Amendment 01 ***MAINEDOT is requesting an amendment to add $800000 awarded to acadia national park D2012-atpl-011 to this grant me 20-X004

Ended Formula Grant Awarded

Award ID
ME20X004
Recipient
Awarding agency
Obligated
$0

Award facts

Assistance listing
20.520 Paul S. Sarbanes Transit in the Parks
Completion date
Place of performance
Maine, USA

Award details come from USAspending.gov.

Description

These additional funds will contribute to the construction of the acadia gateway center. Additional funds will be required to fully fund the construction that is estimated to be $12.5M according to the final design that was accomplished in 2012. Including the available funds in grant me 20-X004-00 and me 20-X004-01 $9007510 in additional funds will be needed to construct the project. Design and construction will follow ADA standards. In the original grant me 20-X004 the project cost was estimated at $5.4M. This estimate increased as the project elements were RE-evaluated in the final design process. At the conclusion of the final design in 2012 the cost estimate to construct the AGC was $12.5M. Phases II III have been combined into one building hereafter referred to as the acadia gateway center.MAINEDOT plans to fund the remainder of this project through a mix of 5339 and 5311 formula funding state funds and bonds and future discretionary grant applications in order to open for revenue service by the end of 2017. In the event that budget priorities change the existing $3800000 of trip funds could be repurposed to create a scaled-back project which would still have utility for transit riders.*** original grant ***this project will complete final design partially fund construction for the acadia gateway center (AGC) phase II/intermodal facility acadia national park welcome center. AGC phase II consists of a 2-story 18000 SQ FT combined intermodal facility acadia national park (ANP) welcome center that offers visitors ANP information park passes and transit connections on the island explorer bus service to the park and surrounding communities. The AGC will also include a 350-space park and ride lot. The goals of this project are to design construct a facility that will provide the following elements to visitors and residents stopping at the gateway center:reduce the number of cars traveling from route 3 to mount desert island and acadia npprovide public parking and island explorer (IE) bus boardingprovide island explorer information (routes time tables) provide park information with focus on access to the park by busprovide tourist information (lodging food service etc.) with the focus on access to businesses by bussell park entry passes (proceeds provide operating assistance to the IE)provide support services ( restrooms drinking water etc)other regional information with focus on access by busin 2006 the environmental assessment (EA) for the full build-out of the acadia gateway center (phase I II and III) was completed. In 2011 the AGC maintenance facility was built and phase I completed. The 2006 EA projected phase II design and construction costs at approximately $14.2M and estimated size of 36000 SQ. FT. For all elements of the intermodal facility/welcome center. For this project a portion ($925000.00) of this grant me 20-X004 and ($875000) of 2012 TCSP grant will fund the final design and construction engineering of phase II. The remaining funds ($2075000) will be combined with federal state and local resources to construct the facility as soon as possible and complete phase II. The goal for the design portion of this project is for the development of a clear understanding of the project needs through review of base data and a functional analysis. Project consultant aecom will identify objectives on which design alternatives and functional areas will be evaluated in order to choose the most optimum plan for current needs and funding constraints. Project information: this project is scoped as the design and development of an intermodal passenger transportation facility and national park service welcome center. The AGC is being designed to reduce traffic congestion and the demand for visitor parking at acadia national park (ANP) surrounding communities; and to protect the national park environment. The proposed AGC would provide parking for day use visitors to acadia national park a park ride for residents that commute to work on mount desert island an island explorer and intercity bus boarding area an information center providing ANP and regional traveler information and limited office space. The acadia gateway center (AGC) intermodal facility will serve the bar harbor region and acadia national park (ANP). The site is strategically located to intercept traffic on route 3 before IT gets to mount desert island (MDI) and the acadia national park. IT will maximize the benefits of the island explorer bus system by providing parking area information/orientation and a bus boarding area for visitors before they reach MDI. This project is consistent with goals and recommendations contained in the 2004 bangor to acadia corridor study which recommended development of an intermodal facility. The project has been developed with the input of a public advisory committee that met regularly from february 2006 to september 2007 to guide project development. The primary partners in the design and construction of the AGC and their respective roles in the project