This federal Project Grant, awarded by the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106), provides $101,000.00 to construct a new 13,600 square foot box hangar for aircraft storage, maintenance, or service at Front Royal Airport in Virginia. The grant funds the design phase of this project, which aims to help the airport become more self-sustaining by generating revenue through the new hangar facility. The award was made on August 7, 2024, with an...
This $580,000 Formula Grant was awarded on September 12, 2024 by the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106). The grant funds Phase 1, which consists of the design for reconstructing the existing runway lighting on Runway 15/33 that has reached the end of its useful life, as well as rehabilitating 5,000 feet of the existing paved runway to maintain structural integrity and minimize foreign object debris. The intended beneficiary is Stafford...
The federal Formula Grant award, provided by the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106), will fund the reconstruction and rehabilitation of runways and runway lighting at airports associated with Arlington, Virginia. The $10,242,281.33 grant will support the final phase of this project, which includes constructing 750 feet of runway 15/33, 750 feet of runway 1/19, and 800 feet of additional runway. The grant will also fund the rehabilitation...
This Federal Aviation Administration (FAA) Airport Improvement Program (CFDA 20.106) Formula Grant award provides $419,521.11 in federal funding to the County of Fauquier, Virginia to rehabilitate and upgrade the existing taxiway and lighting at a local airport. The project involves rehabilitating 5,000 feet of the parallel Taxiway A to maintain the structural integrity of the pavement and minimize foreign object debris, as well as rehabilitating the existing taxiway lighting to extend its...
This federal Project Grant award from the U.S. Department of Transportation's Federal Aviation Administration (FAA) Airport Improvement Program (CFDA 20.106) provides $179,043.23 to the Luray-Page County Airport Authority in Luray, Virginia. The grant funding will be used to rehabilitate 3,126 feet of existing paved runway 04-22, 6,000 square yards of the existing north apron pavement, and 900 feet of existing multiple taxilane pavements. Additionally, the grant will fund the rehabilitation of...
This $438,000 formula grant from the Federal Aviation Administration's (FAA) Airport Improvement Program (CFDA 20.106) will fund the design phase of a project to rehabilitate 2,400 feet of the existing paved Taxiway B at Roanoke Regional Airport in Roanoke, Virginia. The grant is intended to maintain the structural integrity of the pavement and extend the useful life of the taxiway. This grant represents Phase 1 of the overall project, with the ultimate completion date set for August 12, 2028....
This Project Grant award, valued at $378,500.00, was provided by the U.S. Department of Transportation's Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106). The funding will support the County of Fauquier, Virginia in updating the existing airport layout plan with a master plan narrative for the Warrenton, Virginia airport. The project aims to enhance the airport's infrastructure, operations, and overall master planning, with a target completion date of...
This $555,000 Federal Aviation Administration (FAA) Airport Improvement Program (CFDA 20.106) grant award will fund the design phase of a project to rehabilitate 5,500 feet of the existing paved Runway 17/35 at Leesburg Airport in Leesburg, Virginia. The project aims to maintain the structural integrity of the runway and minimize foreign object debris, thereby extending its useful life. Awarded on August 29, 2024, the grant will provide federal funding for this critical airport infrastructure...
This $919,337.78 federal Formula Grant award from the Federal Aviation Administration's (FAA) Airport Improvement Program (CFDA 20.106) is intended to support the Commonwealth of Virginia Department of Aviation (VDOA) in updating an existing Virginia Airport System Plan. The grant, awarded in August 2024, will fund activities to reevaluate air transportation needs, update existing airport system studies, and provide federal funding for airports associated with the Richmond, Virginia area. This...
This $398,970 Formula Grant awarded by the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) will fund the reconstruction of an Engineered Material Arresting System (EMAS) for Runway 16/34 at the Roanoke Regional Airport in Roanoke, Virginia. The project, with an expected completion date of August 12, 2028, will restore the damaged EMAS infrastructure, which is a critical airport safety system. The grant supports the airport authority's ongoing efforts...