- Federal Grant Award Summary The Federal Aviation Administration's (FAA) Southern Region awarded County of Palm Beach $26.73 million under the Airport Improvement Program (CFDA 20.116) on July 14, 2026, for Phase 2 construction activities supporting runway rehabilitation and lighting system improvements at West Palm Beach International Airport. The project will rehabilitate 10,000 feet of existing paved Runway 10L/28R and its associated lighting infrastructure to maintain structural integrity,...
- Federal Grant Award Summary The Federal Aviation Administration (FAA) awarded $3.84M to the County of Palm Beach under the Airport Improvement Program (CFDA 20.106) on July 8, 2025, for taxiway reconstruction at airports serving the West Palm Beach, Florida region. The project involves the complete reconstruction of 700 feet of Taxiway M and 300 feet each of connector taxiways M1 and M2, which have reached the end of their useful lives. This infrastructure improvement project is scheduled for...
- Federal Grant Award Summary The County of Palm Beach received a $12.5 million Project Grant from the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) on June 9, 2025, to support infrastructure expansion at West Palm Beach International Airport. This award funds Phase 2 of Terminal B expansion, consisting of 29,000 square feet of terminal improvements designed to accommodate increased passenger volume and aircraft operations. The funded improvements...
- This $2,000,000 federal grant award from the U.S. Department of Transportation Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) will fund Phase 1 design work to rehabilitate 10,000 feet of Runway 10L/28R and the existing lighting system at West Palm Beach International Airport. The project aims to maintain the structural integrity of the runway, minimize foreign object debris, and extend the useful life of both the runway and lighting infrastructure. This...
- Federal Grant Award Summary The Federal Aviation Administration (FAA) awarded $605,594.74 to the County of Palm Beach under the Airport Improvement Program (CFDA 20.106) on July 22, 2025, to complete the final construction phase of a taxiway reseal and resurfacing project. The project encompasses the resealing of 4,430 linear feet of existing Taxiway A pavement at a nonprimary airport in the Pahokee, Florida area, with work to be performed at Palm Springs, FL. This construction funding extends...
- Summary The Federal Aviation Administration (FAA) Southern Region awarded $225,593.68 to the County of Palm Beach on June 26, 2026, under the Airport Infrastructure Grants program (CFDA 20.117) to reconstruct the Precision Approach Path Indicator (PAPI) system for Runway 9R/27L at West Palm Beach International Airport. The project involves replacement of the PAPI systems at both runway thresholds, which have reached the end of their useful lives and require modernization to maintain runway...
- Federal Grant Award Summary The Federal Aviation Administration (FAA) awarded the County of Palm Beach $230,711.58 under the Airport Improvement Program (CFDA 20.106) on July 22, 2025, to reconstruct weather reporting equipment at airports associated with West Palm Beach, Florida. The project involves replacement of an existing Automated Weather Observing System (AWOS-III) that has reached the end of its useful life. The grant carries a completion date of July 21, 2029, allowing the awardee four...
- The Federal Aviation Administration (FAA) awarded the County of Palm Beach $916,803.16 under the Airport Improvement Program (CFDA 20.106) on September 17, 2025, to support critical infrastructure improvements at a nonprimary airport serving the Pahokee, Florida area. The grant funds the final construction phase of a comprehensive three-component airport rehabilitation project: rehabilitation of 800 linear feet of the existing general aviation terminal access road, reseal and resurface of 20,390...
- This $2.2 million project grant from the Department of Transportation Federal Aviation Administration Southern Region will rehabilitate six existing access road bridges to extend their useful lives. Awarded on July 25, 2022 under the Airport Improvement Program, COVID-19 Airports Programs, and Infrastructure Investment and Jobs Act Programs (CFDA 20.106), the funding will be administered by the County of Palm Beach Board of Commissions to provide infrastructure improvements for airports...
- Federal Grant Award Summary The City of Palm Springs received a $6.31 million Project Grant from the Federal Aviation Administration (FAA) under the Airport Improvement Program, Infrastructure Investment and Jobs Act Programs, and COVID-19 Airports Programs (CFDA 20.106), awarded on September 12, 2025, with an ultimate completion date of September 11, 2029. This grant funds Phase 1 of a terminal reconstruction project at Palm Springs International Airport, which includes site enabling work,...
The Federal Aviation Administration (FAA) Southern Region awarded $3.93 million to the County of Palm Beach through the Airport Infrastructure Grants program (CFDA 20.117) on July 14, 2026, for runway rehabilitation work at West Palm Beach International Airport. This Project Grant funds Phase 2 construction activities to rehabilitate 10,000 linear feet of existing paved Runway 10L/28R, with the work designed to maintain structural integrity, minimize foreign object debris accumulation, and extend the runway's useful life. The grant represents a portion of the eligible construction costs, with the remaining eligible phase costs funded through a separate Airport Improvement Program grant. The project is scheduled for completion by July 13, 2030, and will be performed at the Palm Springs, Florida location of the airport. The Airport Infrastructure Grants program, established under the Infrastructure Investment and Jobs Act, allocates $14.5 billion over five years to support runway, taxiway, safety, sustainability, and terminal projects at airports listed in the National Plan of Integrated Airport Systems. Eligible recipients include states, counties, municipalities, U.S. territories, Indian tribes, and public-use airports meeting specified criteria. Grant periods typically run a maximum of four years, with most projects completing within two to three years of award execution.Federal Project Grant Award Summary
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $2.9m | 7/14/26 |