Formula Grant 693JJ22630000Y240UTF020334
Award Date 8/12/26
Completion Date 3/13/31
Dollars Obligated $250K
Federal Agency
Federal Grant Program
Assistance Type
Formula Grant
Place of Performance
Utah, USA
Similar Awards
- The Federal Highway Administration awarded the Utah Department of Transportation $428,921.00 in formula grant funding on November 21, 2025, for pavement preservation work on State Route 127 from milepost 0.00 to milepost 1.25 under the Surface Transportation Block Grant Program (CFDA 20.287). The project, designated as the 2027 High Volume Pavement Program, is classified as preservation-level work on a high-volume corridor. Performance and place of performance occur in Utah, with work to be...
- The Federal Highway Administration awarded the Utah Department of Transportation $4,861,615.08 on November 20, 2025, under the Surface Transportation Block Grant Program (CFDA 20.287) to fund pavement preservation on State Route 198 from Spanish Fork Main to US-6, mileposts 12.37 to 15.75, in Utah. The award obligates $4,861,615.08 with a period of performance extending through March 31, 2031. The project is classified as High Volume Pavement Program work and represents formula grant funding for...
- The Federal Highway Administration awarded the Utah Department of Transportation $270,308.85 on January 26, 2026, for pavement preservation work on State Route 73 from milepost 0.00 to 15.80, between SR-36 and the Utah County line, under the Surface Transportation Block Grant Program (CFDA 20.287). The award, a formula grant, funds low-volume pavement preservation activities in Utah. The period of performance runs through May 31, 2030. Work is performed in Utah statewide, with administrative...
- The Federal Highway Administration awarded the Utah Department of Transportation $560,003.55 on November 21, 2025, under the Surface Transportation Block Grant Program (CFDA 20.287) for pavement preservation on State Route 77 between Spanish Fork Main Street and US-89 in Springville, Utah, from milepost 6.60 to milepost 9.10. The work is classified as high-volume pavement preservation. Performance extends through June 18, 2029, with work performed statewide in Utah under administrative oversight...
- The Federal Highway Administration awarded the Utah Department of Transportation $94,630 on December 1, 2025, as a formula grant for the 2027 High Volume Pavement Program. The award funds pavement rehabilitation on I-15 between mile posts 298.25 and 300.60 (spanning 7200 South to 5300 South), a collector segment from I-215 to I-15 North (mile post 0.00 to 1.20), SR-173 (mile post 9.14 to 9.32), and SR-48 (mile post 3.77 to 4.00) in Utah. The period of performance extends from the award date...
- The Federal Highway Administration awarded the Utah Department of Transportation $3,332,367.96 on February 5, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) for pavement preservation on State Route 37 between State Route 108 and State Route 97, mileposts 2.00 to 6.69, in Utah. The award funds high-volume pavement program work as part of the 2027 construction cycle. Performance extends through March 3, 2031, with work performed statewide under administrative oversight...
- The Federal Highway Administration awarded the Utah Department of Transportation $7,377,272.24 on November 20, 2025, for pavement preservation on US-40 from milepost 51.80 to 58.22 in Utah under the Highway Planning and Construction program (CFDA 20.205). The project is classified as a high-volume pavement program preservation activity with a period of performance extending through January 22, 2031. Work is performed statewide with administrative oversight from the Utah Department of...
- The Federal Highway Administration awarded the Utah Department of Transportation $1.3 million on February 11, 2026, for the 2027 High Volume Pavement Program preservation project on I-215 from I-80 to 3300 South in Salt Lake City, Utah. The award funds pavement preservation and maintenance work on the specified interstate corridor segments, with performance occurring statewide and administrative oversight from Utah Department of Transportation headquarters in Taylorsville, Utah. The period of...
- <p>The Federal Highway Administration awarded the Utah Department of Transportation $3,763,947.36 on November 21, 2025, as a formula grant for pavement preservation on US-91 between Mantua and Sardine Summit in Utah, with work spanning milepost 5.85 to 10.11.</p> <p>The award funds the 2027 High Volume Pavement Program, a preservation initiative targeting high-volume corridors. Performance runs through January 29, 2031, with all work conducted in Utah.</p>
- <p>The Federal Highway Administration awarded the Utah Department of Transportation $321,000 on January 7, 2026, as a formula grant for the 2027 High Volume Pavement Program, a preservation project on US-6 (milepost 87.45–89.42) and US-50 (milepost 89.42–113.20) in Delta, Utah. Performance runs through March 1, 2029. The award funds pavement preservation work on these high-volume corridors in Utah.</p>
The Federal Highway Administration awarded the Utah Department of Transportation $250,000 on August 12, 2026, for the 2027 High Volume Pavement Program preservation project on State Route 71 between Interstate 15 and 700 East (milepost 5.03 to 5.91) in Utah. This award is a formula grant under the Surface Transportation Block Grant Program (CFDA 20.287), which provides flexible funding for pavement preservation and highway improvements. Work is performed statewide with administrative oversight from the Utah Department of Transportation's headquarters in Taylorsville, Utah. The performance period extends through March 13, 2031.
Generated 9/8/26, 5:01 AM
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $233.1k | 8/12/26 |