Formula Grant 693JJ22630000Y301IDA026584
Award Date 8/31/26
Completion Date 9/30/27
Dollars Obligated $6.1K
Federal Agency
Federal Grant Program
Assistance Type
Formula Grant
Place of Performance
Idaho, USA
Similar Awards
- This federal Formula Grant award from the Federal Highway Administration (CFDA 20.205 Highway Planning and Construction) provides $164,625.00 to the Idaho Department of Transportation to install a pedestrian hybrid beacon controlled crossing of US 20/26 (Chinden Boulevard) at 43rd Street in Garden City, Idaho. The project, titled "LOCAL, CHINDEN; INT 43RD ST PED IMPRV, GARDEN CITY", will improve pedestrian safety and accessibility along this section of Chinden Boulevard. The award date...
- The Federal Highway Administration awarded the Idaho Department of Transportation $116,000 on March 17, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to replace sidewalk infrastructure and improve stormwater management along Aces Place in Riggins, Idaho. The project involves complete removal and replacement of the existing curb, gutter, and sidewalk from US-95 to School Drive, with re-grading to create an ADA-compliant walking surface. Stormwater improvements include...
- The Federal Highway Administration awarded the Idaho Department of Transportation $649,997.41 on August 21, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to design and construct a pathway and bicycle/pedestrian bridge in Garden City, Idaho. The project removes a half-mile greenbelt detour by connecting the greenbelt with existing pathways on Plantation Island approximately 230 feet upriver from the intersection of the greenbelt and 52nd Street, specifically between...
- This $561,900.31 Formula Grant awarded by the Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) will support the Idaho Department of Transportation (IDT) in planning and designing 12 multimodal transportation projects in the cities of Boise and Garden City. The projects will provide low-stress, multimodal connections between a community separated by major transportation infrastructure, including Interstate 184 and US 20/26. The funding will enable the filling of...
- The U.S. Department of Transportation awarded a $6,429,500 Project Grant under the National Infrastructure Investments (CFDA 20.933) program to the Idaho Department of Transportation. The grant will fund the planning and design of 12 multimodal transportation projects in Boise and Garden City, Idaho. The projects aim to provide low-stress, multimodal connections between a community separated by Interstate 184, US 20/26, the Bench, and the Boise River. Key elements include filling sidewalk...
- This is a $439,610 Formula Grant awarded by the Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) to the Idaho Department of Transportation. The grant will fund the installation of a pedestrian hybrid beacon controlled crossing of US 20/26 (Chinden Boulevard) at 43rd Street in Garden City, Idaho. This project is part of the Federal-aid Highway Program, which provides federal financial assistance to state transportation departments for a range of highway-related...
- <p>The Federal Highway Administration awarded the Idaho Department of Transportation $246,612.35 on August 11, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to install a pedestrian crossing on US 20/26 (Chinden Boulevard) and 32nd Street in Garden City, Idaho. Work includes a pedestrian hybrid beacon, Americans with Disabilities Act ramps, and possibly a pedestrian refuge island. Performance occurs in Idaho with an ultimate completion date of August 1, 2029.</p>
- The Federal Highway Administration awarded the Idaho Department of Transportation $226,988.48 under the Surface Transportation Block Grant Program (CFDA 20.287) on February 11, 2026, to reconstruct the frontage area along Garrity Boulevard from Stamm Lane to 39th Street in Nampa, Idaho. The project removes existing sidewalk and landscaping along the southeastern side of Garrity Boulevard and reconstructs the frontage to include a landscape buffer adjacent to curb and gutter, a detached 8–10-foot...
- The Federal Highway Administration awarded the Idaho Department of Transportation $116,000 under the Surface Transportation Block Grant Program (CFDA 20.287) on August 4, 2026, to design and construct approximately 500 feet of 10-foot-wide sidewalks, curb, and gutter on the east side of Main Street (Highway 55) in Cascade from Spring Street to Lake Cascade Parkway, and approximately 1,640 feet of 8-foot sidewalks on both sides of Main Street from Payette Street to Mill Street. The project...
- This $3,646,890 Project Grant awarded by the Immediate Office of the Secretary of Transportation on March 19, 2024 under the National Infrastructure Investments (CFDA 20.933) program will fund engineering design and planning for improvements to the SH 55, Deinhard/Boystun Corridor in McCall, Idaho. The project aims to reroute intrastate, freight, and heavy truck traffic around McCall's downtown core onto the Deinhard Lane/Boydstun Street alternate route, while also enhancing multimodal...
PROJECT TITLE: 43RD STREET, USTICK RD TO BOISE RIVER, GARDEN CITY :::: PROJECT DESCRIPTION: RIGHT-OF-WAY FUNDS ONLY FOR A PROJECT TO REHABILITATE 43RD STREET FROM USTICK ROAD TO THE BOISE RIVER IN THE CITY OF GARDEN CITY. WORK WILL INCLUDE CONSTRUCTING CURB, GUTTER, SIDEWALK, AND PEDESTRIAN RAMPS THAT ARE COMPLIANT WITH THE AMERICANS WITH DISABILITIES ACT, PROVIDING BICYCLE FACILITIES, AND INSTALLING AN ENHANCED PEDESTRIAN CROSSING AT USTICK ROAD AND 43RD STREET. (DESIGN IS UNDER KN 23833.) CONSTRUCTION IS NOT YET FUNDED.
Posted 8/31/26
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $5.7k | 8/31/26 |