The project will complete the pier B ondock rail support facility program by completing the north rail yard expansion and the south rail yard expansion

Active Project Grant Awarded

Award ID
693JF72440006
Recipient
Awarding agency
Obligated
$472,293,021

Award facts

Completion date 7% complete
Funding
  • $283,375,812.00 Federal
  • $188,917,209.00 Non-federal
Place of performance
Long Beach, CA 90802, USA

Award details come from USAspending.gov.

About this award

The Department of Transportation Maritime Administration awarded $472.293021 million to the City of Long Beach Harbor Department (also known as Port of Long Beach) on June 2, 2026, as a Project Grant under the National Infrastructure Project Assistance (Mega Projects) program, CFDA 20.937. The award completes the Pier B Ondock Rail Support Facility Program through North and South Rail Yard Expansions.

The North Rail Yard Expansion will construct two new mainline tracks, five new approximately 10,000-foot receiving and departure tracks extending from west of the Dominguez Channel to the Pico Avenue rail corridor, and 28 new storage tracks north of the existing Pier B Yard. It also adds active at-grade warning devices and railroad preemption with a new traffic signal at Pier B Street. The South Rail Yard Expansion will add seven new approximately 3,000-foot storage tracks, lengthen and rehabilitate seven existing approximately 3,000-foot storage tracks, construct two new tracks in the Pico Avenue rail corridor, reconfigure tracks near Pier D Street, and build a new compressed air facility. Construction also includes the roadway knuckle at Harbor Avenue and 11th Street and reconfiguration of the Mead Yard ladder and lead track across Anaheim Way. Element 1 covers architectural and engineering design, engineering during construction, project management, and construction support through bid, award, construction, and closeout.

Place of performance is Long Beach, California 90802. Work runs through an ultimate completion date of December 19, 2033. The program funds transportation projects that generate national or regional economic, mobility, or safety benefits.

Description

The north rail yard expansion will construct two new mainline tracks five new approximately 10000 foot receiving and departure tracks extending from west of the dominguez channel to the pico avenue rail corridor and 28 new storage tracks north of the existing pier B yard. IT also includes active at grade warning devices and railroad preemption with a new traffic signal at pier B street. The south rail yard expansion will add seven new approximately 3000 foot storage tracks lengthen and rehabilitate seven existing approximately 3000 foot storage tracks construct two new tracks in the pico avenue rail corridor reconfigure tracks near pier D street and construct a new compressed air facility. Activities to be performed element 1 construction phase architectural and engineering a and E. Engineering during construction management project management and construction support during bid and award construction and closeout. Element construction construct two new mainline tracks five new approximately 10000 foot receiving and departure tracks extending from west of the dominguez channel to the pico avenue rail corridor 28 new storage tracks north of the existing pier B yard construct the roadway knuckle at harbor avenue and 11TH street reconstructed existing pier B rail yard by adding seven new approximately 3000 foot storage tracks and lengthen and rehabilitate seven existing approximately 3000 foot storage tracks construct two new tracks in the pico avenue rail corridor reconfigure mead yard ladder and lead track across anaheim way and add active at grade warning devices and railroad pre emption with a new traffic signal at pier B street reconfigure tracks near pier D street and construct a new compressed air facility with associated piping within the rail yard. Approximate total project quantities include 175000 feet of new track 150 new items of special track work and 150REMOTELY controlled power switch operators. Deliverables expected outcomes from page 10 schedule G of the grant agreement intended beneficiary city of long beach. Subrecipient activities none. Measure freight movements. Projected outcome an increase in the total number of containers moved by on dock rail. Category and description economic competitiveness a table that shows the total number of containers and the total number of containers moved by on dock rail in the study area. Measurement frequency annual. Measure gross tons. Projected outcome an increase in cargo tonnage moved through marine terminals. Category and description economic competitiveness the total number of gross short tons that moved through the study are. Measurement frequency annual.

Quick answers

Who received award 693JF72440006?

693JF72440006 was awarded to City Of Long Beach by Maritime Administration (Department of Transportation) on June 2, 2026.

How much is award 693JF72440006 worth?

$472,293,021 has been obligated on 693JF72440006: $283,375,812 in federal funding and $188,917,209 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award