Nevi - electrify america location 05 - bollingbrook, IL

Formula Grant Awarded

Award ID
693JJ22530000Y130IL6HT1353
Recipient
Awarding agency
Obligated
$1,442,410

Award facts

Assistance listing
20.205 Highway Planning and Construction
Completion date
Not on record
Funding
  • $504,843.39 Federal
  • $937,566.30 Non-federal
Place of performance
Illinois, USA

Award details come from USAspending.gov.

About this award

This $1,442,409.69 Formula Grant award from the Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) will fund the planning, design, construction, operation, and maintenance of a publicly accessible direct current fast charging (DCFC) station in Bolingbrook, Illinois. The project will install six 150 kW DCFC ports with dedicated combined charging system (CCS) connectors, providing a total charging capacity of at least 900 kilowatts. The grant recipient is the Illinois Department of Transportation (IDOT), which will execute the project at the Petro Travel Center site along I-39, approximately 13 miles from a Justice40 community. The award was made on January 31, 2025 and will support the development of electric vehicle charging infrastructure as part of the National Electric Vehicle Infrastructure (NEVI) program.

Description

Project description
Nevi - electrify america location 05 - bollingbrook, IL. Idot function code G88. Authorization is for complete design build operation; construction will not begin until nepa is satisfied. The project consists of the planning, design, construction, operation and maintenance of a publicly accessible direct current fast charging (DCFC) station located at the following site: 111 lily cache lane, bolingbrook, IL 60440. Installation of a nevi-compliant, six 150 KW DC fast charging station at petro travel center in bollingbrook, IL. This project will include six 350 KW, buy america-compliant dispensers, power cabinets, construction, and utility interconnection for a site at exit 99 along I-39. The project is 13 miles from a JUSTICE40 community. The grantee shall install no less than 6 DCFC ports with dedicated combined charging system (CCS) connectors, as specified in the grantee’S application. The total charging station power capacity shall be no less than 900 kilowatts.

Quick answers

Who received award 693JJ22530000Y130IL6HT1353?

693JJ22530000Y130IL6HT1353 was awarded to Illinois Department Of Transportation by Federal Highway Administration (Department of Transportation) on January 31, 2025.

How much is award 693JJ22530000Y130IL6HT1353 worth?

$1,442,410 has been obligated on 693JJ22530000Y130IL6HT1353: $504,843 in federal funding and $937,566 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award