Project abstract summaryuei: U5QGAXDQYYZ6COUNTIES: SAN diego county, californiaasap: 0606469CONGRESSIONAL district: CA-48THE LA jolla band of luiseo indians (the tribe) requests $355,635 of tribal…

Active Grant Awarded

Award ID
A26AP00139
Recipient
Awarding agency
Obligated
$355,635

Award facts

Assistance listing
15.148 Tribal Energy Development Capacity Grants
Completion date 12% complete
Place of performance
Pauma Valley, CA 92061, USA

Award details come from USAspending.gov.

About this award

The Department of the Interior's Bureau of Indian Affairs Central Office awarded a grant of $355,635 to the La Jolla Band of Luiseno Indians on August 26, 2026, under the Tribal Energy Development Capacity Grants program (CFDA 15.148). The award funds Topic Area 2, Traditional TEDC Capacity Development, to complete the tribe's energy organizational options study and initial formation. The reservation in the Palomar Mountain foothills is served entirely by San Diego Gas and Electric over two overhead transmission lines that cross fire-prone terrain. The reservation was de-energized during shutoffs in December 2024 and January 2025, and the tribe's 2025 electricity costs reached $220,998, at an effective rate of $0.40 per kilowatt-hour. The period of performance ends August 23, 2028, and place of performance is Pauma Valley, California 92061.

Description

Project abstract summaryuei: U5QGAXDQYYZ6COUNTIES: SAN diego county, californiaasap: 0606469CONGRESSIONAL district: CA-48THE LA jolla band of luiseo indians (the tribe) requests $355,635 of tribal energy development capacity (TEDC) funding under topic area 2: traditional TEDC capacity development to complete the ljlbi energy organizational options study and initial formation. The tribe S reservation sits in the rugged foothills of palomar mountain in northeast SAN diego county and is served entirely by SAN diego gas and electric (SDG E) through two overhead transmission lines that traverse steep, fire-prone terrain. The tribe S electricity costs rose 42 percent between 2022 and 2025, reaching $220,998 in 2025 at an effective rate of $0.40 per kilowatt-hour, more than twice the national average. The reservation was DE-energized during SDG E S largest public safety power shutoff since 2020 in december 2024 and again during a santa ANA wind event in january 2025. The overhead lines serving the reservation cross some of the most fire-prone terrain in california in 2007, the poomacha fire started here and had catastrophic effects, consuming 94 percent of the tribes reservation. The tribe has been building energy momentum for more than a decade. A 2022 DOE office of indian energy award ($511,610) funded the installation of a solar PV array and battery storage system at the LA jolla trading post, the tribe S primary community fuel and supply hub. Grid alternatives and partner organizations have helped 50 of the tribe S 215 residential homes deploy solar PV and battery storage. A recent EPA climate pollution reduction grants (CPRG) implementation award totaling $7.1 million is actively deploying eight measures across the reservation, including residential solar and battery storage at 165 homes, air source heat pumps at all 215 tribal homes, fleet electrification, EV charging infrastructure, and building energy standards. The tribe has received four consecutive years of section 40101(D) grid resilience formula grant allocations totaling more than $1.1 million. A separate energy and mineral development program (EMDP) feasibility study, expected to conclude in fall 2026, will deliver a prioritized list of specific microgrid and distribution projects before this TEDC project begins. What the tribe does not yet have is the organizational and regulatory structure to govern this growing energy portfolio. These pressures share a common thread: each requires organizational authority and capacity to address. High electricity rates can be countered through ownership, negotiation, or regulatory power, but only with a governance structure behind them. Reliability failures and wildfire exposure can be mitigated through grid hardening and resilient infrastructure, but the tribe can direct that work to maximize on-reservation impact only with the organizational standing to act independently. The CPRG measures that the tribe is deploying now require procurement management, contractor coordination, and a long-term operations and maintenance capacity that currently has no formal home in tribal government. This TEDC project creates that home and puts the tribe in the drivers seat to achieve its energy goals. This project will evaluate four organizational pathways, ranging from building internal capacity within the existing utility relationship to forming a tribally owned utility, against the tribe S own priorities for affordability, reliability, sovereignty, and implementation readiness. The project is structured in three phases over twelve months, anchored by two in-person planning sessions where tribal council will direct the evaluation and select a pathway for implementation. The project will conclude with a governing document tailored to the selected pathway and an implementation roadmap connecting this work directly to the project list produced by the tribe S EMDP study, the ongoing CPRG implementation activities, and the 40101(D) grid RE

Quick answers

Who received award A26AP00139?

A26AP00139 was awarded to La Jolla Band Of Luiseno Indians by Central Office (Bureau of Indian Affairs and Indian Education) on August 26, 2026.

How much is award A26AP00139 worth?

$355,635 has been obligated on A26AP00139.