100%
Skip to main content
Platform
GovTribe AI
AI-powered insights to accelerate your government contracting workflow.
MCP Server
Connect GovTribe to your AI tools.
Beacon
Find and connect with key government decision-makers.
Profiles
Federal Agencies
Federal Contract Vehicles
Federal Grant Programs
Major Defense Acquisition Programs
NAICS Categories
PSC Categories
States
Jurisdictions
NIGP Categories
UNSPSC Categories
Vendors
Enrichment By Clearbit
Reports
New Entrants
Funding Analysis
Vehicle Analysis
Groups
Capture
Pipelines
Pursuits
Alerts
Teaming
Data
Awards
Forecasts
Federal Opportunities
State & Local Opportunities
Files
Prime and Subcontractors
Activity
Search
Exports
Solutions
Use Case
Opportunity Identification
Capture Management
Competitive Intelligence
Teaming & Partner Identification
Proposal Management
Strategic Leadership
Go-to-Market Strategy
Industry
Federal Contractors
State & Local Contractors
Grant Seekers
Government Agencies
Research & Consulting
Pricing
More
About Us
Features
Get A Demo
Sign Up
Blog
User Guide
Data Model
GovTribe for Agents
Login
Contact sales
Try for free
Login
Contact sales
Try for free
All Federal Grant Awards
Project Grant R17AP00050
Award Date
9/13/17
Completion Date
9/12/23
Dollars Obligated
$6.8M
Overview
Activity
10
Transactions
10
Subawards
Similar Awards
Federal Agency
Bureau of Reclamation
Awardee
Sunnyside Division Board Of Control (GN7RD38QSNF1)
Federal Grant Program
15.531
Assistance Type
Project Grant
Place of Performance
Sunnyside, WA, USA
Update #1
Update #2
ELIPS PHASE IID
Posted 9/13/17
5
1
2
Mod #
Description
ReasonForModification
Federal Obligation
Date
Not listed
AWARD PURPOSE: IN 1998 SUNNYSIDE DIVISION BOARD OF CONTROL (SDBOC) COMPLETED A WATER CONSERVATION PLAN THAT INCLUDED LONG-TERM REHABILITATION OF CONVEYANCE FACILITIES. SDBOC HAS COMPLETED TWO PHASES OF CANAL AND LATERAL LINING (PHASE I AND PHASE IIB) REPLACING MANY OF THE ORIGINAL CHECK STRUCTURES AND HAS PURSUED AN AGGRESSIVE PROGRAM OF CONVERTING DITCHES TO PIPED LATERALS.THIS WATER CONSERVATION PLAN WAS REVIEWED AND ACCEPTED FOR FEASIBILITY INVESTIGATION BY RECLAMATION AND ECOLOGY. SDBOC COMPLETED THE FEASIBILITY INVESTIGATION IN MARCH OF 2007.THE ENCLOSED LATERAL IMPROVEMENT PROJECTS (ELIPS) IS THE RESULT OF A SETTLEMENT AGREEMENT BETWEEN THE BUREAU OF RECLAMATION (RECLAMATION), WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY), YAKAMA NATION TRIBES, AND SDBOC IN THE YAKIMA BASIN WATER RIGHTS ADJUDICATION.THE PURPOSE OF ELIPS IS TO CONVERT OPEN IRRIGATION DITCHES PIPES AND WEIR BOXES TO ENCLOSED LATERALS AND INLINE FLOW METERS. GRAVITY PRESSURE IN MOST CASES WILL ALLOW LANDOWNERS TO ELIMINATE PUMPS OR REDUCE PUMP HORSEPOWER REQUIREMENTS. OTHER BENEFITS TO ENCLOSED LATERALS INCLUDE, IMPROVED ON FARM CONTROL OF IRRIGATION WATER, NO LATERAL LANDOWNER END SPILLS, REDUCED SEEPAGE LOSSES, IMPROVED IRRIGATION DRAIN WATER QUALITY, IMPROVED PUBLIC SAFETY, REDUCED OPERATION AND MAINTENANCE COSTS, AND IN COMBINATION