Project Grant R23AP00325

Award Date 1/2/23
Completion Date 4/30/25
Dollars Obligated $2.6M
Federal Grant Program
15.529
Assistance Type
Project Grant
Place of Performance
Colorado, USA
Similar Awards
The Colorado Rio Grande Restoration Foundation, in partnership with the Rio Grande Headwaters Restoration Project, will receive $530,048 from the Bureau of Reclamation under the Cooperative Watershed Management Program to upgrade two diversion structures and restore adjacent riparian habitat along the Conejos River in Colorado. Funded from July 2022 to June 2024, the Foundation and its partners will improve two diversion structures to ensure full water delivery during low flows through the...
The Bureau of Reclamation awarded a $3,361,800 Project Grant on September 12, 2023 under the Central Valley Project Improvement Act (CFDA 15.512) to the Natomas Central Mutual Water Co. to reconstruct the Elkhorn Diversion on the Sacramento River. The project aims to achieve both fisheries objectives and flood protection improvements through a single construction contract. The reconstruction will screen a 60 CFS diversion on the Sacramento River, benefiting the salmonid population by...
The Bureau of Reclamation, under the Aquatic Ecosystem Restoration Program (CFDA 15.580), awarded a $6,750,000 Cooperative Agreement to the State of Oregon Department of Fish and Wildlife to study, design, and construct fish screens at unscreened diversion points along the Klamath River. This project will enable anadromous fish to occupy historic Klamath River habitats following the removal of the Lower Four Dams by Fall 2024. The State of Oregon Department of Fish and Wildlife will finalize...
This federal Project Grant award of $7,221,070.16, provided by the U.S. Department of the Interior Bureau of Reclamation under the Indian Tribal Water Resources Development, Management, and Protection program (CFDA 15.519), supports the Gila River Indian Community (GRIC) in Arizona to undertake critical dam infrastructure improvements at the Ashurst-Hayden Diversion Dam (AHDD). The key products and services to be delivered under this grant include: replacing the existing flashboards and...
The Bureau of Reclamation awarded a $2,214,625 WaterSMART (CFDA 15.507) grant to The Colorado Rio Grande Restoration Foundation (CRGRF), in partnership with the San Luis Valley Irrigation District, to improve diversion infrastructure on the Farmers Union Canal and Rio Grande 1 Ditch near Del Norte, CO. The project aims to construct a new multi-benefit diversion structure that will provide safe fish and boat passage, enhance aquatic and riparian habitat, and deliver reliable irrigation water...
This federal Project Grant award of $737,735.00 from the U.S. Department of the Interior Fish and Wildlife Service Region 2, under the National Fish Passage Program (CFDA 15.685), is for the Hogback Sluiceway Gate Replacement project. The purpose is to replace the existing damaged gate along an irrigation canal west of Hogback Bend and south of Highway 64, in order to restore the ability for trapped fish to return to the nearby San Juan River. The work will be performed by the Navajo Nation...
The U.S. Department of the Interior's Bureau of Reclamation awarded a $2,360,706 Project Grant under the Cooperative Watershed Management Program (CFDA 15.554) to the Nfria-Wserc Conservation Center, Inc. (doing business as the Western Slope Conservation Center) on April 11, 2024. The project will modernize the Farmers Ditch diversion and headgate structures in west-central Colorado to improve upstream fish passage, increase diversion efficiency, and enhance safety for boaters. Key project...
The Department of the Interior Bureau of Reclamation awarded a $10,562,500 Project Grant to Natomas Central Mutual Water Co under the Central Valley Improvement Act, Title XXXIV (CFDA 15.512) program. The grant will fund reconstruction of the Riverside Diversion to achieve both fisheries and flood protection objectives. Specifically, the awardee will reconstruct the pumping platform to accommodate a new pump meeting hydraulic standards, screening a 45 cubic feet per second diversion on the...
This $1.1 million cooperative agreement from the U.S. Fish and Wildlife Service Region 6 to Trout Unlimited, Inc. will support the Stewart Ditch Diversion Modification Project in Hotchkiss, Colorado. The project aims to address environmental deficiencies caused by the existing push-up rock dam diversion structure on the North Fork of the Gunnison River. Key products and services include removing the existing dam and replacing it with a modern engineered diversion structure. This new...
The U.S. Department of the Interior's Bureau of Reclamation awarded a $4,017,835 WaterSMART (CFDA 15.507) Project Grant to the Paloma Irrigation and Drainage District (PIDD) located in Maricopa County, Arizona. The grant will fund the replacement of 16 manually controlled jack lift gates and 24 manually controlled slide gates along Lateral D with new automated gates, as well as the installation of an automated solar-powered Supervisory Control and Data Acquisition (SCADA) system. This project...

