SR 435 over lackawanna county railroad authority

Formula Grant Awarded

Award ID
693JJ22530000Y114PAX042655
Recipient
Awarding agency
Obligated
$8,430,715

Award facts

Assistance listing
20.205 Highway Planning and Construction
Completion date
Not on record
Funding
  • $3,992,627.72 Federal
  • $4,438,087.00 Non-federal
Place of performance
Pennsylvania, USA

Award details come from USAspending.gov.

About this award

This $8,430,714.72 Formula Grant awarded by the Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) supports the replacement of four highway bridge structures along State Route 435 in Lackawanna County, Pennsylvania. The project includes replacing a reinforced concrete T-beam bridge with a two-span composite steel plate girder bridge, a reinforced concrete arch culvert with a single-span composite prestressed concrete bulb T-beam bridge, and upgrading existing culverts. Additional work involves full-depth pavement replacement, milling and resurfacing, drainage, guide rail, and other miscellaneous construction. The project also requires maintaining traffic through staged construction with a temporary roadway, bridge, and railroad track relocation. The Pennsylvania Department of Transportation is the grant recipient responsible for executing this infrastructure improvement initiative.

Description

Project description
For the construction of a certain section of state highway in lackawanna county, elmhurst township, commonwealth of pennsylvania, state route 0435, section 251 and 253. The project being situated as follows: from a point on SR 0435 (state route 435) at segment 0210 offset 2736 (station 526+72) to a point approximately 2,183 feet along SR 0435 at segment 0230 offset 0240 (station 550+55). This project is the replacement of four structures that include: 1) SR 0435 existing simple span reinforced concrete T-beam bridge with a two span composite steel plater girder bridge; 2) SR 0435 existing reinforced concrete arch culvert with a single span composite prestressed concrete bulb tee beam bridge; 3) front street existing twin corrugated metal pipes with a precast concrete box culvert; and 4) delaware lackawanna railroad existing reinforced concrete box culverts with single precast box culvert. The project also includes full depth pavement replacement, milling and resurfacing, drainage, guide rail, and other miscellaneous construction. Traffic control will be maintained under staged construction with a 4.05-mile car detour, 6.23-mile truck detour, and a temporary roadway and bridge including a temporary railroad track relocation. Mpms 8191 bridge key 20610 (urban major collector, 94 feet) SR 0435 over lackawanna county rail authority elmhurst township, lackawanna county bridge replacement mpms 109778 bridge key 20611 (urban major collector, 77 feet) SR 0435 over roaring brook elmhurst township, lackawanna county bridge replacement the other two structure replacements are necessary to ease disruption associated with the temporary bridge to be constructed during the project.

Quick answers

Who received award 693JJ22530000Y114PAX042655?

693JJ22530000Y114PAX042655 was awarded to Pennsylvania Department Of Transportation by Federal Highway Administration (Department of Transportation) on March 18, 2025.

How much is award 693JJ22530000Y114PAX042655 worth?

$8,430,715 has been obligated on 693JJ22530000Y114PAX042655: $3,992,628 in federal funding and $4,438,087 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award