WITH OTHER CONSERVATION PROJECTS OVERALL IMPROVED OPERATIONAL EFFICIENCY.ACTIVITIES TO BE PERFORMED: THE TOTAL AREA COVERED UNDER ELIPS IS 46,000 ACRES INCLUDING 1,000 ACRES THAT WILL BE ENCLOSED TO MITIGATE FOR OPERATIONAL CHANGES REQUIRED TO MANAGE THE LOWER CANAL FLOWS. UNDER PHASE II OF THE ELIPS, SDBOC WILL REDUCE ITS ANNUAL DIVERSION BY 46CFS, 16,500 ACRE-FEET ANNUALLY.THE SDBOC WILL REPLACE CONCRETE WEIR BOXES AND 16.7 MILES OF 2 OPEN DITCH LATERALS DIVERTED FROM THE MAIN CANAL AT CANAL MILE POST 51.87 AND 51.18, WITH ENCLOSED CONDUIT PRESSURE PIPE (36 PIPE) AND FLOW METERS. THESE LATERALS IRRIGATE 2,929 ACRES AND ARE LOCATED IN THE RIVER DIVERSION CANAL SECTION ON THE SUNNYSIDE CANAL KNOWN AS PHASE IID.EXPECTED DELIVERABLES OR OUTCOMES: THE SDBOC PARTICIPATES IN THE BASIN CONSERVATION PROGRAM TO EQUIP ALL SURFACE WATER DELIVERY SYSTEMS WITHIN THEIR BOUNDARIES WITH VOLUMETRIC WATER METERS OR EQUALLY EFFECTIVE WATER MEASURING METHODS. THE SDBOC WILL REPLACE TWO OPEN LATERALS PIPES AND CONCRETE WEIR BOXES WITH ENCLOSED PRESSURE PIPE AND FLOW METERS THAT WILL BENEFIT THE PUBLIC AND WATER USERS.THE BENEFITS INCLUDE:ELIMINATING DELIVERY SYSTEM WATER LOSSES.INCREASED WATER SAVINGS.INCREASING THE YAKIMA RIVER IN-STREAM FLOWS TO BENEFIT FISH AND WILDLIFE.IMPROVING PROJECT WIDE WATER MANAGEMENT.IMPROVING THE AVAILABILITY OF WATER SUPPLIES FOR IRRIGATION USERS.IMPROVING THE QUALITY OF WATER IN THE YAKIMA BASIN.THE PROJECT GOALS ARE TO:CONSERVE WATER THROUGH IMPROVED IRRIGATION DELIVERY AND WATER MONITORING SYSTEMS. PROVIDE CONSERVED WATER FOR THE PROTECTION AND AUGMENTATION OF FISH AND WILDLIFE RESOURCES, AND,IMPROVE THE QUALITY OF WATER IN THE YAKIMA RIVER BASIN.INTENDED BENEFICIARIES: ONLY DISTRICTS WITH AN APPROVED YRBWEP CONSERVATION PLAN AND FEASIBILITY STUDY ARE ELIGIBLE FOR YRBWEP IMPLEMENTATION FUNDING. THIS WILL INCLUDE THE IRRIGATION DISTRICT S WATER CONSERVATION PLANNING FOR IRRIGATORS FARMS INTERESTED IN IMPROVING WATER QUALITY IN YAKIMA BASIN.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NA
$0
11/4/24
Not listed
AWARD PURPOSE: IN 1998 SUNNYSIDE DIVISION BOARD OF CONTROL (SDBOC) COMPLETED A WATER CONSERVATION PLAN THAT INCLUDED LONG-TERM REHABILITATION OF CONVEYANCE FACILITIES. SDBOC HAS COMPLETED TWO PHASES OF CANAL AND LATERAL LINING (PHASE I AND PHASE IIB) REPLACING MANY OF THE ORIGINAL CHECK STRUCTURES AND HAS PURSUED AN AGGRESSIVE PROGRAM OF CONVERTING DITCHES TO PIPED LATERALS.THIS WATER CONSERVATION PLAN WAS REVIEWED AND ACCEPTED FOR FEASIBILITY INVESTIGATION BY RECLAMATION AND ECOLOGY. SDBOC COMPLETED THE FEASIBILITY INVESTIGATION IN MARCH OF 2007.THE ENCLOSED LATERAL IMPROVEMENT PROJECTS (ELIPS) IS THE RESULT OF A SETTLEMENT AGREEMENT BETWEEN THE BUREAU OF RECLAMATION (RECLAMATION), WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY), YAKAMA NATION TRIBES, AND SDBOC IN THE YAKIMA BASIN WATER RIGHTS ADJUDICATION.THE PURPOSE OF ELIPS IS TO CONVERT OPEN IRRIGATION DITCHES PIPES AND WEIR BOXES TO