate per industry standard.
1.12 Contractor Training
Contractor personnel shall not be assigned to work until they have completed initial orientation and required training as indicated below under item 5.5.2. Exception: An exception will be made during the first sixty (60) days of contract performance, whereby Contractor s employees who have had general janitorial and OSHA training will be permitted to start work at the VA medical facilities, on the condition that the training specified herein shall be completed within sixty (60) days after contract effective date. The Contractor shall provide an initial training plan to the on-site POC for approval. The initial plan shall include topics, brief statement of content and method of training. Documentation verifying the content of such training and orientation shall be transmitted to the on-site POC and COR when deemed appropriate.
Minimum Contractor-Furnished Training: Initial training shall cover the topics listed below. The Contractor shall accomplish the training within 5 workdays.
General orientation of basic bacteriological concepts, including the basics of how disease is caused and transmitted, how it can be prevented, reduced or contained through proper environmental sanitation methods.
Infection control orientation, relating duty functions to the technical provision of this specification.
Proper use and handling of germicidal detergents, supplies and equipment.
Care and maintenance of Contractor and Government-furnished property.
Familiarization with applicable facility polices/regulations and their effect on sanitation Services.
Familiarization with the Contractors procedures manual.
Individual duties and responsibilities.
Procedures for replenishing cleaning supplies and obtaining equipment repair.
Role of Contractor s personnel in the facility and their impact on patient care
Techniques/methods for measuring quality of work performance
Basic orientation to the facility, function, mission, goals
Facility emergency fire and disaster program
Hazardous Communication Standard
Bloodborne Pathogens
Respiratory Protection
Personal Protective Equipment (PPE) including proper donning and doffing
Utility Operation
Standard Precautions
Body Mechanics/Lifting
Accident Reporting
Sexual Harassment
Ethics
TB-Precautions (PPD)
Hep B
Mercury/Spills
Radiation Training (Government-furnished)
Proper handling of Regulated Medical Waste, Solid Waste, Chemo Waste Handling and Recycling
Linen exchange services, including proper handling and care of all linens.
Compliance and Business Integrity (CBI) Awareness Training: The Contractor shall complete initial compliance awareness training within thirty (30) days of contract award effective date. The Contractor shall also meet the annual compliance awareness refresher training. This requirement can be fulfilled by completing the training module available via the following Internet site: https://www.tms.va.gov/SecureAuth35/
Remedial Training: When notified, the Contractor shall complete remedial training and education to address any detected compliance issues.
Proof of Training: The Contractor shall submit proof of training by providing a copy of the training to the on-site POC or designated representative. The on-site POC will retain proof of training in accordance with applicable Records Control Schedule and provide to the COR when requested.
1.13 Contractor s Quality Control Plan
The Contractor shall establish and maintain a complete quality control program to ensure the requirements of the contract are met. One copy of the Contractor s basic Quality Control Program shall be provided to the on-site POC and COR 15 days after contract award effective date. An updated copy shall be provided the on-site POC and COR as changes occur. The quality control program shall include, but are not be limited to the following:
An inspection system covering the required services. The plan shall specify the areas to be inspected on either a scheduled or unscheduled basis and how often inspections shall be accomplished.
The plan shall provide methods for identifying and preventing deficiencies and how the Contractor shall prevent the level of performance from becoming unacceptable.
On-site records of all inspections conducted by the Contractor and necessary corrective action taken.
A system to record all inspections conducted by the Contractor and record corrective action. These documents shall be made available to the on-site POC and COR or designated representative during the term of the contract.
1.14 Fire Prevention and Emergency Procedures
The Contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the buildings.
Any hazardous incidents created by the Contractor shall be corrected immediately.
The Contractor shall comply with applicable Federal, State, Local and facility safety and fire regulations and codes which are in effect at the beginning of the contract period. The Contractor shall keep abreast of and comply with changes in these regulations and codes applicable to the contract.
The Contractor shall follow applicable facility policies concerning fire and/or disaster events.
Posting Warning Signs: The Contractor shall display approved warning devices in all areas where operations may cause traffic obstruction or personnel hazard. The cleaning of lobbies and corridors, resulting in a temporary wet or slippery floor surface, shall be, appropriately posted with signs and shall be accomplished so that it will not be necessary for personnel or patients to cross the wet surface to gain access to other areas.
1.15 Building Security and Keys
The Contractor shall be responsible for safeguarding all Government property provided for the Contractor s use. At the close of each work period, Government facilities, equipment and materials shall be secured.
