Greater hartford transit district FY 2015 capital fundingthis greater hartford transit district grant application requests $16360000 of section 5307 urbanized area formula funding for the construction…

Ended Formula Grant Awarded

Award ID
CT90X525
Recipient
Awarding agency
Obligated
$0

Award facts

Assistance listing
20.507 Federal Transit Formula Grants
Completion date
Place of performance
Connecticut, USA

Award details come from USAspending.gov.

Description

Greater hartford transit district FY 2015 capital fundingthis greater hartford transit district grant application requests $16360000 of section 5307 urbanized area formula funding for the construction of an ADA operations and maintenance facility the development of a master plan for hartfords union station and capital support equipment and services.1) master plan for union stationproject funds will be used to develop a master plan to identify short medium and long-term opportunities to improve union stations physical plant passenger flow passenger service and exterior environment (including parking). This study will identify alternatives to create better connections between rail and transit services such as RE-purposing current waiting areas. The scope of work will consist of: data collection and assessment; market demand for services in the complex; preparation of draft concepts; cost estimate and phasing; and development of final master plan and implementation strategies. 2) administrative capital support equipment this project includes on-going upgrades to the districts and its ADA operators hardware and software systems including acquisition of finance modules reporting documentation and manuals servers ancillary equipment and equipment to support paratransit operations.3) construction of paratransit operations and maintenance facilitygrant funds will be used to construct a new paratransit operations and maintenance facility at 148 roberts street in east hartford. After the district acquired the property in 2013 ctdot requested a needs analysis study to be conducted. This study concluded IT would be in the best interest of the district to construct a new facility instead of renovating the existing buildings at the site. Currently the districts ADA operations takes place at a leased location at 247-249 warwarme avenue in hartford. The facility does not allow for the proper storage of vehicles. Any expansion at the warwarme locations would have required the use of an adjacent vacant lot and disturbance of the soil. An environmental investigation conducted on the properties revealed potential concern about disturbing soil at this site.therefore the district with assistance from ctdot acquired a new site for ADA operations and maintenance that will meet the current and future needs of the ADA program. The district has worked in coordination with ctdot to design a facility that meets the original intent of the acquisition. The final design plans have been approved by ctdot for construction. The proposed structure is a two-story steel frame and concrete masonry unit shear wall assembly structure. The roof decks are steel decking and a composite concrete/steel structural floor slab is used in the second floor. The foundation system and first floor slab consist of a concrete structural slab with grade beams. The entire structural slab is supported on H piles driven to bedrock/refusal. First floor spaces are primarily workshop and vehicle maintenance spaces. Specialized vehicle maintenance equipment and HVAC systems are also located on this floor. The second floor will be primarily for office space and will be constructed with typical office finishes and furnishings.exterior envelope:the primary exterior envelope of the building consists of a concrete masonry unit back up wall vertical light gage metal firing and an insulated metal panel wall system [metal wall panels will be installed by certified contractors per the specified manufacturers standards]two roof systems are used on this project. The majority of the building will have an insulated metal panel standing seam roof panel system that is secured to the steel roof deck [metal roof panels are to be installed by certified contractors per the specified manufacturers standards]. The lower flat roof is a thermoplastic roof membrane system. Exterior openings consist of aluminum storefront and curtain wall glazing systems.overhead garage doors consist of rolling steel coil doors and sectional extruded aluminum and glass doors. Architectural accent features include extruded aluminum awnings extruded aluminum shading louvers exposed structural steel extruded aluminum/laminated glass canopies and finished wood/structural steel shading screens. Site workthe new facility will include: operations: a training room dispatch area reservations area scheduler area copier and storage room server room drivers break room lunch room restrooms (MALE/FEMALE) and 10 offices. Maintenance: at least 4 maintenance bays storage area parts room mechanics room wash BAY with water/oil separator parking for at least 125 vehicles employee parking for at least 150 vehicles and restrooms/ locker rooms (MALE/FEMALE). Relocation and installation of 10000 gallon diesel/gas fuel storage tank one section of paving will be porous pavement typical parking lot sidewalk and curb details decorative fencing and gates chain-link fencing and gates site light poles site and building bollards snow scraper system stormwater detention in ground wells and bermed detention basinthe expected useful life of the building is 40 years. The project includes a security component consisting of fencing surveillance equipment and building and facility access controls. Office equipment and furniture are also part of the project as is the IT component needed to operate the ADA system which includes relocation of servers and ancillary equipment as well as installation and set-up of computer systems. This project also includes construction inspection and material testing services to be provided by a consultant serving as the owners representative on site. This project is concurrent with grants CT-90-X509 CT-90-X511 and CT-90-X515 which include design services construction/renovation activities and grant management activities. Funds for the real property purchase came from grant CT-90-X511. The district expects this grant will complete project funding.facility acquisition and renovation budget:acquisition: $2000000 CT-90-X511PE/AE services: $50000 CT-90-X509AE services: $225000 CT-90-X515RENOVATIONS: $775000 CT-90-X515RENOVATIONS: $700000 CT-90-X511THE total cost of this project is $23750000. Design and construction will follow ADA standards. The FY 2015 hartford area split letter dated 7/23/15 is attached.ghtd is current with civil rights requirements milestone progress reports and financial status reports. All administrative and statutory requirements have been met.

Quick answers

Who received award CT90X525?

CT90X525 was awarded to Greater Hartford Transit District by Federal Transit Administration (Department of Transportation) on May 13, 2024.

How much is award CT90X525 worth?

$0 has been obligated on CT90X525.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award