Breakheart pond DAM is located on breakheart brook in the town of exeter rhode island

Active Project Grant Awarded Last action

Award ID
F24AP01924
Recipient
Awarding agency
Obligated
$85,000

Award facts

Assistance listing
15.685 National Fish Passage
Completion date 54% complete
Funding agency
DOI Fish and Wildlife Service Region 5 Fish and Wildlife Service, Department of the Interior
Place of performance
Exeter, RI, USA

Award details come from USAspending.gov.

Description

Rhode island department of environmental management ridem has been monitoring breakheart brook and its associated impoundment breakheart pond for over 20 years. The lower reach of breakheart brook including breakheart pond are entirely within the arcadia wildlife management area WMA. Breakheart brook is a tributary of the flat river which is a primary tributary of the wood river. The DAM consists of a concrete spillway derelict fishway earthen embankments and concrete abutments. Data show that the impoundment significantly raises water temperatures in the brook therefore during summer months downstream of the DAM becomes mostly unsuitable habitat for coldwater obligate species such as eastern brook trout. Brook trout are found year round above the pond and only for portions of the year below the pond. Ridem has documented that brook trout inhabit the stream below the pond but are not found in this reach during summer months when water temperatures are high. Removal of breakheart pond DAM would reconnect approximately 4.52 miles of stream and reduce water temperatures in the brook and adjoining watercourses. The project will also connect over 45 acres of high value wetlands and riparian habitat when the DAM is removed. This project is one of the highest priority coldwater stream enhancement projects in the state of rhode island and is a priority for ridem. Fish populations in the upper wood river watershed designated as a wild and scenic river will greatly benefit from connectivity improvement in breakheart brook enhancing one of rhode islands best strongholds of wild brook trout. This is anticipated to be a full DAM removal and channel restoration with a project timeline to be completed by 2025.

Quick answers

Who received award F24AP01924?

F24AP01924 was awarded to Rhode Islands Chapter Trout Unlimited by DOI Fish and Wildlife Service Headquarters Region 9 (Fish and Wildlife Service) on July 1, 2024.

How much is award F24AP01924 worth?

$85,000 has been obligated on F24AP01924.

Which agency awarded F24AP01924?

DOI Fish and Wildlife Service Headquarters Region 9 (Fish and Wildlife Service) awarded F24AP01924, with funding from DOI Fish and Wildlife Service Region 5 (Fish and Wildlife Service).