THE OVERALL BENEFIT TO THE PUBLIC AND RECLAMATION WILL BE HAVING AN EFFECTIVE FISH SCREEN OPERATING IN THE GVIC CANAL, THEREBY KEEPING ENDANGERED AND THREATENED FISH IN THE COLORADO RIVER. MORE SPECIFIC ADVANTAGES FOR EACH OF THE PROJECTS IS FURTHER DETAILED BELOW. THERE ARE TWO MAIN ADVANTAGES TO RAISING THE DAM AND THE LOW FLOW CONDITIONS IN THE RIVER SYSTEM THAT HAVE BECOME MORE COMMON OVER THE LAST TWO DECADES HAVE MADE THESE ISSUES BECOME MORE APPARENT. FIRST, WHEN THE COLORADO RIVER IS AROUND 2000 CUBIC FEET PER SECOND (CFS) OR BELOW, THEN THE HEADGATES OF THE GVIC DIVERSION DAM ENTER A PARTIALLY SUBMERGED STATE OF OPERATION. OPERATING GATES IN A PARTIALLY SUBMERGED STATE MAKES MANAGING A CONSTANT FLOW INTO THE CANAL VERY CHALLENGING AND CAN QUICKLY LEAD TO SITUATIONS WHERE THE FISH SCREEN IS BEING OVERLOADED OR LACKING WATER FOR DELIVERIES IN THE CANAL AS WELL AS FISH SCREEN OPERATIONS.SECOND, WHEN FLOWS IN THE COLORADO RIVER BECOME VERY LOW, NEARLY ALL WATER REMAINING IN THE RIVER CAN BE DIVERTED INTO THE GVIC CANAL. DURING THESE TIMES THERE IS SOME WATER WHICH MAKES IT OVER THE DIVERSION DAM INSTEAD OF GOING INTO THE CANAL. IN THIS SITUATION GVIC SHUTS OFF THE FISH RETURN PIPELINE AND STOPS FISH SCREEN OPERATIONS TO ENSURE THEIR WATER USERS RECEIVE THEIR DECREE.THE WORK SHALL INCLUDE 4 MAIN CONSTRUCTION COMPONENTS: RAISING THE EXISTING DIVERSION DAM WITH A CONCRETE CAP PATCHING DETERIORATED AREAS OF THE EXISTING DAM SURFACE OUTSIDE THE CAP AREA REPLACING 4 RADIAL GATES AT THE SOUTHWEST CORNER OF THE DIVERSION DAM SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEMTHE PROJECT SHALL RAISE THE EXISTING DIVERSION DAM CREST APPROXIMATELY 9-18 WITH A CONCRETE CAP OVER THE ENTIRE 1,100 LF FOOT LENGTH OF EXISTING STRUCTURE. THE FISH PASSAGE STRUCTURE AND ASSOCIATED IMPROVEMENTS ON THE NORTHERN END OF THE DIVERSION DAM SHALL NOT BE ALTERED IN ANY WAY. THE WIDTH OF THE EXISTING DIVERSION DAM VARIES BUT THE PROPOSED CAP SHALL INCORPORATE A 12FT WIDE LEVEL SECTION, WHICH WILL ALLOW MAINTENANCE VEHICLES TO TRAVEL ACROSS THE STRUCTURE, THAT THEN TAPERS AT 2H:1V SLOPE TO TIE INTO THE EXISTING DIVERSION DAM ON THE DOWNSTREAM SIDE OF THE CAP. THE UPSTREAM EDGE OF THE CAP SHALL HAVE A ROUNDED EDGE TO FACILITATE THE PASSING OF TRASH AND DEBRIS ACROSS THE STRUCTURE.THE PROJECT SHALL ALSO INVOLVE EXTENSIVE PATCHING OF DETERIORATED PORTIONS OF THE EXISTING DAM SURFACE OUTSIDE THE PROPOSED CONCRETE CAP EXTENTS TO MAINTAIN INTEGRITY OF THE STRUCTURE WHILE REDUCING HYDRAULIC TURBULENCE ACROSS THE STRUCTURE. THIS PATCHING PORTION OF THE PROJECT SHALL BE PART OF THE RECIPIENTS RECURRING OPERATION AND MAINTENANCE ACTIVITIES. SINCE WATER CONTROL MEASURES WILL BE IN PLACE DURING THE DAM RAISE ACTIVITIES, IT IS ALSO THE IDEAL TIME FOR GVIC TO ATTEND TO THESE MAINTENANCE ACTIVITIES.THE FOUR RADIAL SPILL GATES LOCATED IN THE COLORADO RIVER TOWARD THE SOUTHWESTERN CORNER OF THE DIVERSION DAM ARE UTILIZED TO CONTROL FLOWS INTO THE SYSTEM AND OVER THE DIVERSION DAM. IN ORDER TO CAPITALIZE ON THE FULL POTENTIAL OF THE DAM RAISE, THE PROJECT SHALL REPLACE THESE EXISTING GATES WITH NEW RADIAL GATES AND ACTUATORS.THE NEW GATES WILL MATCH THE WIDTH OF THE EXISTING GATES, BUT THEY SHALL BE TALLER TO ACCOMMODATE THE PROPOSED DAM RAISE. THE NEW GATES SHALL BE INSTALLED IN THE EXISTING STRUCTURE BAYS BUT THE SEALING SURFACES ON THE SIDES OF THE GATES SHALL HAVE TO MODIFIED AND RAISED WITH CONCRETE CAPS TO MATCH TO NEW GATE HEIGHTS.THE SCADA SYSTEM TO BE INCORPORATED FOR THE PROJECT SHALL CONTROL THE HEADWORKS OF THE CANAL AS WELL AS THE FISH SCREEN. THEREFORE, ANY NEW EQUIPMENT NEEDS TO COMMUNICATE WITH GVICS EXISTING SCADA INFRASTRUCTURE. THE TRAVELING SCREEN HAS SIGNIFICANTLY MORE MOVING COMPONENTS THAN THE EXISTING FISH SCREEN. THE SCADA SYSTEM SHALL ALLOW THE TRAVELING SCREEN AND CANAL HEADWORKS TO OPERATE AT OPTIMUM EFFICIENCY WITH MINIMAL HUMAN INTERACTIONS.

Posted 8/9/23, 12:00 AM