- The Federal Highway Administration awarded the Connecticut Department of Transportation $2,156,333.10 under the Surface Transportation Block Grant Program (CFDA 20.287) on August 26, 2026, to construct a sidewalk on the north side of Connecticut Route 127 (White Plains Road) in Trumbull, providing pedestrian connection from the commuter lot opposite Shawnee Road to the Pequonnock River Trail at Twin Brooks Park, spanning approximately 2,600 linear feet. Performance runs through October 15, 2031,...
- <p>The Federal Highway Administration awarded the Connecticut Department of Transportation $181,000 on April 13, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to install concrete sidewalks at various locations on Route 7 and Route 33 in Wilton, Connecticut. The project scope includes crosswalk illumination, pedestrian signal heads and pushbuttons at multiple intersections, and incidental related work. Performance is scheduled through November 15, 2030.</p>
- The Federal Highway Administration awarded the Connecticut Department of Transportation $564,000 through a Formula Grant on April 13, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to fund concrete sidewalk installation at various locations on Route 7 and Route 33 in Connecticut, including crosswalk illumination, pedestrian signal heads and pushbuttons at multiple intersections, and incidental work. Performance extends through November 15, 2030, with work occurring in...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $1,778,691.25 under the Surface Transportation Block Grant Program on July 8, 2026, to construct walkable sidewalk and pedestrian/bike improvements along Augur, Benham, Davis, and Treadwall Streets in Hamden, Connecticut. The project includes sidewalk installation, crosswalks, accessible curb ramps, signage, and roadway restriping at various locations throughout the town. Performance runs through November 30,...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $680,753.75 on July 8, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to construct walkable sidewalk and pedestrian/bike improvements at various locations in Hamden, Connecticut. The project includes sidewalk construction, crosswalks, accessible curb ramps, signage, and roadway restriping along Augur, Benham, Davis, and Treadwall Streets. Performance occurs in Connecticut with a...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded Connecticut Department of Transportation (CTDOT) $125,000 on July 29, 2025, under the Highway Planning and Construction program (CFDA 20.205) to construct a pedestrian sidewalk facility on the north side of Connecticut Route 127 (White Plains Road) in Trumbull, Connecticut. The project delivers approximately 2,600 linear feet of new sidewalk infrastructure that will establish a critical pedestrian connection from the...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $625,000 under the Surface Transportation Block Grant Program (CFDA 20.287) on April 13, 2026, to construct approximately 2.5 miles of the Putnam River Trail from Technology Park Drive in Putnam to Lake Road in Killingly. The project includes construction of a pedestrian bridge, retaining wall, rectangular rapid flashing beacon, crosswalks, and curb ramps. Work is performed in Connecticut with an ultimate...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $1,974,401 on January 29, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to mill and pave various bridges on Routes 3, 372, 94, and I-91 in District 1. Work is performed in Connecticut. The period of performance runs through November 30, 2031. The Surface Transportation Block Grant Program provides flexible funding for States and localities to preserve and improve conditions on...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $4.533 million on January 5, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to reconstruct a retaining wall supporting US Route 44 adjacent to the historic Cargill Falls Mill in Putnam, Connecticut, along with affected roadway and sidewalk replacement and an additional 700 feet of sidewalk repair due to poor condition. Work is performed in Connecticut with an ultimate completion date...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $6.6 million on July 16, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to conduct statewide inspection of bridges not located on the National Highway System by state forces. Work is performed statewide in Connecticut. The project period runs from September 1, 2026, through August 31, 2031, with an ultimate completion date of February 28, 2035. The award replaces prior award...
The Federal Highway Administration awarded the Department of Transportation Connecticut $274,721.90 on August 26, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to construct a sidewalk on the north side of Connecticut Route 127 (White Plains Road) in Trumbull, Connecticut. The project will provide a pedestrian connection from the commuter lot opposite Shawnee Road to the Pequonnock River Trail at Twin Brooks Park, spanning approximately 2,600 linear feet. The award is obligated at $274,721.90 with a period of performance through October 15, 2031, and performance takes place in Connecticut.
Generated 9/8/26, 5:21 AM
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $219.8k | 8/26/26 |