ENCLOSED LATERALS AND INLINE FLOW METERS. GRAVITY PRESSURE IN MOST CASES WILL ALLOW LANDOWNERS TO ELIMINATE PUMPS OR REDUCE PUMP HORSEPOWER REQUIREMENTS. OTHER BENEFITS TO ENCLOSED LATERALS INCLUDE, IMPROVED ON FARM CONTROL OF IRRIGATION WATER, NO LATERAL LANDOWNER END SPILLS, REDUCED SEEPAGE LOSSES, IMPROVED IRRIGATION DRAIN WATER QUALITY, IMPROVED PUBLIC SAFETY, REDUCED OPERATION AND MAINTENANCE COSTS, AND IN COMBINATION WITH OTHER CONSERVATION PROJECTS OVERALL IMPROVED OPERATIONAL EFFICIENCY.ACTIVITIES TO BE PERFORMED: THE TOTAL AREA COVERED UNDER ELIPS IS 46,000 ACRES INCLUDING 1,000 ACRES THAT WILL BE ENCLOSED TO MITIGATE FOR OPERATIONAL CHANGES REQUIRED TO MANAGE THE LOWER CANAL FLOWS. UNDER PHASE II OF THE ELIPS, SDBOC WILL REDUCE ITS ANNUAL DIVERSION BY 46CFS, 16,500 ACRE-FEET ANNUALLY.THE SDBOC WILL REPLACE CONCRETE WEIR BOXES AND 16.7 MILES OF 2 OPEN DITCH LATERALS DIVERTED FROM THE MAIN CANAL AT CANAL MILE POST 51.87 AND 51.18, WITH ENCLOSED CONDUIT PRESSURE PIPE (36 PIPE) AND FLOW METERS. THESE LATERALS IRRIGATE 2,929 ACRES AND ARE LOCATED IN THE RIVER DIVERSION CANAL SECTION ON THE SUNNYSIDE CANAL KNOWN AS PHASE IID.EXPECTED DELIVERABLES OR OUTCOMES: THE SDBOC PARTICIPATES IN THE BASIN CONSERVATION PROGRAM TO EQUIP ALL SURFACE WATER DELIVERY SYSTEMS WITHIN THEIR BOUNDARIES WITH VOLUMETRIC WATER METERS OR EQUALLY EFFECTIVE WATER MEASURING METHODS. THE SDBOC WILL REPLACE TWO OPEN LATERALS PIPES AND CONCRETE WEIR BOXES WITH ENCLOSED PRESSURE PIPE AND FLOW METERS THAT WILL BENEFIT THE PUBLIC AND WATER USERS.THE BENEFITS INCLUDE:ELIMINATING DELIVERY SYSTEM WATER LOSSES.INCREASED WATER SAVINGS.INCREASING THE YAKIMA RIVER IN-STREAM FLOWS TO BENEFIT FISH AND WILDLIFE.IMPROVING PROJECT WIDE WATER MANAGEMENT.IMPROVING THE AVAILABILITY OF WATER SUPPLIES FOR IRRIGATION USERS.IMPROVING THE QUALITY OF WATER IN THE YAKIMA BASIN.THE PROJECT GOALS ARE TO:CONSERVE WATER THROUGH IMPROVED IRRIGATION DELIVERY AND WATER MONITORING SYSTEMS. PROVIDE CONSERVED WATER FOR THE PROTECTION AND AUGMENTATION OF FISH AND WILDLIFE RESOURCES, AND,IMPROVE THE QUALITY OF WATER IN THE YAKIMA RIVER BASIN.INTENDED BENEFICIARIES: ONLY DISTRICTS WITH AN APPROVED YRBWEP CONSERVATION PLAN AND FEASIBILITY STUDY ARE ELIGIBLE FOR YRBWEP IMPLEMENTATION FUNDING. THIS WILL INCLUDE THE IRRIGATION DISTRICT S WATER CONSERVATION PLANNING FOR IRRIGATORS FARMS INTERESTED IN IMPROVING WATER QUALITY IN YAKIMA BASIN.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NA
($2m)
8/19/24
Not listed
AWARD PURPOSE: IN 1998 SUNNYSIDE DIVISION BOARD OF CONTROL (SDBOC) COMPLETED A WATER CONSERVATION PLAN THAT INCLUDED LONG-TERM REHABILITATION OF CONVEYANCE FACILITIES. SDBOC HAS COMPLETED TWO PHASES OF CANAL AND LATERAL LINING (PHASE I AND PHASE IIB) REPLACING MANY OF THE ORIGINAL CHECK STRUCTURES AND HAS PURSUED AN AGGRESSIVE PROGRAM OF CONVERTING DITCHES TO PIPED LATERALS.THIS WATER CONSERVATION PLAN WAS REVIEWED AND ACCEPTED FOR FEASIBILITY INVESTIGATION BY RECLAMATION AND ECOLOGY. SDBOC