Amendment #1 12/9/2025THIS administrative amendment is to add the period of performance (POP) field and to extend the POP end date to 6/30/2026 per the recipients request
Active Formula Grant Awarded
- Award ID
- PR90X269
- Recipient
-
Autoridad Metropolitana De Autobuses UEI VFM1ZUECKT15
- Awarding agency
-
Federal Transit Administration
Department of Transportation
- Obligated
- $0
Award facts
- Assistance listing
- 20.507 Federal Transit Formula Grants
- Completion date 73% complete
- Place of performance
- Puerto Rico
Award details come from USAspending.gov.
Description
The recipient provided the justification for this POP extension in the attached email. This amendment does not change the amount of federal funds awarded in the original grant or change the scope of the project contained in the grant._________________________________________________________________________________________________________________________________________________________________________________________the federal funding approved for fiscal year 2009 as stated in the statewide transportation improvement program (fiscal years 2010-2013 stip) page 17-19 items #76777879808182838485 and 86 assigns a portion to the metropolitan bus authority of puerto rico (MBA) in the amount of $21774193 that shall be used for the financing of public interest projects that will help support and improve the public transportations system. This grant will cover the following tasks:a)the use of these funds are programmed for minor repairs for (3) three transfer stations and six (6) bus terminals. Some of repairs are described as follows: roof water filtration replacement of air conditioning units and a minor repair of the concrete slab in two (2) bus terminal. The useful life of this projects is (5) five years except for the roof and concrete flooring may have a warranty of (5) years to (10) ten years. The cost for this project is $399833.00B)the funds under the bus support equipment and facilities scope will be used for:the renovation of an existing paint spray booth that IT is used for the body repair and maintenance of both rolling stock and support vehicles. (we advise that modern paints are not asbestos or lead based. Excess or surplus oil based paints are disposed using 3RD party contractor whenever necessary) C)MBA is planning on using an outside source that will be procured to provide midlife overhaul to 57 fixed route vehicles of the fleet 2004-2005. The cost of this project is $10000000.00. The useful life for the engines and transmissions will be five (5) years. (the overhaul is included in the force account plan.) D) purchase of shop equipment that had become inoperable or met their useful life: DIE and tool machine milling machine tire changer lathe etc. The useful life of these items is (5) five years. A list of this item is attached for record with the funding for miscellaneous support equipment for the shop area like: valves for the bus lifts pumps reservoirs exhaust fans among others. Approximate cost. $350000 E)acquisition of hardware and software components to support the communications center and the fare collection systems in order to provide more efficient tools for evaluating service trends and performance. This project will include the acquisition of GPS for the rolling stock (plan attached for record) the useful life of this hardware is (5) five years. D) funds for surveillance security equipment: cameras access control will be conducted under this scope. The useful life of this hardware is (5) five years. F) purchase of support vehicles: 4 support vehicles 5 years of useful life estimated cost $165000. One digger (1) fork lift. The useful life of this item is (5) five years or 80000 millage. G)signal and communication equipment funds are programmed for the improvement of the systems of the communications center as described in the extended budget description. The useful life for this items is (5) five years the cost is estimated $2800000H)preventive maintenance- funds for the acquisition of spare parts; B) preventive maintenance program for fixed route and paratransit services both directly operated. The cost for this project is $13417943.00. A force account plan is attached for record in team web. I)the project administration will be used for administrative services and to support the project for improving the public transportation. Employee education training cost of $350000.J)6) purchase signage funds will be use for the acquisition of signage for the compliance of restructuring routes projects to be implemented around july 2010. Approximately the acquisition of 500 sings with a useful life of (8) eight years the cost of $260000.
Quick answers
Who received award PR90X269?
PR90X269 was awarded to Autoridad Metropolitana De Autobuses by Federal Transit Administration (Department of Transportation) on December 11, 2025.
How much is award PR90X269 worth?
$0 has been obligated on PR90X269.