Formula Grant 30800380222024

Award Date 8/6/24
Completion Date 8/5/28
Dollars Obligated $376K
Federal Grant Program
20.106
Assistance Type
Formula Grant
Place of Performance
Leadville, CO 80461, USA
Similar Awards
This Project Grant award from the Federal Aviation Administration (FAA), under the Airport Improvement Program (CFDA 20.106), provides $125,555.56 to the Lake County Government in Leadville, Colorado to construct a 300-foot taxilane. The taxilane will connect the existing general aviation apron to a new north development area at the Leadville-Lake County Airport. This grant funds 11.21% of the total project cost, with the remaining eligible portion funded through an Airport Improvement Program...
This federal Project Grant award from the Department of Transportation Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) provides $247,777.78 in funding to the Lake County Government to construct a 300-foot taxilane at the Leadville, Colorado airport. The taxilane will connect the existing general aviation apron to a new north development area. This grant award covers 22.92% of the total project cost, with the remaining eligible portion funded through an...
This $746,560 Project Grant from the Department of Transportation Federal Aviation Administration (CFDA 20.106 - Airport Improvement Program, COVID-19 Airports Programs, and Infrastructure Investment and Jobs Act Programs) will fund the construction of a 300-foot taxilane in Leadville, Colorado. The grant will cover 69.05% of the total project cost, with the remaining portion funded through a separate bipartisan infrastructure law grant. The taxilane will connect an existing general aviation...
This $2,525,147.78 Federal Aviation Administration (FAA) Airport Improvement Program (CFDA 20.106) Formula Grant award will fund the reconstruction of 1,300 feet of the existing paved Taxiway A at the airport in Lamar, Colorado. The project will address the deterioration of the taxiway pavement that has reached the end of its useful life. This grant award provides a portion of the total project funding, with the remaining eligible costs supported by a separate bipartisan infrastructure law...
This $811,111.11 federal Formula Grant awarded by the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) will fund the rehabilitation of 1,150 feet of Taxiway D and 900 feet of Taxiway B at an airport associated with Loveland, Colorado. The grant activities will maintain the structural integrity of the pavement and extend the useful life of these taxiways. The project is intended to enhance the safety, operational efficiency, and infrastructure resilience...
This federal Project Grant award from the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) provides $497,777.78 in funding to Delta County, Colorado to reconstruct 6,210 square yards of the existing main airport apron pavement that has reached the end of its useful life. The grant will cover 47.0% of the total construction costs, with the remaining eligible portion funded through an associated Airport Improvement Program grant. The project aims to enhance...
This federal Project Grant award from the U.S. Department of Transportation Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) provides $950,082.22 in funding to Delta County, Colorado. The grant will fund the reconstruction of 6,210 square yards of the existing main apron pavement at the Delta, Colorado airport that has reached the end of its useful life. This project represents the final phase of a larger infrastructure improvement effort, with the...
This $266,392.63 Formula Grant award from the Federal Aviation Administration's (FAA) Airport Improvement Program (CFDA 20.106) will fund the first phase of a project to rehabilitate 10,000 square yards of the existing northeast apron pavement at an airport associated with Pueblo, Colorado. The goal is to maintain the structural integrity of the pavement and minimize foreign object debris. The award was made on August 29, 2024, with a targeted final completion date of August 28, 2028. The...
This federal Formula Grant award of $648,196.67, provided by the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106), will fund the construction of a new 49,000 square yard south apron at the Telluride Regional Airport in Telluride, Colorado. This project is intended to bring the airport into conformity with current safety and operational standards. The grant award, dated August 7, 2024, will cover the design phase of the project, with a targeted ultimate...
This $194,444.44 Project Grant award from the Federal Aviation Administration (FAA) Airport Improvement Program (CFDA 20.106) will provide funding for the City of Longmont, Colorado to install 3,140 feet of perimeter fencing and 3 gates at the local airport. The purpose of this project is to bring the airport into conformity with current standards, enhancing airport security and infrastructure. The grant award has an anticipated completion date of August 19, 2028, four years after the August 20,...

This $376,242.22 Formula Grant awarded by the Federal Aviation Administration (FAA) under the Airport Improvement Program (CFDA 20.106) will fund pavement rehabilitation projects at the Leadville-Lake County Airport in Leadville, Colorado. Specifically, the grant will reseal 16,000 square yards of existing apron pavement, 2,700 feet of Taxiway A pavement, and 6,400 feet of Runway 16-34 pavement to extend the useful life of these critical airport infrastructure assets. The project aims to enhance the safety, operational efficiency, and infrastructure resilience of this non-primary airport, which serves the regional Leadville area. The grant was awarded on August 6, 2024, with a planned completion date of August 5, 2028. The awardee is the Lake County Government, a U.S. local government entity with experience managing previous FAA airport infrastructure grants.

Generated 5/13/25, 5:48 AM