UAB ST. Vincent's blount radiology CT scanner suite construction project and purchase and installation of a GE revolution apex CT scanner. - 1. Procurement & equipment overview a. System model: GE…

Active Grant Awarded

Award ID
CE160120
Recipient
Awarding agency
Obligated
$1,667,000

Award facts

Assistance listing
93.493 Congressional Directives
Completion date 5% complete
Funding agency
Bureau of Primary Health Care Health Resources and Services Administration, Department of Health and Human Services
Place of performance
Alabama, USA

Award details come from USAspending.gov.

About this award

The Department of Health and Human Services Health Resources and Services Administration awarded Grant CE160120 to Saint Vincents Blount, in the amount of $1.667 million on September 23, 2026, under the Congressional Directives program (CFDA 93.493). Congressional Directives implement projects identified in the Consolidated Appropriations Act, 2022 and its committee reports. The Bureau of Primary Health Care is listed as the agency's alternate name.

The award funds the UAB St. Vincent's Blount radiology CT scanner suite project, which covers purchase and installation of a GE Revolution Apex Elite Power Pro CT scanner to replace legacy imaging hardware. Suite construction runs four months, from August through November 2026, in three phases. Phase 1 covers decommissioning and demolition of the legacy scanner and existing cabinetry, partitions, and flooring (weeks 1-3). Phase 2 covers structural reinforcement within the floor and gantry ceiling and augmented lead-lined wall shielding (weeks 4-10). Phase 3 covers MEP infrastructure, including an upgraded dedicated 480V electrical service and a localized uninterruptible power supply (weeks 11-13).

To maintain patient care during construction, the recipient deploys a mobile CT rental. The climate-controlled, fully shielded coach houses a multi-slice CT system, an integrated patient lift, and a dedicated reading workstation. It is staged in the ambulance bay and physician parking area adjacent to the radiology department. Facility technologists staff the unit, and all images route to the existing PACS network. Pad installation, utility hookups, and safety inspections are scheduled for July 2026.

The ultimate completion date is September 29, 2029. Place of performance is Alabama, USA. The assistance type is Grant.

Description

UAB ST. Vincent's blount radiology CT scanner suite construction project and purchase and installation of a GE revolution apex CT scanner. - 1. Procurement & equipment overview a. System model: GE revolution apex elite power pro CT scanner. B. Key capabilities: features up to 160 MM whole organ detector coverage, industry-leading 0.23-second rotation speed, and deep learning-based image processing for advanced diagnostic clarity. C. Objective: replace legacy imaging hardware to reduce scan times, lower radiation doses, and increase patient throughput. 2. Mobile CT rental (continuity of care). A deployment timeline: on-site pad installation, utility hookups, and safety inspections will be completed in july 2026, ensuring immediate clinical availability when suite construction begins in august 2026. B. Location: staged in the ambulance BAY/physician parking area adjacent to the radiology department for direct, secure patient access. C. Specifications: climate-controlled, fully shielded mobile coach housing a high-performance multi-slice CT system, integrated patient lift, and a dedicated reading workstation. D. Staffing & safety: staffed by facility technologists, with all images routed directly to the existing pacs network. 3. Construction & suite preparation a. Timeline: 4 months (august 2026 - november 2026). B. Phase 1: decommissioning & demolition (weeks 1-3): safely power down, DE-install, and remove the legacy scanner. Demolish existing cabinetry, non-loadbearing partitions, and outdated flooring. C. Phase 2: structural & shielding upgrades (weeks 4-10): install heavy-duty, structural reinforcement within the floor and gantry ceiling to support the weight of the new gantry and patient table., augment lead-lined wall shielding to meet radiation compliance standards for high-power CT operations. [C. Phase 3: MEP infrastructure (weeks 11-13): upgrade dedicated 480V electrical service and install a localized uninterruptible power supply (UPS). Enhance the HVAC system to handle the high heat dissipation of the advanced X-RAY tube. D. Phase 4: finishes & inspections (week 14-16): install leaded glass, medical-grade antimicrobial flooring, and moisture resistant ceilings, followed by state radiation safety signoffs. 4. Installation, calibration & go-live a. Equipment delivery: rigged into the renovated suite in december 2026.B. Calibration & physics testing (december 2026): GE engineers perform mechanical calibration, and a certified medical physicist conducts phantom and radiation safety testing. C. Staff training: clinical applications specialists conduct hands-on protocol training for technologists and radiologists. D. Go-live: slated for early january 2027.

Quick answers

Who received award CE160120?

CE160120 was awarded to Saint Vincents Blount by Office of Federal Assistance Management (Health Resources and Services Administration) on September 23, 2026.

How much is award CE160120 worth?

$1,667,000 has been obligated on CE160120.

Which agency awarded CE160120?

Office of Federal Assistance Management (Health Resources and Services Administration) awarded CE160120, with funding from Bureau of Primary Health Care (Health Resources and Services Administration).

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award