SR 390 over bridge creek

Formula Grant Awarded

Award ID
693JJ22230000Z908PAX044250
Recipient
Awarding agency
Obligated
$1,362,500

Award facts

Assistance listing
20.205 Highway Planning and Construction
Completion date
Not on record
Funding
  • $1,090,000.00 Federal
  • $272,500.00 Non-federal
Place of performance
Pennsylvania, USA

Award details come from USAspending.gov.

About this award

This $1,362,500 formula grant from the U.S. Department of Transportation Federal Highway Administration will fund the replacement of a bridge on State Route 390 over Bridge Creek in Greene Township, Pike County, Pennsylvania. The project involves replacing an existing single-span rolled steel I-beam bridge with an 80-foot long, single-span precast concrete spread box beam bridge supported by full-height reinforced concrete abutments. Work will include installing an 8-inch thick reinforced concrete deck with Type 10M barriers, reconstructing approximately 375 feet of approach roadway to the west and 200 feet to the east, and other miscellaneous construction activities. The Pennsylvania Department of Transportation will perform the bridge replacement work in stages using half-width construction and temporary traffic signals. This funding supports the Highway Planning and Construction program's purpose of assisting states in providing for construction, preservation, and improvement of highways and bridges.

Description

Project description
Bridge replacement on state route 390 over bridge creek in greene township, pike county. This project involves a bridge replacement over bridge creek to an existing single-span rolled steel I-beam bridge supported on concrete abutments. The proposed structure is an 80'-0' long, single-span prestressed concrete spread box beam bridge on full height reinforced concrete abutments. The structure will have a new 8" thick reinforced concrete deck and PA type 10M barriers. The proposed curb-to-curb deck width is 41'-0", including 11'-0" travel lanes and 8'-0" shoulders. Approach roadway full-depth reconstruction will be approximately 375' to the west and 200' to the east. The bridge replacement work will be staged using half-width construction and a single-lane, alternating pattern controlled by temporary traffic signals. Other work includes: excavation, asphalt paving, drainage, guiderail, temporary concrete barrier, landscaping, E & S control measures, pavement markings, signs, bridge removal, temporary excavation & support and other miscellaneous construction work.

Quick answers

Who received award 693JJ22230000Z908PAX044250?

693JJ22230000Z908PAX044250 was awarded to Pennsylvania Department Of Transportation by Federal Highway Administration (Department of Transportation) on December 14, 2021.

How much is award 693JJ22230000Z908PAX044250 worth?

$1,362,500 has been obligated on 693JJ22230000Z908PAX044250: $1,090,000 in federal funding and $272,500 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award