are documented in a 2005 memorandum of intent signed by the national park service northeast regional director. This project is consistent with the maine department of transportations long-range plan connecting maine listed in mainedots mid-range plan and listed and funded in maines biennial capital work plan and the federal statewide transportation improvement program.project schedule for phase II final design construction engineering: RFP released: 4/2/2012EXECUTED contract: 7/9/2012EST. Completion: 7/26/2013FINANCING plan: based on the value analysis work on a new design for phase II the new revised cost for a 2 story 18000 SQ FT building is $5.4M.with this grant me has secured $3M in sarbanes trip funds.design engineering = $925000 that leaves $2075000 for construction (FY 2012 transportation community and system preservation program (TCSP) grant for $700000 federal and $175000 local (total $875000)will fund a portion of the design and engineering.) total construction = $5.4M minus $2.075M = $3.325MREMAINING funds needed = $3325000FEDERAL = $2660000*state/local = $665000 (COMMITTED)*medot NPS will apply for discretionary funding to complete the project. Should discretionary funding not be available medot will apply section 5311 nonurbanized area formula funding to complete the projectstip: this project is approved in stip 10/1/2007.DOL: there are no known transit unions affected by this project which is located in hancock county maine. After construction this facility will be leased to downeast transportation a sub-recipient of the maine department of transportation (MAINEDOT).environmental assessment: the federal transit administration (FTA) issued a joint fonsi with the department of the interior on december 21 2006. The national park service (NPS) and federal highway administration (FHWA) are cooperating agencies.intelligent transportation systems: maine DOT has a statewide its architecture as defined in the FTA national its architecture policy issued on april 8 2001. IT was approved on july 12 2005 by the FHWA. No its components are included in this grant.local share: for this grant me 20-X004 the funds are 100% federal (final design and construction engineering). For the construction phase the required local share will come from state/local funds. Useful life: final design construction engineering for phase II the intermodal facility/information center according to james hodson allied engineerings construction administrator; useful life is estimated to be 50 years. General maintenance will be required as follows: roof replacement - 25 years siding - 20 years mechanical systems (reference the ashrae pocket guide for air conditioning heating ventilation and refrigeration) 25 years interior finishes between 5 and 10 years. Parking lots - 15 to 20 years before any overlay should be needed. May need crack sealing on an as-needed basis. AGC background information: acadia gateway center phase I - maintenance facility: construction RFP issued: 5/5/2008CONTRACT award: 7/1/2008CONSTRUCTION completed: 12/28/2011GRAND opening: 5/4/2012PREVIOUS grants providing funding to the acadia gateway project phase I - maintenance facility: phase 1 = $14731747$11399404 federal transit administration $ 3332343 state bondfunding breakdown:bus earmark me-03-0042 - approved 9/15/05 - $242945BUS earmark me-04-0001 - approved 5/26/06 - $680130BUS earmark me-04-0001-01 - approved 8/23/07 - $714000BUS earmark me-04-0001-02 - approved 9/10/08 - $776000BUS earmark me-04-0001-03 - approved 8/17/10 - $823000HPP funds me-55-0001 - approved 11/18/10 - $4005900ATPL funds me-20-X003 - approved 1/24/11 - $1000000RURAL - me-18-X042 -approved 9/4/2008 - $106801(real estate acquisition)rural - me-18X043 $379819RURAL/intercity - me-18-X044 - approved 1/21/11 - $883110RURAL - me-18-046 approved 3/22/11 - 1525104RURAL me-18-X048 $1370555 pending(funds will be applied in this grant for the final design and construction engineering for phase II:trip me-20-X004 $3000000 (application for trip funds attached) and FY 2012 TCSP for $700000 federal and $175000 local.)island explorer shuttle service: this facility is being designed primarily for the inter-connectivity with the island explorer bus system run by downeast transportation. Downeast transportation (DTI) is a private non profit agency that operates regularly scheduled deviated fixed route public bus service in hancock county. Areas served include ellsworth all of mount desert island the blue hill peninsula including brooklin sedgwick deer isle and stonington the northern hancock county town of otis the coastal towns of hancock sullivan gouldsboro and winter harbor in eastern hancock county and the town of bucksport in western hancock county. Since its inception the island explorer bus system has done much to ease seasonal congestion on mount desert island. IT has transported millions of passengers and prevented significant amounts of pollution from being produced by automobiles due to vehicle trips avoided on MDI-area roads. By providing a conveniently located bus terminal and loading areas the acadia gateway center will enhance island explorer efficiencies and operations.

Quick answers

Who received award ME20X004?

ME20X004 was awarded to Maine Department Of Transportation by Federal Transit Administration (Department of Transportation) on November 7, 2023.

How much is award ME20X004 worth?

$0 has been obligated on ME20X004.