The primary purpose of the project is to eliminate the existing 1.6 mile long single track bottleneck between CP DON (MP 216.5) and CP pulgas (MP 218.1)
Active Formula Grant Awarded
- Award ID
- CA2026073
- Recipient
-
San Diego Association Of Governments UEI CF3XG46HAWE8
- Awarding agency
-
Federal Transit Administration
Department of Transportation
- Obligated
- $3,500,000
Award facts
- Assistance listing
- 20.507 Federal Transit Formula Grants
- Completion date 12% complete
- Place of performance
- California, USA
Award details come from USAspending.gov.
About this award
The Federal Transit Administration awarded the San Diego Association of Governments (SANDAG) $3.5 million on June 29, 2026, under the Federal Transit Formula Grants program (CFDA 20.507) to eliminate a 1.6-mile single-track bottleneck on the Los Angeles-San Diego-San Luis Obispo rail corridor between Control Point Don and Control Point Pulgas in California.
SANDAG will construct a new bridge over Las Pulgas Road, add 1.3 miles of raised track bed embankment, bury overhead electric lines under the railroad right-of-way, and build new drainage structures. The second track will allow freight and passenger trains operated by BNSF, Metrolink (16 trains per day Monday–Friday, 10 on Saturday, 8 on Sunday), and Amtrak Pacific Surfliner (26 trains per day) to pass without stopping in the current single-track bottleneck, reducing travel time delays and increasing corridor capacity.
The award obligates $3.5 million with a performance period ending March 31, 2029. Work takes place in California. SANDAG indicated no intention to allocate funding to sub-recipients; the organization will execute the project directly.
Description
- Activities
- Construct a new bridge over LAS pulgas road add 1.3 miles of raised track bed embankment bury overhead electric lines under the railroad right-of-way and build new drainage structures.
- Expected outcomes
- Adding a second track from CP DON south to CP pulgas will allow for freight and passenger trains to make passes without stopping in the current single-track bottleneck.
- Intended beneficiaries
- Transit riders on metrolink and amtrak.metrolinkthe southern california regional rail authority (scrra) operates metrolink commuter services between oceanside and LOS angeles and between oceanside and riverside providing 16 trains per day monday through friday 10 trains per day on saturday and 8 trains per day on sunday.amtrakamtrak operates 26 pacific surfliner trains per day.
- Subrecipient activities
- Sandag does not intend to allocate funding to subrecipients.
Quick answers
Who received award CA2026073?
CA2026073 was awarded to San Diego Association Of Governments by Federal Transit Administration (Department of Transportation) on June 29, 2026.
How much is award CA2026073 worth?
$3,500,000 has been obligated on CA2026073.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award