Formula Grant 693JJ22630000Y240UTF020220
Award Date 8/20/26
Completion Date 6/18/30
Dollars Obligated $30K
Federal Agency
Federal Grant Program
Assistance Type
Formula Grant
Place of Performance
Utah, USA
Similar Awards
- The Federal Highway Administration awarded the Utah Department of Transportation $1.3 million on February 11, 2026, for the 2027 High Volume Pavement Program preservation project on I-215 from I-80 to 3300 South in Salt Lake City, Utah. The award funds pavement preservation and maintenance work on the specified interstate corridor segments, with performance occurring statewide and administrative oversight from Utah Department of Transportation headquarters in Taylorsville, Utah. The period of...
- The Federal Highway Administration awarded the Utah Department of Transportation $2,226,253.07 on January 29, 2026, for the 2027 High Volume Pavement Program, a pavement preservation project on Interstate 70 from milepost 147 to milepost 154 in Utah under the Highway Planning and Construction program (CFDA 20.205). The project encompasses pavement preservation work on I-70 between mileposts 147.15 and 154.90 and mileposts 147.14 and 154.45. Work is performed in Utah with administrative oversight...
- The Federal Highway Administration awarded the Utah Department of Transportation $94,630 on December 1, 2025, as a formula grant for the 2027 High Volume Pavement Program. The award funds pavement rehabilitation on I-15 between mile posts 298.25 and 300.60 (spanning 7200 South to 5300 South), a collector segment from I-215 to I-15 North (mile post 0.00 to 1.20), SR-173 (mile post 9.14 to 9.32), and SR-48 (mile post 3.77 to 4.00) in Utah. The period of performance extends from the award date...
- The Federal Highway Administration awarded the Utah Department of Transportation $428,921.00 in formula grant funding on November 21, 2025, for pavement preservation work on State Route 127 from milepost 0.00 to milepost 1.25 under the Surface Transportation Block Grant Program (CFDA 20.287). The project, designated as the 2027 High Volume Pavement Program, is classified as preservation-level work on a high-volume corridor. Performance and place of performance occur in Utah, with work to be...
- The Federal Highway Administration awarded the Utah Department of Transportation $250,000 on August 12, 2026, for the 2027 High Volume Pavement Program preservation project on State Route 71 between Interstate 15 and 700 East (milepost 5.03 to 5.91) in Utah. This award is a formula grant under the Surface Transportation Block Grant Program (CFDA 20.287), which provides flexible funding for pavement preservation and highway improvements. Work is performed statewide with administrative oversight...
- The Federal Highway Administration awarded the Pennsylvania Department of Transportation $7 million on January 23, 2026, to realign, reconstruct, and rehabilitate State Route 228, Section 204, in Butler County, Pennsylvania, including upgrades to pavement structure, vertical and horizontal alignments, drainage, guiderail, and miscellaneous construction work. The work occurs along SR 228 from approximately 0.47 mile northeast of Brewer Road to approximately 300 feet north of Sarver Road, spanning...
- The Federal Highway Administration awarded the Utah Department of Transportation $2,344,571.67 on November 21, 2025, for pavement preservation work on US-89 between SR-235 and SR-204 (milepost 416.34–417.23) under the High Volume Pavement Program, a Formula Grant assistance type. Work is performed in Utah with a completion date of April 2, 2030. The award funds preservation-level pavement maintenance on a high-volume corridor segment as part of FHWA's formula-grant distribution to state...
- The Federal Highway Administration awarded the Utah Department of Transportation $250,000 on January 5, 2026, under a formula grant for the 2027 High Volume Pavement Program. The award funds pavement rehabilitation on Interstate 70 between Gooseberry and Spring Canyon (milepost 63.53 to 73.68 and milepost 63.45 to 73.44) in Utah. Performance runs through June 11, 2029, with work performed in Utah under the administrative oversight of the Utah Department of Transportation's Taylorsville...
- <p>The Federal Highway Administration awarded the Utah Department of Transportation $3,763,947.36 on November 21, 2025, as a formula grant for pavement preservation on US-91 between Mantua and Sardine Summit in Utah, with work spanning milepost 5.85 to 10.11.</p> <p>The award funds the 2027 High Volume Pavement Program, a preservation initiative targeting high-volume corridors. Performance runs through January 29, 2031, with all work conducted in Utah.</p>
- The Federal Highway Administration awarded the Utah Department of Transportation $560,003.55 on November 21, 2025, under the Surface Transportation Block Grant Program (CFDA 20.287) for pavement preservation on State Route 77 between Spanish Fork Main Street and US-89 in Springville, Utah, from milepost 6.60 to milepost 9.10. The work is classified as high-volume pavement preservation. Performance extends through June 18, 2029, with work performed statewide in Utah under administrative oversight...
PROJECT TITLE: 2027 HIGH VOLUME PAVEMENT PROGRAM; SR-228; I-15 S LEEDS TO I-15 N LEEDS; PRESERVATION HIGH VOLUME :::: PROJECT DESCRIPTION: SR-228; MP 1.63 - 1.81 & SR-228; MP .00 - 1.63
Posted 8/20/26
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $28.0k | 8/20/26 |