Project Grant R22AP00501
- Federal Grant Award Summary The Bureau of Reclamation awarded Kern Tulare Water District (KTWD) $4,012,136 under the Reclamation States Emergency Drought Relief program (CFDA 15.514) on July 31, 2025, to construct water banking infrastructure in Bakersfield, California. The project deliverables include drilling and equipping a new groundwater well, installing approximately 8,000 linear feet of pipeline to the Friant Kern Canal, and connecting an existing well to KTWD's well recovery network....
- This $2,684,222 federal Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514) will support the Cawelo Water District in Bakersfield, CA to enhance the region's drought resiliency and increase access to groundwater supplies. The key project components include the construction of a 33-acre-foot capacity reservoir and a 24-acre recharge facility, as well as the installation of a pipeline...
- Under this $8,162,928 federal Project Grant awarded by the Department of the Interior's Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514), the North Kern Water Storage District (NKWSD) will drill and equip a 6 cubic feet per second (CFS) groundwater well, and connect it to the Friant-Kern Canal through a discharge pipeline. This project will enable the conveyance and return of 1,999 acre-feet per year of previously stored water to downstream...
- Summary of Federal Project Grant Award The Bureau of Reclamation awarded $4.6 million to the Southern San Joaquin Municipal Utility District (SSJMUD) under the Reclamation States Emergency Drought Relief program (CFDA 15.514) on June 25, 2025, to construct the Caratan Groundwater Recharge Facility. The project will convert 160 acres of land in Kern County, California, approximately 5 miles southeast of Delano, into recharge ponds capable of providing an additional average annual volume of...
- Federal Grant Award Summary The Bureau of Reclamation awarded the Fresno Irrigation District a $6.0 million Project Grant on September 18, 2025, under the Reclamation States Emergency Drought Relief program (CFDA 15.514) to expand groundwater recharge infrastructure in California's Central Valley. The project encompasses the expansion of an existing groundwater recharge basin by 24 acres and the construction of an additional 20-acre basin, designed to annually recharge approximately 792...
- Federal Grant Award Summary The North Kern Water Storage District received a $9.77 million Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) on September 16, 2025, with an anticipated completion date of December 31, 2029. The primary deliverable involves concrete lining approximately 1.4 miles of the Calloway Canal in Kern County, California, to eliminate seepage losses...
- Federal Grant Award Summary The Bureau of Reclamation awarded Stockton East Water District $387,000 under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) Program (CFDA 15.507) on September 2, 2025, to design a pipeline infrastructure project addressing critical groundwater sustainability challenges in San Joaquin County, California. The project deliverable is a comprehensive pipeline design that will redirect surface water to 11 agricultural irrigation locations currently...
- Federal Grant Award Summary The Bureau of Reclamation awarded Western Canal Water District $557,198 on August 22, 2025, under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) Program (CFDA 15.507) to develop a comprehensive final design package for a fully automated gate structure. The project, with an ultimate completion date of December 31, 2026, will enhance water resource management across the Feather River and Butte Creek watersheds in California's Northern Sacramento...
- Federal Grant Award Summary The Bureau of Reclamation awarded $7.33 million to the Cordua Irrigation District under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) on September 3, 2025. The project involves replacing and retrofitting flow control structures at 12 sites along the Cordua Main Canal in Yuba County, California, and equipping all sites with a cloud-based Supervisory Control and Data Acquisition (SCADA) system. This infrastructure...
- Federal Grant Award Summary The Bureau of Reclamation awarded the California Department of Water Resources (DWR) a $4.08 million Project Grant under the Aquatic Ecosystem Restoration Program (CFDA 15.580) on August 25, 2025, with completion targeted for June 30, 2028. The grant funds a study and preliminary design phase for the Colusa Basin Drain Sacramento River restoration project in northern Yolo County, California. DWR will deliver hydrodynamic modeling, data collection, surveying, and...