The Government shall provide the Contractor with keys to access the required rooms. Access to restricted areas shall be provided to the Contractor by prior arrangements with the COR. Except for keys issued to CEH, keys provided to other Contractor personnel shall not be removed from the premises. Keys shall not be duplicated or issued to any other individuals. All keys not issued for the performance of work being accomplished at the present time shall be secured or returned. The COR or designated representative will perform an inventory of keys assigned to the Contractor at the end of the contract period or as needed. Any keys lost by the Contractor will be replaced by the Government, and the Contractor shall be charged the replacement value of the lost key. The Contractor shall also be responsible for any expense incurred for re-keying of the Facility caused by the lost key. The Contractor shall notify the COR of any lost or suspected lost key within 24 hours.
The Contractor shall not lend keys or open locked rooms or areas to permit entrance by persons other than the Contractor s assigned staff. The Contractor shall be responsible for securing areas upon completion of duties. There may be certain areas identified by the COR in which Contractor personnel must immediately notify the COR or Security Personnel if a door is found unlocked.
When leaving a work area, the Contractor shall turn off lights if the area is unoccupied unless otherwise directed by the COR. The Contractor shall secure and lock the window(s) before leaving the area and if there is difficulty securing the areas, the Contractor shall notify the COR or designated representative.
The Contractor shall comply with the security clearances or access controls imposed.
The Contractor shall turn in all lost articles found during the performance of duties to the COR or designated representative.
If the contractor does not have access to an area due to either not having a key or otherwise, the contractor shall immediately notify the COR and cc the Contracting Officer in writing, so that appropriate action can be taken.
The engineering, IT, and telephone closets are restricted access. The contractor will not have keys to those areas and will require an escort to those areas.
1.16 Interference to Normal Function
The Contractor shall delay or interrupt their work at any time to avoid interference with patient care procedures and the normal function of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and carts.
1.17 Damage and Equipment Loss
The Contractor shall report damages or disfigurement of Government-owned furnishings, fixtures, equipment, and architectural or building structures to the COR immediately. The Contractor shall provide a written report of any damage or disfigurement to items to the COR or designated representative within 24 hours. The Government will not be responsible for Contractor s equipment or belongings that are lost, stolen or damaged.
The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation.
The Contractor shall use reasonable care or be liable for the cost of repairs and/or replacement of damages to Government-owned equipment, fixtures, furnishings, grounds and architectural or building structures.
1.18 Handling of Government Furniture and Equipment
The COR or designated representative will instruct the Contractor what Government items should not to be moved or otherwise handled. Any medical apparatus in use on or by a patient will not be moved or otherwise handled by the Contractor except when prior arrangements have been made with the nurse supervisor.
In emergency situations, the Contractor s assistance may be required to help move patients out of harm s way.
1.19 Conservation of Utilities
The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under condition which precludes the waste of utilities, which shall include:
The Contractor shall not adjust any mechanical equipment controls for heating, ventilation and air conditioning system unless otherwise directed by the COR or designated representative.
The Contractor shall turn-off all water faucets or values when not in usage.
The Contractor shall not use Government telephones for personal reasons.
1.20 Applicable Regulations and Manuals
All work under this contract must be performed in accordance with (1) current Joint Commission Manual (JC); (2) Occupational Safety and Health Agency (OSHA); (3) Environmental Protection Agency (EPA) and Hazardous Materials requirements; (4) regulations cited in this Performance Work Statement (PWS); (5) Site-specific EPS Standard Operating Procedure Guidance and (5) industry standards.
Documents applicable to work described in this section are mandatory and are listed below. The Government will provide the Contractor copies of all regulations, manuals and specifications such as those listed below. Supplements and amendments will be updated and will be full force and effective immediately upon receipt by the Contractor. The policies and procedures of mandatory directives shall always be adhered to. The Contractor shall insure that all mandatory publications are posted and up to date.
Security Clearances, Access Controls, Identification Badges
Facility policies concerning fire / disaster program.
Parking Requirements
Infection Control Manuals
1.21 Required Security Training
All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems:
Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix E relating to access to VA information and information systems;
Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;
The contractor shall provide to the COR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.
Business Associate Agreement (BAA): The Contractor shall execute a BAA upon award of contract. A copy shall be forwarded to the Privacy Officer.
1.22 Information Security Requirements
The C&A requirements do apply and that a Security Accreditation Package is required. The vendor will be in contact or will have access to VA sensitive information. VA sensitive information procedures will be followed per VA Handbook 6500.6.
Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
Information Security and Privacy Training
All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems;
Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, VA Handbook 6500.6, Appendix E relating to access to VA information and information systems;
Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;
Successfully complete the appropriate VA privacy training and annually complete required privacy training;
Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system access to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document e.g., any role-based information security training required in accordance with NIST Special Publication 800-16, Information Technology Security Training Requirements.
The contractor shall provide to the contracting officer and/or the COR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.
Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete.
Contractor Personnel Security Requirements - Information Systems Access
All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.
Access to and Safeguard of VA Information/Computer Systems
The contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems only to the extent necessary to perform the services specified in the contract, agreement, or task order.
The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.
VA Information Custodial Language: Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data- General, FAR 52.227-14(d) (1).
Security Incident Investigation: The term security incident means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.
Section 2: Definitions & Acronyms
2.1 Definitions:
Aseptic Cleaning. Techniques and procedures used under sterile conditions. Aseptic cleaning is the effort taken to clean the interior of building and keep people free from hospital micro-organisms.
Centers for Disease Control & Prevention (CDC). The nation s health protection agency that publishes key health information, including weekly data on all deaths and diseases reported in the US and travelers' health advisories. The CDC also fields special rapid-response teams to halt epidemic diseases
Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Officer (CO). A person with the authority to enter into, administers, and/or terminates contracts and makes related findings. The Contracting Officer is the only individual who has the authority to contractually bind the Government. The Contracting Officer may designate a Government employee to act as his authorized technical representative.
Contracting Officer Representative (COR). The person has been designated as the authorized representative of the Contracting Officer acting within the limits of his/her authority. This individual shall not be authorized to award, agree to, or sign any contract or modification thereto, or in any way to obligate the payment of money by the Government. The COR advises the Contracting Officer on matters relating to this contract, verifies completion of the work, certifies invoices related to completed work, and ensures compliance with all provisions of the contract.
Corrective Action. Action taken by the Contractor to correct a deficiency and identify the cause(s) of the deficiency and provide documentation of correction
Custodial Cleaning. Providing an array of cleaning functions that are vital to the daily operation of the facility to present a clean facility.
Joint Commission (JC). A national organization dedicated to improving the performance, safety, and quality of patient care in health care facilities, and publishers of the Joint Commission on Accreditation Manuals.
Point of Contact (POC). An identified individual with subject matter expertise (SME) of VHA EMS proper cleaning procedures.
Protection. This is preventing damages to surfaces and equipment caused by normal use or improper cleaning procedures.
Quiet Zone. Means normally a noise level of less than 72.B (A) at five feet from the source in patient-occupied areas.
Soil. Dust, dirt, stains, grease, smudges, streaks, spots, lint, odors, organisms, bodily fluids, or any agents that is injurious to health. Soil can be visible such as dust, or can be invisible such as organisms, and odors.
Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Dwell Times: The amount of time that a sanitizer or disinfectant must be in contact with the surface and remain wet, in order to achieve the product s advertised kill rate.
High Touch Areas: Surfaces within a patient room that require more frequent cleaning and disinfection due to having frequent contact with hands. High touch surfaces can be found on the CDC Environmental checklist for monitoring terminal cleaning.
Two-Step Cleaning:
Step One: Cleaning is the necessary first step of any disinfection process. Cleaning removes organic matter, salts, and visible soils, all of which interfere with microbial inactivation. The physical action of scrubbing with detergents and surfactants and rinsing with water removes substantial numbers of microorganisms. If a surface is not cleaned first, the success of the disinfection process can be compromised. Removal of all visible blood and inorganic and organic matter can be as critical as the germicidal activity of the disinfecting agent. When a surface cannot be cleaned adequately, it should be protected with barriers.
Step-Two Disinfection destroys most pathogenic and other microorganisms by physical or chemical means.
Workday. The number of hours per day the Contractor provides services in accordance with the contract.
2.2 Acronyms:
CBI Compliance and Business Integrity
CEH Certified Executive Housekeeper
COR Contracting Officer Representative
EPA Environmental Protection Agency
ID Identification
IT Information Technology
JC Joint Commission
IHEA International Executive Housekeeper Association
NEHA National Executive Housekeeping Association
OSHA Occupational Safety and Health Agency
POC Point of Contact
PWS Performance Work Statement
QASP Quality Assurance Surveillance Plan
VHA Veteran Health Administration
VA Veterans Affairs
36C24820Q1054 Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8
Solicitation 1/1
6/25/20, 11:20 AM