Lacking dams on the mainstem, the pere marquette river is michigans only free-flowing river in the lake michigan watershed
Active Grant Awarded
- Award ID
- F26AP00057
- Recipient
-
Conservation Resource Alliance UEI NYBCJDNNLRW8
- Awarding agency
-
DOI Fish and Wildlife Service Headquarters Region 9
Fish and Wildlife Service, Department of the Interior
- Obligated
- $570,454
Award facts
- Assistance listing
- 15.688 Great Lakes Fish and Wildlife Restoration Act
- Completion date 32% complete
- Funding
-
- $420,454.00 Federal
- $150,000.00 Non-federal
- Funding agency
- DOI Fish and Wildlife Service Region 3 Fish and Wildlife Service, Department of the Interior
- Place of performance
- Baldwin, MI 49304, USA
Award details come from USAspending.gov.
About this award
The Department of the Interior Fish and Wildlife Service Region 3 awarded Conservation Resource Alliance $570,454 on July 23, 2026, through Grant F26AP00057 under the Great Lakes Fish and Wildlife Restoration Act (Assistance Listing 15.688). The award funds removal of the Baldwin Dam on the Baldwin River in the Village of Baldwin, Michigan (ZIP 49304), on an 18.6-acre parcel, with the ultimate completion date set for August 31, 2027. The dam carries a downstream hazard classification of significant and a condition assessment of unsatisfactory, its flashboards have been removed for safety reasons, and water is seeping through multiple channels and 10 fish raceways that are cracking, spalling, and filled with sediment or vegetation. The removal restores a single river channel with a stable floodplain, which eliminates the failure risk to the main dam and fish hatchery infrastructure. The project will reconnect 58 miles upstream, restore 3,000 of river channel with instream habitat and connected floodplain, block sea lamprey passage with a seasonally raised barrier, and prevent 20,500 cubic yards of sediment from migrating 71 miles downstream. The options analysis is complete, and the design and permits phase is fully funded and underway, with construction as the next step. The award is classified as a grant, and the source names no sub-recipients.
Description
There is however one DAM on the baldwin river, the baldwin DAM in the village of baldwin. The DAM has a downstream hazard classification of significant, a condition assessment of unsatisfactory, and the flash boards have been removed for safety reasons. Water is currently flowing and seeping through multiple channels plus the 10 fish raceways, which are cracking, spalling and full of sediment or overgrown with vegetation. The failure of the main DAM and fish hatchery infrastructure is eliminated by restoring a single river channel with stable floodplain throughout the 18.6 acre parcel situated in the village of baldwin. The options analysis for DAM removal and sea lamprey barrier has been completed and the design and permits phase is fully funded and underway with construction as the following step. The baldwin river DAM removal effort in the pere marquette river watershed will reconnect 58 miles upstream, restore 3,000 of river channel with instream habitat and connected floodplain, block sea lamprey passage with a seasonally raised barrier, and prevent 20,500 cubic yards of sediment from migrating to 71 miles downstream.
Quick answers
Who received award F26AP00057?
F26AP00057 was awarded to Conservation Resource Alliance by DOI Fish and Wildlife Service Headquarters Region 9 (Fish and Wildlife Service) on July 23, 2026.
How much is award F26AP00057 worth?
$570,454 has been obligated on F26AP00057: $420,454 in federal funding and $150,000 in non-federal funding.
Which agency awarded F26AP00057?
DOI Fish and Wildlife Service Headquarters Region 9 (Fish and Wildlife Service) awarded F26AP00057, with funding from DOI Fish and Wildlife Service Region 3 (Fish and Wildlife Service).