COMPLETED THE FEASIBILITY INVESTIGATION IN MARCH OF 2007.THE ENCLOSED LATERAL IMPROVEMENT PROJECTS (ELIPS) IS THE RESULT OF A SETTLEMENT AGREEMENT BETWEEN THE BUREAU OF RECLAMATION (RECLAMATION), WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY), YAKAMA NATION TRIBES, AND SDBOC IN THE YAKIMA BASIN WATER RIGHTS ADJUDICATION.THE PURPOSE OF ELIPS IS TO CONVERT OPEN IRRIGATION DITCHES/PIPES AND WEIR BOXES TO ENCLOSED LATERALS AND INLINE FLOW METERS. GRAVITY PRESSURE IN MOST CASES WILL ALLOW LANDOWNERS TO ELIMINATE PUMPS OR REDUCE PUMP HORSEPOWER REQUIREMENTS. OTHER BENEFITS TO ENCLOSED LATERALS INCLUDE, IMPROVED ON FARM CONTROL OF IRRIGATION WATER, NO LATERAL/LANDOWNER END SPILLS, REDUCED SEEPAGE LOSSES, IMPROVED IRRIGATION DRAIN WATER QUALITY, IMPROVED PUBLIC SAFETY, REDUCED OPERATION AND MAINTENANCE COSTS, AND IN COMBINATION WITH OTHER CONSERVATION PROJECTS OVERALL IMPROVED OPERATIONAL EFFICIENCY.ACTIVITIES TO BE PERFORMED: THE TOTAL AREA COVERED UNDER ELIPS IS 46,000 ACRES INCLUDING 1,000 ACRES THAT WILL BE ENCLOSED TO MITIGATE FOR OPERATIONAL CHANGES REQUIRED TO MANAGE THE LOWER CANAL FLOWS. UNDER PHASE II OF THE ELIPS, SDBOC WILL REDUCE ITS ANNUAL DIVERSION BY 46CFS, 16,500 ACRE-FEET ANNUALLY.THE SDBOC WILL REPLACE CONCRETE WEIR BOXES AND 16.7 MILES OF 2 OPEN DITCH LATERALS DIVERTED FROM THE MAIN CANAL AT CANAL MILE POST 51.87 AND 51.18, WITH ENCLOSED CONDUIT PRESSURE PIPE (36" PIPE) AND FLOW METERS. THESE LATERALS IRRIGATE 2,929 ACRES AND ARE LOCATED IN THE RIVER DIVERSION CANAL SECTION ON THE SUNNYSIDE CANAL KNOWN AS PHASE IID.EXPECTED DELIVERABLES OR OUTCOMES: THE SDBOC PARTICIPATES IN THE BASIN CONSERVATION PROGRAM TO EQUIP ALL SURFACE WATER DELIVERY SYSTEMS WITHIN THEIR BOUNDARIES WITH VOLUMETRIC WATER METERS OR EQUALLY EFFECTIVE WATER MEASURING METHODS. THE SDBOC WILL REPLACE TWO OPEN LATERALS/PIPES AND CONCRETE WEIR BOXES WITH ENCLOSED PRESSURE PIPE AND FLOW METERS THAT WILL BENEFIT THE PUBLIC AND WATER USERS.THE BENEFITS INCLUDE:ELIMINATING DELIVERY SYSTEM WATER LOSSES.INCREASED WATER SAVINGS.INCREASING THE YAKIMA RIVER IN-STREAM FLOWS TO BENEFIT FISH AND WILDLIFE.IMPROVING PROJECT WIDE WATER MANAGEMENT.IMPROVING THE AVAILABILITY OF WATER SUPPLIES FOR IRRIGATION USERS.IMPROVING THE QUALITY OF WATER IN THE YAKIMA BASIN.THE PROJECT GOALS ARE TO:CONSERVE WATER THROUGH IMPROVED IRRIGATION DELIVERY AND WATER MONITORING SYSTEMS. PROVIDE CONSERVED WATER FOR THE PROTECTION AND AUGMENTATION OF FISH AND WILDLIFE RESOURCES, AND,IMPROVE THE QUALITY OF WATER IN THE YAKIMA RIVER BASIN.INTENDED BENEFICIARIES: ONLY DISTRICTS WITH AN APPROVED YRBWEP CONSERVATION PLAN AND FEASIBILITY STUDY ARE ELIGIBLE FOR YRBWEP IMPLEMENTATION FUNDING. THIS WILL INCLUDE THE IRRIGATION DISTRICT'S WATER CONSERVATION PLANNING FOR IRRIGATORS/ FARMS INTERESTED IN IMPROVING WATER QUALITY IN YAKIMA BASIN.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NA
$0
3/21/22
Not listed
ELIPS PHASE IID
$888.5k
9/1/21
Not listed
ELIPS PHASE IID
$1.3m
5/6/20