I-80 and aquatic park lagoon subsurface culvert rehabilitate five existing tide tubes that serve aquatic park's main lagoon and two interconnecting T
Active Formula Grant Awarded
- Award ID
- 693JJ22630000Y800CA5057057
- Recipient
-
Department Of Transportation California UEI UK66CLD4DX71
- Awarding agency
-
Federal Highway Administration
Department of Transportation
- Obligated
- $388,888
Award facts
- Assistance listing
- 20.284 Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving Transportation (PROTECT)
- Completion date 19% complete
- Funding
-
- $350,000.00 Federal
- $38,888.00 Non-federal
- Place of performance
- California, USA
Award details come from USAspending.gov.
About this award
The Federal Highway Administration awarded the California Department of Transportation $388,888 on March 16, 2026, under the Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving Transportation (PROTECT) program to rehabilitate subsurface culvert infrastructure serving Aquatic Park's lagoon system in San Francisco.
The work includes rehabilitation of five existing tide tubes that serve Aquatic Park's main lagoon and two interconnecting tubes between the main lagoon and Model Yacht Basin, plus one existing tide tube between the Model Yacht Basin and San Francisco Bay. Dredging will be performed at the tide tube openings at the main lagoon and Model Yacht Basin to provide unimpeded flow. The project will fortify shoreline outfall structures on the San Francisco Bay side to boost the culverts' resiliency to increased tidal impacts of climate change.
Work is performed in California and runs through June 30, 2029. Caltrans, operating as California's state transportation authority, receives the award as a formula grant recipient and implements the project on behalf of FHWA.
Description
- Project description
- I-80 and aquatic park lagoon subsurface culvert rehabilitate five existing tide tubes that serve aquatic park's main lagoon and two interconnecting tubes between the main lagoon and model yacht basin, and one existing tide tube between the model yacht basin and the BAY. Dredging at the tide tube openings at main lagoon and model yacht basin will be performed to provide unimpeded flow. Fortify the shoreline with appropriate outfall structures on the SAN francisco BAY side to boost the culverts' resiliency to the increased tidal impacts of climate change.
Quick answers
Who received award 693JJ22630000Y800CA5057057?
693JJ22630000Y800CA5057057 was awarded to Department Of Transportation California by Federal Highway Administration (Department of Transportation) on March 16, 2026.
How much is award 693JJ22630000Y800CA5057057 worth?
$388,888 has been obligated on 693JJ22630000Y800CA5057057: $350,000 in federal funding and $38,888 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award