Havre-urban NHS (CN & CE) national highway 1, hill county, restoration and resurface roadway at reference point 381.2 to 384.0
Active Formula Grant Awarded
- Award ID
- 693JJ22530000Y043MT0016145
- Recipient
-
Montana Department Of Transportation UEI X2ABD4NRFFW9
- Awarding agency
-
Federal Highway Administration
Department of Transportation
- Obligated
- $1,778,300
Award facts
- Assistance listing
- 20.205 Highway Planning and Construction
- Completion date 38% complete
- Funding
-
- $1,539,652.00 Federal
- $238,647.84 Non-federal
- Place of performance
- Montana, USA
Award details come from USAspending.gov.
About this award
The Federal Highway Administration (FHWA) awarded Montana Department of Transportation (MDT) a Highway Planning and Construction grant (CFDA 20.205) in the amount of $1,778,299.84, obligated on September 4, 2025, with an ultimate completion date of October 9, 2028. This formula grant funds a roadway restoration and resurfacing project on National Highway Route 1/US-2 (also referenced as National Highway 1) in Hill County within the Havre urban limits, specifically from reference point 381.2 to 384.0 in Montana.
The project deliverables include comprehensive pavement restoration and resurfacing work encompassing cleaning and resealing of existing joints and cracks along the full width and length of the project, surface grinding, half and full panel replacement where necessary, partial-depth and full-depth repairs to improve roadway performance, installation of inlaid striping with high-performance tape, replacement of epoxy coating on inlaid stamped concrete crosswalks with epoxy seal, and installation of new signage. These improvements will enhance the structural integrity and safety characteristics of the existing roadway infrastructure within the project corridor.
Description
- Project description
- Construction project for the restoration and resurfacing of existing roadway includes cleaning and resealing existing joint and cracks full width and length of the project, surface grinding full width and length of the project, half / full panel replacement, partial depth repair, full-depth repair as necessary to improve the performance of the roadway, inlaid striping with high performance tape, epoxy will be replaced, inlaid stamped concrete crosswalks will be overlaid with epoxy seal, and new signing. This project is located in hill county within havre urban limits on national highway route 1/US-2 from reference point 381.2 to 384.0.
Quick answers
Who received award 693JJ22530000Y043MT0016145?
693JJ22530000Y043MT0016145 was awarded to Montana Department Of Transportation by Federal Highway Administration (Department of Transportation) on September 4, 2025.
How much is award 693JJ22530000Y043MT0016145 worth?
$1,778,300 has been obligated on 693JJ22530000Y043MT0016145: $1,539,652 in federal funding and $238,648 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award