Formula Grant 693JJ22630000Y240AR2027010
- The Federal Highway Administration awarded the Arkansas Department of Transportation $194,571.25 on August 12, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) for transportation planning activities. Work is performed in Arkansas and spans the period through December 31, 2027. The STBG program provides flexible funding to States and localities for projects that preserve and improve conditions and performance on Federal-aid highways, bridges, and tunnels. This award...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $756,931.82 on September 16, 2025, under the Surface Transportation Block Grant Program (STBG, CFDA 20.287) to fund a two-foot pavement overlay on a state highway corridor north of Hunter extending to the Monroe County line in Arkansas. The award obligates $756,931.82 with performance extending through December 31, 2028. STBG provides flexible funding to States and localities for projects preserving and...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $270 under the Surface Transportation Block Grant Program (STBG, CFDA 20.287) on September 24, 2025, for a two-foot mill-and-overlay operation on Highway 326 (South) in Johnson County, Arkansas. The project runs through January 31, 2028. STBG provides flexible funding for highway preservation, improvement, and bridge and tunnel projects on Federal-aid routes. The $270 obligation represents the state DOT's...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $9.096 million on January 23, 2026, under the Surface Transportation Block Grant Program (STBG, CFDA 20.287) to deliver a 2-foot overlay on the highway corridor between Marion County Line and Baxter County Line in Arkansas. The award obligates $9,096,182.32 and runs through March 31, 2029. Work is performed in Arkansas. The STBG program provides flexible funding to States and localities for projects that...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $202,036 in federal formula grant funding on August 6, 2026, to support priority review of ArDOT projects for federal fiscal year 2027 under the Surface Transportation Block Grant Program (CFDA 20.287). The award funds supportive services provided by the U.S. Fish and Wildlife Service in connection with ArDOT's project pipeline. Performance occurs in Arkansas and extends through December 31, 2028. The STBG...
- The Department of Transportation Federal Highway Administration awarded the Arkansas Department of Transportation $2.3 million in Surface Transportation Block Grant Program (STBG, CFDA 20.287) formula funding on January 23, 2026, to fund a level-up and two-foot overlay with two-foot shoulders on County Road 764 at Highway 412 South in Arkansas. The award obligates $2,300,294.89 with a period of performance through March 31, 2029. Work is performed in Arkansas. The STBG program provides...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $1,000,651.72 on September 24, 2025, under the Surface Transportation Block Grant Program (CFDA 20.287) for the Hickory Ridge Highway 17 selective sections project in Arkansas. The award funds level-up and ultrathin bonded wearing course (UTBWC) pavement work. The period of performance runs through December 31, 2028. The STBG program provides flexible funding for States and localities to preserve and improve...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $4.935 million under the Surface Transportation Block Grant Program (STBG, CFDA 20.287) on May 15, 2026, for Highway 7 mill-and-overlay improvements in Hot Springs, Arkansas. The project consists of a 2-foot mill-and-overlay operation on the highway corridor. Performance runs through September 30, 2028, with work occurring in Arkansas. The STBG program provides flexible funding to states and localities for...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $2,863,138.48 on December 19, 2025, under the Surface Transportation Block Grant Program (CFDA 20.287) to fund highway overlay and leveling work on Highway 9 West (S). Performance extends through March 31, 2029, with work performed in Arkansas. The STBG program provides flexible funding for States and localities to preserve and improve conditions and performance on Federal-aid highways, bridges, and tunnels....
- The Federal Highway Administration awarded the Arkansas Department of Transportation $4.16 million on January 16, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to fund a statewide restriping program. The award funds pavement striping work across Arkansas state highways, with performance extending through March 31, 2028. The STBG program provides flexible funding to States and localities for projects preserving and improving Federal-aid highways, bridges, and tunnels.
The Federal Highway Administration awarded the Arkansas Department of Transportation $158,438 on August 26, 2026, through a Surface Transportation Block Grant Program (STBG, CFDA 20.287) formula grant to support State Historic Preservation Office (SHPO) supportive services focused on archaeological review. Performance runs through September 30, 2028, with work conducted in Arkansas. The STBG program provides flexible funding to States and localities for projects preserving and improving conditions and performance on Federal-aid highways, bridges, and tunnels. This award represents one obligation from Arkansas DOT's broader federal transportation grant portfolio, which totals 12,897 awards obligated at $20.15 billion concentrated predominantly in highway and transit infrastructure development and maintenance.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $126.8k | 8/26/26 |