Village wide various locations - village of beverly hills

Formula Grant Awarded

Award ID
693JJ22530000Y301MI25A0853
Recipient
Awarding agency
Obligated
$3,264,345

Award facts

Assistance listing
20.205 Highway Planning and Construction
Completion date
Not on record
Funding
  • $1,643,000.00 Federal
  • $1,621,345.00 Non-federal
Place of performance
Michigan, USA

Award details come from USAspending.gov.

About this award

The Michigan Department of Transportation (MDOT) received a Formula Grant award of $3.26 million from the Federal Highway Administration (FHWA) under the Highway Planning and Construction program (CFDA 20.205) on July 25, 2025. The award funds sidewalk and pedestrian infrastructure improvements across multiple locations in the Village of Beverly Hills, Michigan, totaling approximately 3 miles of new and rehabilitated sidewalk facilities. Specific deliverables include construction of new 5-foot-wide concrete sidewalks (4-inch concrete over 4-inch Class II sand base) along the west side of Evergreen Road, the north side of 13 Mile Road, and the south side of 14 Mile Road, with targeted segments extending from Long Bow to Lahser and from Old Stage Road to Evergreen Road.

In addition to base sidewalk construction, the project encompasses Americans with Disabilities Act (ADA) compliance improvements, including ADA ramps at applicable intersections and driveways and modifications to existing sidewalk near Groves High School to meet Proposed Right of Way as a Gift (PROWAG) standards. The scope also includes boardwalks on 13 Mile Road where needed, landscape restoration at impacted locations to preserve community aesthetics, and a new midblock pedestrian crossing on Evergreen Road just south of Riverside Drive. As a formula grant distributed through FHWA's statutory allocation mechanisms, this award reflects MDOT's role as the state-administering entity for federal-aid highway programs and supports the state's transportation planning priorities for pedestrian safety and multimodal connectivity improvements.

Description

Project description
3 miles of sidewalk and sidewalk modifications along the west side of evergreen road, on the north side of 13 mile road, and on the south side of 14 mile road. The new sidewalk will be constructed of 4-inch concrete over 4-inch class II sand at 5-feet wide. Should easments not be obtained to replace the sidewalk near groves high school with five foot sidewalk, said sidewalk will be modified as necessary to bring the existing sidewalk up to prowag requirements. The project includes installation of ADA ramps at applicable intersections/driveways, boardwalks on 13 mile road as needed, and landscape restoration at impacted locations to maintain aesthetics. The project also includes a new midblock crossing of evergreen road just south of riverside drive. West side of evergreen road from 14 mile road to embassy, on the north side of 13 mile road from old stage road to evergreen road, and on the south side of 14 mile road from long BOW to lahser.

Quick answers

Who received award 693JJ22530000Y301MI25A0853?

693JJ22530000Y301MI25A0853 was awarded to Michigan Department Of Transportation by Federal Highway Administration (Department of Transportation) on July 25, 2025.

How much is award 693JJ22530000Y301MI25A0853 worth?

$3,264,345 has been obligated on 693JJ22530000Y301MI25A0853: $1,643,000 in federal funding and $1,621,345 in non-federal funding.