Formula Grant 693JJ22630000Y301KSN081101
Award Date 8/27/26
Completion Date 3/21/30
Dollars Obligated $1.5M
Federal Agency
Federal Grant Program
Assistance Type
Formula Grant
Place of Performance
Kansas, USA
Similar Awards
- The Federal Highway Administration awarded the Kansas Department of Transportation $3.378 million on May 19, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to construct downtown streetscape improvements in Wakeeney, Kansas. The project scope includes constructing sidewalks and ramps, installing benches, trash receptacles, street lights, landscape planters, and handrails at accessible business entrances along Main Street from North Railroad Avenue to Warren Avenue and...
- The Federal Highway Administration awarded the Kansas Department of Transportation $2,373,108.41 under the Surface Transportation Block Grant Program (CFDA 20.287) on January 16, 2026, to construct sidewalks and stormwater system improvements and add acceleration and deceleration lanes along K-18 from 560 feet west of Delaware Avenue to 200 feet east of 17th Street and along 17th Street from K-18 to Rockhill Road/Yuma Street in Manhattan, Kansas. The work is scheduled for completion by August...
- The Federal Highway Administration awarded the Kansas Department of Transportation $2,789,969.20 under the Surface Transportation Block Grant Program (CFDA 20.287) on November 18, 2025, to construct multimodal pedestrian and bicycle infrastructure in Independence, Kansas. The project delivers 10-foot multi-use paths along Main Street (US-160/US-75) from Peter Pan Road to 21st Street and 8-foot paths along Laurel Street and Peter Pan Road. Laurel Street improvements extend from Main Street to...
- The Federal Highway Administration awarded the Kansas Department of Transportation $1,445,642.82 on January 16, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to replace a bridge over a stream located 2.0 miles south and 4.0 miles east of Hale in Chautauqua County, Kansas. The award is obligated in full at $1,445,642.82. Performance is scheduled through August 22, 2029, with work taking place in Kansas. The Surface Transportation Block Grant Program provides flexible...
- The Federal Highway Administration awarded the Kansas Department of Transportation $282,020 on March 25, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to reconstruct and widen an existing trail loop at Windsor Park in Prairie Village, Kansas. The work runs through October 24, 2029. The STBG program provides flexible funding to States and localities for projects preserving and improving conditions on Federal-aid highways, bridges, tunnels, and related transportation...
- The Federal Highway Administration awarded the Kansas Department of Transportation $963,369 on January 16, 2026, to construct a 10-foot side path and 14-foot pedestrian bridge at a ditch crossing on Magnolia Road in Salina, Kansas, between 9th Street and Ohio Street. The award is a formula grant under the Surface Transportation Block Grant Program (CFDA 20.287), which funds flexible multimodal transportation improvements on federal-aid highways and local roads. Performance runs through August...
- The Federal Highway Administration awarded the Kansas Department of Transportation $1,837,034 under the Surface Transportation Block Grant Program on May 19, 2026, to construct crushed limestone trails, 10-foot paths, sidewalks, and ancillary drainage improvements in Osawatomie, Kansas, with signage and pavement markings installation. The South Levee Loop project connects the Flint Hills Trail to the levee and street-grid system; the John Brown Loop connects the Flint Hills Trail to 12th and 9th...
- The Federal Highway Administration awarded the Kansas Department of Transportation $1,542,515.04 on July 29, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) for the Consolidated Statewide Trails Construction Project in fiscal year 2026. The award funds statewide trails construction across Kansas with a period of performance through September 30, 2031. The Surface Transportation Block Grant Program provides flexible funding for projects that preserve and improve...
- The Federal Highway Administration awarded the Kansas Department of Transportation $529,088 on April 20, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) for bridge replacement over Spring Creek located 2.8 miles east of Sharon in Barber County, Kansas. The project runs through November 21, 2029. KDOT serves as the primary recipient of FHWA formula allocations statewide, administering thousands of highway infrastructure, bridge replacement, transit planning, and traffic...
- The Federal Highway Administration awarded the Kansas Department of Transportation $626,363.13 on July 29, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) for a Consolidated Statewide Trails Construction Project in fiscal year 2026. Performance of performance spans Kansas through September 30, 2031. The STBG program provides flexible funding for States and localities to preserve and improve conditions and performance on Federal-aid highways, bridges, tunnels, and related...
The Federal Highway Administration awarded the Kansas Department of Transportation $1,492,876 in formula grant funding on August 27, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to replace sidewalk and install lighting along Metcalf Avenue in Overland Park, Kansas, between 87th Street and 83rd Street. The project is classified as a multimodal trail improvement and carries a performance period through March 21, 2030. Work is performed in Kansas.
Generated 9/8/26, 4:55 AM
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $1.2m | 8/27/26 |