ST. Louis county, wildwood, babler bicycle trail RE-pave

Formula Grant Awarded

Award ID
693JJ22230000M94EMORT19011
Recipient
Awarding agency
Obligated
$295,115

Award facts

Assistance listing
20.219 Recreational Trails Program
Completion date
Not on record
Funding
  • $236,092.36 Federal
  • $59,023.00 Non-federal
Place of performance
Missouri, USA

Award details come from USAspending.gov.

About this award

The Missouri Department of Transportation was awarded $295,115.36 on September 6, 2022 from the Department of Transportation Federal Highway Administration under the Recreational Trails Program (CFDA 20.219). The funding will support resurfacing and rehabilitation of two sections of the paved Babler Bicycle Trail in St. Louis County and Wildwood totaling approximately 7,125 feet. Work will include a 2.5-inch asphalt overlay, widening the trail to 10 feet where feasible, replacing three culverts, and installing two low-water crossings with small drainage pipes. The Recreational Trails Program provides funds to states to develop and maintain recreational trails and trail-related facilities for both motorized and nonmotorized recreational uses.

Description

Project description
ST. Louis county, wildwood, resurface and rehabilitate 2 sections of the paved bicycle trail with a 2.5 average asphalt overlay. Section 1 is from GUY park road tunnel to the campground, station 0+10 through 41+00. Section 2 is from crystal springs CCC restroom to GUY park trail head, station 55+00 through 85+25. The total of both sections is approximately 7,125 feet long. Design trail width to a total of 10' where technically feasible. 3 culverts will be replaced at station 57+10 (single no headwall), 60+00 (single no headwall) & 83+45 (double with stone headwalls). The double culvert headwall will be concrete with stone facing; if feasible & suitable, recovered headwall stone for the facing will be used. 2 areas, station 29+25 & 34+25 shall receive a low water crossing comprised of a few small PVC pipes in the 8' range to allow for small rain events and snow melt to drain through the pipe with the trail being raised only a foot or so from existing profile.

Transactions

Action Federal Non-federal Date
Amendment $118,046 $29,512
Original award $118,046 $29,512

Quick answers

Who received award 693JJ22230000M94EMORT19011?

693JJ22230000M94EMORT19011 was awarded to Missouri Department Of Transportation by Federal Highway Administration (Department of Transportation) on September 6, 2022.

How much is award 693JJ22230000M94EMORT19011 worth?

$295,115 has been obligated on 693JJ22230000M94EMORT19011: $236,092 in federal funding and $59,023 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award