Nevi - electrify america location 04 - rochelle, IL

Formula Grant Awarded

Award ID
693JJ22530000Y130ILXA35170
Recipient
Awarding agency
Obligated
$1,461,661

Award facts

Assistance listing
20.205 Highway Planning and Construction
Completion date
Not on record
Funding
  • $686,980.88 Federal
  • $774,680.56 Non-federal
Place of performance
Illinois, USA

Award details come from USAspending.gov.

About this award

This $1,461,661.44 federal Formula Grant awarded on January 31, 2025 by the Federal Highway Administration (CFDA 20.205 Highway Planning and Construction program) provides funding to the Illinois Department of Transportation (IDOT) to plan, design, construct, operate, and maintain a publicly accessible direct current fast charging (DCFC) station for electric vehicles.

The project involves installing a NEVI-compliant, six-dispenser DCFC station with a total power capacity of at least 900 kilowatts at a Petro Travel Center site in Rochelle, Illinois, approximately 13 miles from a Justice40 community. This project will support the development of electric vehicle charging infrastructure along Interstate 39 to enable long-distance electric vehicle travel.

Description

Project description
Nevi - electrify america location 04 - rochelle, IL, idot function code G87. Petro travel center, 900 petro RD. Rochelle, IL. The project consists of the planning, design, construction, operation and maintenance of a publicly accessible direct current fast charging (DCFC) station located at the following site: 900 petro road, rochelle, IL. 61068. Installation of a nevi-compliant, six-dispenser DC fast charging station at petro travel center in rochelle, illinois. This project will include six 150 KW, buy america-compliant dispensers, power cabinets, construction, and utility interconnection for a site at exit 99 along I-39. The project is 13 miles from a JUSTICE40 community. The grantee shall install no less than 6 DCFC ports with dedicated combined charging system (CCS) connectors, as specified in the grantee’S application. The total charging station power capacity shall be no less than 900 kilowatts.

Quick answers

Who received award 693JJ22530000Y130ILXA35170?

693JJ22530000Y130ILXA35170 was awarded to Illinois Department Of Transportation by Federal Highway Administration (Department of Transportation) on January 31, 2025.

How much is award 693JJ22530000Y130ILXA35170 worth?

$1,461,661 has been obligated on 693JJ22530000Y130ILXA35170: $686,981 in federal funding and $774,681 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award