Formula Grant 693JJ22630000Y301CT0127008
- The Federal Highway Administration awarded the Department of Transportation Connecticut $274,721.90 on August 26, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to construct a sidewalk on the north side of Connecticut Route 127 (White Plains Road) in Trumbull, Connecticut. The project will provide a pedestrian connection from the commuter lot opposite Shawnee Road to the Pequonnock River Trail at Twin Brooks Park, spanning approximately 2,600 linear feet. The award is...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $625,000 under the Surface Transportation Block Grant Program (CFDA 20.287) on April 13, 2026, to construct approximately 2.5 miles of the Putnam River Trail from Technology Park Drive in Putnam to Lake Road in Killingly. The project includes construction of a pedestrian bridge, retaining wall, rectangular rapid flashing beacon, crosswalks, and curb ramps. Work is performed in Connecticut with an ultimate...
- The Federal Highway Administration awarded the Department of Transportation Connecticut $579,126.38 under the Surface Transportation Block Grant Program (CFDA 20.287) on July 28, 2026, for installation of a shared-use path from the vicinity of Route 44 in Hartford to Tobey Road in Bloomfield, Connecticut. The path will run mostly through an existing rail corridor parallel to the Griffin Line and will close a gap in the East Coast Greenway. Performance occurs in Connecticut, with an ultimate...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $4.533 million on January 5, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to reconstruct a retaining wall supporting US Route 44 adjacent to the historic Cargill Falls Mill in Putnam, Connecticut, along with affected roadway and sidewalk replacement and an additional 700 feet of sidewalk repair due to poor condition. Work is performed in Connecticut with an ultimate completion date...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $1.416 million on July 27, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) for replacement of traffic control signals to meet current standards at various locations in District 4, Connecticut. The award obligates $1.416 million and runs through February 21, 2031. Work is performed throughout Connecticut. The Surface Transportation Block Grant Program provides flexible funding to...
- <p>The Federal Highway Administration awarded the Connecticut Department of Transportation $181,000 on April 13, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to install concrete sidewalks at various locations on Route 7 and Route 33 in Wilton, Connecticut. The project scope includes crosswalk illumination, pedestrian signal heads and pushbuttons at multiple intersections, and incidental related work. Performance is scheduled through November 15, 2030.</p>
- The Federal Highway Administration awarded the Connecticut Department of Transportation $1,778,691.25 under the Surface Transportation Block Grant Program on July 8, 2026, to construct walkable sidewalk and pedestrian/bike improvements along Augur, Benham, Davis, and Treadwall Streets in Hamden, Connecticut. The project includes sidewalk installation, crosswalks, accessible curb ramps, signage, and roadway restriping at various locations throughout the town. Performance runs through November 30,...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $1,974,401 on January 29, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to mill and pave various bridges on Routes 3, 372, 94, and I-91 in District 1. Work is performed in Connecticut. The period of performance runs through November 30, 2031. The Surface Transportation Block Grant Program provides flexible funding for States and localities to preserve and improve conditions on...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $450,000 on March 13, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to fund bridge improvements for non-National Bridge Inventory culvert No. 07136 carrying Route 14 over an unnamed brook in Plainfield, Connecticut. The award supports preservation and improvement of the culvert structure. Performance extends through March 26, 2032, with work conducted in Connecticut. The Surface...
- The Federal Highway Administration awarded the Connecticut Department of Transportation $112,709.53 under the Surface Transportation Block Grant Program (CFDA 20.287) on March 13, 2026, to fund bridge improvements for non-NBI bridge (culvert) No. 07136 carrying Route 14 over an unnamed brook in Plainfield, Connecticut. The work is scheduled for completion by March 26, 2032. The STBG program provides flexible funding for States and localities to preserve and improve conditions and performance...
The Federal Highway Administration awarded the Connecticut Department of Transportation $2,156,333.10 under the Surface Transportation Block Grant Program (CFDA 20.287) on August 26, 2026, to construct a sidewalk on the north side of Connecticut Route 127 (White Plains Road) in Trumbull, providing pedestrian connection from the commuter lot opposite Shawnee Road to the Pequonnock River Trail at Twin Brooks Park, spanning approximately 2,600 linear feet. Performance runs through October 15, 2031, with work performed in Connecticut. The Surface Transportation Block Grant Program provides flexible funding for states and localities to preserve and improve conditions and performance on federal-aid highways, bridges, and tunnels. This award supports pedestrian infrastructure development as an eligible project category under the program's broad scope.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $1.7m | 8/26/26 |