This project comprises a total of 4.5 miles along mid-city /fairfax /hollywood area in the city of LOS angeles. Rosewood AVE is the east/west corrido
Formula Grant Awarded
- Award ID
- 693JJ22530000Y400CA5006903
- Recipient
-
Department Of Transportation California UEI UK66CLD4DX71
- Awarding agency
-
Federal Highway Administration
Department of Transportation
- Obligated
- $1,154,442
Award facts
- Assistance listing
- 20.205 Highway Planning and Construction
- Completion date
- Not on record
- Funding
-
- $913,000.00 Federal
- $241,441.50 Non-federal
- Place of performance
- California, USA
Award details come from USAspending.gov.
About this award
The Federal Highway Administration (FHWA) awarded $1,154,441.50 to the California Department of Transportation (Caltrans) on July 3, 2025, under the Highway Planning and Construction program (CFDA 20.205). This formula grant funds a comprehensive multimodal transportation improvement project spanning 4.5 miles across the Mid-City, Fairfax, and Hollywood areas of Los Angeles. The project delivers traffic calming treatments and low-stress bicycle infrastructure connections, including protected bicycle lanes along Rosewood Avenue (east-west corridor from La Cienega Boulevard to La Brea Avenue), Alta Vista Boulevard, Formosa Avenue, and Orange Drive. Additional improvements include bicycle pathway connections that link these corridors to transit nodes, specifically connecting to the Metro Hollywood and Highland Red Line Station and the future La Brea Metro Purple Line Station.
This award supports sustainable transportation infrastructure consistent with the Highway Planning and Construction program's focus on multimodal network improvements and active transportation development. The project prioritizes pedestrian and bicycle facility enhancements that promote neighborhood connectivity while incorporating traffic calming measures designed to reduce vehicle speeds and improve safety. As a formula grant administered through California's state DOT, the funding reflects the Federal-aid Highway Program's emphasis on state-selected projects that meet planning, design, and environmental requirements aligned with regional transportation priorities.
Description
- Project description
- This project comprises a total of 4.5 miles along mid-city /fairfax /hollywood area in the city of LOS angeles. Rosewood AVE is the east/west corridor from LA cienega blvd to LA brea AVE., and north/south corridor is along alta vista blvd between third street and second street., formosa AVE, from second street to willoughby AVE and orange drive, from willoughby AVE to hollywood blvd. Additional treatment will provide bicycle connections from formosa AVE to orange DR. Along both willoughby AVE , across LA brea AVE promoting traffic calming treatments along 2 strategic neighborhood corridors that promote low stress bicycle connections from mid-city to hollywood. The NB/SB paths will connect to the metro hollywood and highland red line station to the future LA brea metro purple line station on EB/WB proposed bike path
Quick answers
Who received award 693JJ22530000Y400CA5006903?
693JJ22530000Y400CA5006903 was awarded to Department Of Transportation California by Federal Highway Administration (Department of Transportation) on July 3, 2025.
How much is award 693JJ22530000Y400CA5006903 worth?
$1,154,442 has been obligated on 693JJ22530000Y400CA5006903: $913,000 in federal funding and $241,442 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award