1. AWARD PURPOSE -IN NOVEMBER 2020, THE BUREAU OF RECLAMATION, MID-PACIFIC REGION, POSTED THE NOTICE OF FUNDING OPPORTUNITY (NOFO) BOR-CGB-21-F001, "BAY-DELTA RESTORATION PROGRAM: CALFED WATER USE EFFICIENCY GRANTS FOR FISCAL YEARS 2021 AND 2022." AN APPLICATION REVIEW COMMITTEE EVALUATED MULTIPLE APPLICATIONS AGAINST SELECTION CRITERIA INCLUDED IN THE NOFO. RECLAMATION APPROVED A $500,000 GRANT AGREEMENT WITH THE CAWELO WATER DISTRICT (CAWELO OR DISTRICT) FOR THE "FKC PUMP STATION, TURNOUT/IN AND APPURTENANCES PROJECT" (PROJECT). THE TOTAL PROJECT COST IS ESTIMATED TO BE $6,115,000, WITH A $500,000 FEDERAL COST SHARE. THE ANNUAL WATER SAVINGS IS ESTIMATED TO BE 2,160 ACRE-FEET PER YEAR (AFY).THE PROJECT ACHIEVES THE GOALS OF THE NOFO. THIS PROJECT WILL INCREASE WATER CONVEYANCE CAPACITY BY CONSTRUCTING A PUMP STATION AND AN INTERTIE. THE INTERTIE WILL CONVEY AVAILABLE WATER TO GROUNDWATER RECHARGE BASINS OR FOR IRRIGATION PURPOSES IN-LIEU OF PUMPING GROUNDWATER.2. ACTIVITIES TO BE PERFORMED -THE OBJECTIVE OF THIS PROJECT IS TO CONSTRUCT A PUMPING PLANT FOR THE DELIVERY OF WATER THROUGH AN EXISTING 1.8 MILE, 48-INCH DIAMETER PIPELINE LOCATED BETWEEN THE FRIANT KERN CANAL (FKC) AND THE DISTRICT. THE PROJECT WILL CONVEY WET-PERIOD WATER AVAILABLE TO THE DISTRICT INTO THE DISTRICT AT A RATE OF UP TO 100 CFS OR 200 AFD.3. EXPECTED DELIVERABLE OR OUTCOME -THE ACTIVITIES TO BE FUNDED THROUGH THIS ACTION ARE LIMITED TO CONSTRUCTION. ACTIVITIES (AND THEIR ASSOCIATED COSTS) FOR GRANT ADMINISTRATION, REPORT, ENVIRONMENTAL COMPLIANCE, DESIGN, LABOR COMPLIANCE, CONSTRUCTION MANAGEMENT, TRAVEL, ETC. ARE NOT INCLUDED.THE LIMITED PROJECT ACTIVITIES INCLUDE:TASK 1 - CONSTRUCTIONTHE DISTRICT WILL EMPLOY A COMPETITIVE BID PROCESS TO SELECT A CONTRACTOR TO PERFORM ALL CONSTRUCTION ACTIVITIES. THE CONSTRUCTION CONTRACT WILL INCLUDE FURNISHING AND INSTALLING ALL PROJECT COMPONENTS.4. INTENDED BENEFICIARY -THE PROPOSED PROJECT MEETS MULTIPLE PUBLIC PURPOSES. IN ADDITION TO IMMEDIATE GROUNDWATER CONSERVATION AND INCREASED RELIABILITY BENEFITS, THE PROJECT WILL RESULT IN LONG-TERM BENEFICIAL USE OF CONSERVED GROUNDWATER, INCREASED FLEXIBILITY WITH LOCAL AND REGIONAL WATER USE MANAGEMENT, INCREASED OPERATIONAL EFFICIENCY AND WATER QUALITY BENEFITS.5. SUBRECIPIENT ACTIVITIES -THERE ARE NO SUBRECIPIENTS FOR THIS PROJECT.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $0 | 12/11/23 | ||
| Not listed | $0 | 7/20/23 | ||
| Not listed | $500.0k | 7/28/22 |