2024 TS helene - emergency repairs to portions of the federal-aid highway NC 226/226A in mcdowell county (division 13)

Active Project Grant Awarded

Award ID
693JJ22640000ER05NCER24361
Recipient
Awarding agency
Obligated
$9,325,289

Award facts

Assistance listing
20.271 Emergency Relief (ER) Program
Completion date 2% complete
Funding
  • $8,047,831.00 Federal
  • $1,277,458.00 Non-federal
Place of performance
North Carolina, USA

Award details come from USAspending.gov.

About this award

The Federal Highway Administration, within the Department of Transportation, awarded Transportation North Carolina Department (doing business as Ncdot Master Account) a $9.325289 million Project Grant on Sep 23, 2026, under the Emergency Relief (ER) Program, CFDA 20.271. The award funds emergency repairs to portions of two federal-aid highways in McDowell County (Division 13) damaged by Tropical Storm Helene: NC 226A between mileposts 0 and 12.1, and NC 226 between mileposts 29.9 and 30.0. The work is intended to restore essential traffic, minimize the extent of damage, and protect remaining facilities.

Scope includes repairing or reconstructing existing subgrade, roadbed bases, and shoulders; pipe and culverts; slopes, with stabilization; asphalt pavements and markings; guardrails; and signage. It also covers re-establishment of permanent stabilization. Work is performed in North Carolina, and the ultimate completion date is Oct 1, 2034.

The ER Program aids State, local, and federal highway agencies with unusually heavy costs of repairing Federal-aid highways and roads on Federal lands damaged by natural disasters or catastrophic failures. Under this award, the recipient is the State transportation agency, and the award is classified as a Project Grant.

Description

Project description
Emergency repairs undertaken at various locations along the following two (2) route in mcdowell county (division 13) to restore essential traffic, to minimize the extent of damage, and/or to protect the remaining facilities along this federal-aid highway route: - NC 226A (route ID 30000080059) between MM 0 and 12.1 - NC 226 (route ID 30000226059) between MM 29.9 and 30.0 scope of work includes the work needed to repair/reconstruct existing subgrade, roadbed bases, and shoulders; repair/reconstruct pipe/culverts; repair/stabilize/reconstruct slopes; repair/reconstruct asphalt pavements and markings; repair/reconstruct guardrails; repair/reconstruct signage; and the RE-establishment of permanent stabilization. '

Quick answers

Who received award 693JJ22640000ER05NCER24361?

693JJ22640000ER05NCER24361 was awarded to Transportation North Carolina Department by Federal Highway Administration (Department of Transportation) on September 23, 2026.

How much is award 693JJ22640000ER05NCER24361 worth?

$9,325,289 has been obligated on 693JJ22640000ER05NCER24361: $8,047,831 in federal funding and $1,277,458 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award