Cooperative Agreement R23AC00099

Award Date 10/1/23
Completion Date 9/30/33
Dollars Obligated $9.9M
Federal Grant Program
15.521
Assistance Type
Cooperative Agreement
Place of Performance
Texas, USA
Similar Awards
The U.S. Department of the Interior's Bureau of Reclamation awarded a $5,918,760 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to the Hidalgo County Irrigation District No. 2 in Texas. The grant funds infrastructure and efficiency improvements to a feeder canal, discharge pipes, and a pumping plant. Key project elements include constructing reinforced isolation bays on the headwall and feeder canal, and replacing the pump discharge...
The U.S. Department of the Interior's Bureau of Reclamation awarded a $43,074,644 Cooperative Agreement to the Patterson Irrigation District (PID) under the Reclamation States Emergency Drought Relief program (CFDA 15.514). The purpose of this grant is to expand the conveyance capacity of PID's water infrastructure connecting the San Joaquin River to the Delta-Mendota Canal, increasing the capacity from 35 cubic feet per second (CFS) to 195 CFS. This project will modernize PID's aging conveyance...
The Bureau of Reclamation awarded a $4,750,000 Cooperative Agreement to Reclamation District 108 under the Central Valley Project Improvement Act (CFDA 15.512) program. The purpose of this 5-year award, with a performance period from September 2024 to September 2029, is to advance a landscape-scale vision of early implementation projects that will improve habitat conditions for fish, birds, and other wildlife in the Sacramento River Basin. The key activities to be performed under this...
The U.S. Department of the Interior's Bureau of Reclamation awarded a $894,676 WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant (CFDA #15.507) to the Cameron County Irrigation District #2 in Texas. The project will convert 4,713 linear feet of unlined open canal in Lateral C-2 to a buried polyvinyl chloride pipeline. This infrastructure upgrade is expected to result in annual water savings of 280 acre-feet that would otherwise be lost to evaporation and seepage. The...
The U.S. Bureau of Reclamation awarded a $300,214.26 Project Grant on January 23, 2024 to the El Paso County Water Improvement District No 1 in Texas under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507). The grant funds will be used to line 3,465 linear feet of the earthen Montoya Main Lateral canal with reinforced shotcrete. This upgrade will reduce water loss due to evaporation and seepage, as well as decrease sediment loading in the canal, improving...
The U.S. Department of the Interior Bureau of Reclamation awarded a $15,000,000 cooperative agreement under the SECURE Water Act - Research Agreements (CFDA 15.560) program to the San Luis & Delta-Mendota Water Authority, a California-based non-profit organization. The purpose of this 5-year pilot project is to identify viable solutions to enable federal, state, and irrigation water districts to dual-purpose traditional water conveyance canals by generating renewable energy, thereby reducing...
The U.S. Department of the Interior Bureau of Reclamation awarded the Porterville Irrigation District (District) a $923,033 Project Grant under the Reclamation States Emergency Drought Relief program (CFDA 15.514). Through this funding, the District will construct a surface water distribution system to serve 675 acres in its service area that currently only has access to groundwater. The project includes building a pipeline along Road 196 to connect the Lower Tule River Irrigation District 4...
This Cooperative Agreement award from the U.S. Department of the Interior Bureau of Reclamation under the SECURE Water Act - Research Agreements program (CFDA 15.560) provides $1,086,960 to the State Engineer, New Mexico Office of the (Interstate Stream Commission) to fund a variety of initiatives to enhance drought resilience and water management in the Rio Grande Project area. Key products and services under this award include: Rapid assessment of existing stormwater infrastructure (dams,...
The Bureau of Reclamation (Reclamation) awarded a $169,032.49 Project Grant to the Sierra Soil & Water Conservation District (SSWCD) under the Fish and Wildlife Coordination Act (CFDA 15.517) program. The funding supports cooperative work between Reclamation and SSWCD, including mapping, monitoring, restoration through harvesting and planting of cottonwood and willow vegetation, and other natural resource management activities on Reclamation lands along the Rio Grande in New Mexico. This...
The Middle Rio Grande Conservancy District in Albuquerque, New Mexico, was awarded a $7,844,510.25 Project Grant under the U.S. Department of the Interior's Bureau of Reclamation Reclamation States Emergency Drought Relief program (CFDA 15.514). The funding will be used to construct a pump station at the Feeder No.3 Canal to promote irrigation efficiency in the West-Side Belen Division. This will allow the District to take advantage of drain return flows and river accretion to augment irrigation...

THE LOWER RIO GRANDE VALLEY WATER RESOURCES CONSERVATION AND IMPROVEMENT ACT OF 2000 (P.L. 106-576) AND ITS SUBSEQUENT AMENDMENT, P.L. 107-351, AUTHORIZED 19 PROJECTS TO BE FUNDED THROUGH THIS PROGRAM, INCLUDING THE ONE HEREIN. THE PURPOSE OF THIS AGREEMENT IS TO ESTABLISH THE TERMS AND CONDITIONS WHEREBY RECLAMATION WILL PROVIDE COST SHARE ASSISTANCE TO THE DISTRICT ON A 50 50 BASIS FOR CANAL REHABILITATION AS IDENTIFIED IN THE LEGISLATION AS JOB NUMBER 4805540002 IN A REPORT BY TURNER COLLIE BRADEN, INC. DATED AUGUST 12, 1998 AND PROPOSED IMPROVEMENTS TO CANAL C, AS IDENTIFIED IN THE FEBRUARY 8, 2001, ENGINEERING REPORT BY MARTIN, BROWN, AND PEREZ. THE FACILITIES ARE NOT FEDERALLY-OWNED OR OPERATED AND ALL OPERATION, MAINTENANCE, REPAIR AND REHABILITATION COSTS WILL BE THE SOLE RESPONSIBILITY OF THE DISTRICT.THE RECIPIENT SHALL PROVIDE THE FOLLOWING CONSTRUCTION ACTIVITIES: CANAL B LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 3.68 MILES OF EARTHEN CANAL WHICH IS 27 FOOT WIDE. THIS PROJECT INCLUDES CANAL B NORTH AND CANAL B SOUTH. UPPER CANAL C LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 6.29 MILES OF EARTHEN CANAL WHICH IS 41 FOOT WIDE. CANAL 13A LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 3.84 MILES OF EARTHEN CANAL WHICH IS 12 FOOT WIDE. CANAL 13-A1 LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 2.02 MILES OF EARTHEN CANAL WHICH IS 22 FOOT WIDE.

Posted 6/28/23, 12:00 AM