Nevi €" red E charging location 44

Formula Grant Awarded

Award ID
693JJ22530000Y130ILJHCN243
Recipient
Awarding agency
Obligated
$712,987

Award facts

Assistance listing
20.205 Highway Planning and Construction
Completion date
Not on record
Funding
  • $484,831.16 Federal
  • $228,155.84 Non-federal
Place of performance
Illinois, USA

Award details come from USAspending.gov.

About this award

The Federal Highway Administration (FHWA), under the Highway Planning and Construction federal grant program (CFDA 20.205), awarded the Illinois Department of Transportation (IDOT) a $712,987 Formula Grant on January 31, 2025. The grant funds the planning, design, construction, operation, and maintenance of a publicly accessible direct current fast charging (DCFC) electric vehicle (EV) charging station at 3800 S. Cicero Ave, Cicero, IL. The project will install 4 DCFC ports with a total charging capacity of 600 kilowatts to support the deployment of EV charging infrastructure along the interstate system, as part of the National Electric Vehicle Infrastructure (NEVI) program. Construction will not begin until the required National Environmental Policy Act (NEPA) review is satisfied.

Description

Project description
Nevi €" red E charging location 44, idot function code H19. Gas N wash, 3800 S cicero AVE. Cicero, IL. 4 charging ports at 150 KW per port. Authorization is for complete design build operation. Construction will not begin until nepa is satisfied. The project consists of the planning, design, construction, operation and maintenance of a publicly accessible direct current fast charging (DCFC) station located at the following site: 3800 S cicero AVE, cicero, 60804. The project is the installation of a nevi compliant EV charging station to fill the identified GAP. The project consists of the planning, design, construction, operation and maintenance of 4 publicly accessible direct current fast charging (DCFC) stations located at the following site: I-55, exit 286, gas N wash, 3800 S. Cicero AVE, cicero, IL 60804. The grantee shall install no less than 4 DCFC ports with dedicated combined charging system (CCS) connectors, as specified in the grantee’S application. The total charging station power capacity shall be no less than 600 kilowatts.

Quick answers

Who received award 693JJ22530000Y130ILJHCN243?

693JJ22530000Y130ILJHCN243 was awarded to Illinois Department Of Transportation by Federal Highway Administration (Department of Transportation) on January 31, 2025.

How much is award 693JJ22530000Y130ILJHCN243 worth?

$712,987 has been obligated on 693JJ22530000Y130ILJHCN243: $484,831 in federal funding and $228,156 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award