Project Grant R23AP00338
- Federal Grant Award Summary The U.S. Department of Agriculture's Rural Utilities Service (RUS) awarded Georgetown Divide Public Utility District (GDPUD) an $8.837 million Project Grant on May 13, 2025, under the Water and Waste Disposal Systems for Rural Communities program (CFDA 10.760). This Fiscal Year 2022 Disaster Grant–Water Only award, with a completion deadline of May 13, 2027, provides financial assistance for critical water infrastructure repairs and improvements to support the rural...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $3,830,500 Project Grant (CFDA #15.507 - WaterSMART) to the Panoche Water District in Fresno County, California on September 19, 2023. This funding will allow the Panoche Water District to install a 2.9-mile concrete liner on the currently unlined Contour Canal and replace four check structures, three road crossings, and 15 turnouts with pre-cast concrete structures to accommodate necessary trash screens. The project is...
- The U.S. Department of the Interior's Bureau of Reclamation, under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507), awarded the Firebaugh Canal Water District in San Joaquin County, California a $3,786,000 Project Grant on January 15, 2025. The grant will fund the concreting of 2.08 miles of the 3rd Lift Canal and the construction of a 60-acre-foot midchannel storage reservoir adjacent to the lined section. This project is expected to...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $164,225.58 Project Grant (CFDA 15.507 - WaterSMART Program) to the Utica Water and Power Authority in Angels Camp, California. The funding will be used to line 1,200 linear feet of the earthen Utica Canal with a reinforced shotcrete liner. This lining project will help reduce water seepage losses, improve water management and conservation for agricultural use, and reduce sediment loading in the canal. The project will also...
- The U.S. Department of the Interior's Bureau of Reclamation awarded the Columbia Irrigation District in Kennewick, Washington, a $225,990.68 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) on September 4, 2024. The grant will fund the installation of a reinforced concrete liner in approximately 1,400 linear feet of the district's Lateral 2 canal. This project is expected to be completed by December 31, 2025. The concrete lining...
- This Cooperative Agreement provides $1,250,000 in funding from the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) to the North Tahoe Public Utility District (NTPUD). The funding supports the implementation of NTPUD's 2025 Waterline Replacement Project (Water Improvement Project) in Kings Beach, California. Key project activities include the installation of approximately 2,700 linear feet of 8-inch water mains, new 2-inch service lines...
- Under this $8,162,928 federal Project Grant awarded by the Department of the Interior's Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514), the North Kern Water Storage District (NKWSD) will drill and equip a 6 cubic feet per second (CFS) groundwater well, and connect it to the Friant-Kern Canal through a discharge pipeline. This project will enable the conveyance and return of 1,999 acre-feet per year of previously stored water to downstream...
- Federal Project Grant Award Summary The Bureau of Reclamation awarded $611,818 to the Orland-Artois Water District under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) on June 4, 2025. The project involves design and engineering work for new water conveyance infrastructure in Glenn County, California, including the construction of turnouts from the Tehama-Colusa Canal and expansion of the district's buried pipeline system. These infrastructure...
- The U.S. Department of the Interior's Bureau of Reclamation, through its WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507), awarded a $4,511,673 project grant to the Turlock Irrigation District (TID) located in California's Central Valley. The funding will enable TID's Civil Engineering Division to improve and automate five drop structures on the district's main canal. This project involves modifying the drop structures, installing new automated gates, and...
- Federal Grant Award Summary The North Kern Water Storage District received a $9.77 million Project Grant award dated September 16, 2025, through the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507), administered by the Bureau of Reclamation. The project will concrete line approximately 1.4 miles of the Calloway Canal in Kern County, California, with an anticipated completion date of December 31, 2029. This infrastructure improvement is expected to conserve...
THE GEORGETOWN DIVIDE PUBLIC UTILITY DISTRICT (GDPUD), LOCATED ON THE WEST SLOPE OF THE SIERRA NEVADA FOOTHILLS, APPROXIMATELY 45 MILES NORTHEAST OF SACRAMENTO, CALIFORNIA, WILL CONCRETE LINE 1500 FEET OF UNLINED CANAL. THIS PROJECT WILL IMPROVE WATER EFFICIENCY BY ELIMINATING CANAL SCOURING, SEEPAGE LOSSES, AND VEGETATION GROWTH IN THE CANAL. THE SECTIONS THAT WERE CHOSEN TO BE LINED WERE IDENTIFIED IN GDPUD S CAPITAL IMPROVEMENT PLAN AND WILL IMPROVE OVERALL WATER SUPPLY RELIABILITY FOR IT S CUSTOMERS. AT A BASIN LEVEL, IMPLEMENTATION OF THIS PROJECT WILL CONTRIBUTE TO IMPROVEMENT OF DOWNSTREAM RIVER CONDITIONS AND ENVIRONMENTAL CONDITIONS THROUGHOUT THE AMERICAN RIVER WATERSHED. UNDER THIS AGREEMENT, THE RECIPIENT SHALL LINE A TOTAL OF 1,500 FEET OF EARTHEN CANAL WITH CONCRETE. THIS CONCRETE LINING PROJECT WILL OCCUR ON THREE SEGMENTS: MOUNT CEDAR ROAD: COMPLETE 1,100 LINEAR FEET IN A PORTION OF CANAL EXTENDING WEST OF MT. CEDAR ROAD. THIS PORTION IS LOCATION BETWEEN 38.934958, -120.748660 AND 38.934594, -120.752265. BALDERSTON ROAD: COMPLETE TWO 200 LINEAR FEET SECTIONS IN A PORTION OF CANAL ADJACENT TO BALDERSTON ROAD. THIS PORTIONS ARE LOCATED BETWEEN 38.934489, -120.754867 AND 38.932084, -120.754994 AND 38.931363, -120.755483 AND 38.931123, -120.755783.THE BENEFICIARIES OF THIS AGREEMENT WILL BE THE WATER SUPPLY CONSUMERS SERVED BY THE GDPUD.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $0 | 5/29/25 | ||
| Not listed | $0 | 7/18/24 | ||
| Not listed | $79.5k | 7/13/23 |