Cooperative Agreement F24AC02591

Award Date 10/1/24
Completion Date 9/30/27
Dollars Obligated $50K
Federal Grant Program
15.630
Assistance Type
Cooperative Agreement
Place of Performance
Rose City, MI 48654, USA
Similar Awards
The City of Ypsilanti received a $4,465,000 cooperative agreement from the U.S. Department of the Interior's Fish and Wildlife Service under the National Fish Passage Program (CFDA 15.685) to finalize the removal design and fully remove the Peninsular Paper Dam from the Huron River. The project will restore aquatic organism passage and connectivity by deconstructing this 21-foot concrete gravity dam. Key activities include engineering design, sediment management, habitat protection, and...
This $499,025 Project Grant awarded by the U.S. Department of the Interior Fish and Wildlife Service under the National Fish Passage program (CFDA 15.685) will enable American Rivers, a non-profit organization, to remove the Washburn Mill Dam on the Mohawk River in Colebrook, New Hampshire. The dam removal project will restore 39.3 miles of river connectivity and 10 acres of cold-water brook trout habitat. This will improve public safety, habitat connectivity, fisheries population resilience,...
The U.S. Fish and Wildlife Service, under the National Fish Passage Program (CFDA 15.685), awarded a $1,822,000 Cooperative Agreement to Duplain Township on October 1, 2024 to remove the failing Elsie Dam on the Maple River in Clinton County, Michigan. The primary objectives are to eliminate the public safety hazard posed by the dam failure, restore the river channel through natural channel design, re-establish ecosystem function, and improve passage for aquatic organisms. Key deliverables...
The Department of the Interior Fish and Wildlife Service Region 3 awarded $400,000 under the Fish and Wildlife Management Assistance program (CFDA 15.608) to the Genesee County Metropolitan Planning Commission for the Flint River Restoration project in Flint, Michigan. The two-year project will restore nearly 25 stream miles to improve fish habitat and passage for species of conservation concern in the Flint River watershed. Key activities include removing dams and installing constructed riffles...
This $750,000 Project Grant award from the U.S. Environmental Protection Agency's Geographic Programs - Great Lakes Restoration Initiative (CFDA 66.469) will fund the Michigan Department of Natural Resources (DNR) to replace twin perched culverts at the H-58 crossing on the Sucker River with an open bottom arch culvert. This will restore the natural connectivity of the Sucker River, enabling 20 miles of stream access for native fish communities including brook trout within the Lake Superior...
This Cooperative Agreement award from the U.S. Department of the Interior's Fish and Wildlife Service, under the National Fish Passage Program (CFDA 15.685), provides $6,996,654 to the City of Ypsilanti, Michigan to remove the Peninsular Paper Dam, a high-hazard dam in poor condition along the Huron River. The project aims to restore the river to a free-flowing state, improve fish passage, and positively impact federally endangered freshwater mussels. It will also create new recreational...
The Department of Natural Resources (DNR) in Michigan has been awarded a $312,610 U.S. Fish and Wildlife Service Project Grant under the Fish and Wildlife Management Assistance program (CFDA 15.608) to support habitat restoration efforts in Saginaw County. The funding will be used to remove invasive species and restore approximately 40 acres of upland habitat and 100 acres of wetland habitat along the Tittabawassee and Shiawassee Rivers near the city of Saginaw. This work aims to rehabilitate...
This Cooperative Agreement award from the U.S. Department of the Interior Fish and Wildlife Service under the National Fish Passage Program (CFDA 15.685) will provide $3,779,000 to the Michigan Department of Natural Resources (DNR) to replace 6 improperly sized failing road-stream crossings on DNR state forest lands in the Upper Manistee River watershed. The project aims to restore connectivity and improve approximately 25 miles of stream habitat, which is critical for the reintroduction of...
This $100,000 Project Grant award from the U.S. Department of the Interior Fish and Wildlife Service under the Natural Resource Damage Assessment and Restoration (NRDAR) Program (CFDA 15.658) will fund the Michigan Department of Environment, Great Lakes, and Energy (MDEGLE) to collect sediment core samples and conduct probing transects upstream of the Allegan City Dam along the Kalamazoo River. The data collected will characterize the sediments down to pre-dam historic riverbed levels, which...
This $298,511.67 Cooperative Agreement award from the U.S. Fish and Wildlife Service (CFDA 15.685 - National Fish Passage Program) will fund a project to reconnect approximately 8 miles of upstream habitat for brook trout passage in Sheridan Creek and its tributaries in Albert Township, Michigan. The project aims to address issues caused by undersized culverts, such as erosion, stormwater pollution, and impediments to sediment and woody debris transport, by fully replacing the culverts with a...

SANBACK DAM IS A SIGNIFICANT HAZARD DAM ON BEECHWOOD CREEK IN ROSE CITY, MI, AND IT HAS BEEN INSPECTED AND RATED AS UNSATISFACTORY BY THE MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY DAM SAFETY PROGRAM, PROMPTING A NEED FOR ACTION. THE DAM BLOCKS AQUATIC ORGANISM PASSAGE AND IS CONTRIBUTING THERMAL POLLUTION TO BEECHWOOD CREEK AND HOUGHTON CREEK, A DESIGNATED NATURAL RIVER AND TROUT STREAM TO WHICH IT FLOWS. THE DAM IS IN A SEVERELY DETERIORATED CONDITION, AND A FUTURE FAILURE WOULD CAUSE MAJOR ECOLOGICAL DAMAGE DUE TO UNCONTROLLED CONTAMINATED SEDIMENT MOBILIZATION. DAM FAILURE COULD ALSO BE A SERIOUS THREAT TO HUMAN SAFETY, PROPERTY, AND DOWNSTREAM INFRASTRUCTURE. THE CITY OF ROSE CITY, WHICH OWNS THE DAM AND SURROUNDING PARK, APPROACHED HURON PINES FOR ASSISTANCE WITH DAM REMOVAL, AND OTHER PROJECT PARTNERS ARE WIDELY SUPPORTIVE OF FULL DAM REMOVAL WITH POST-RESTORATION NATURAL CHANNEL DESIGN STREAM RESTORATION AND WETLAND RESTORATION. THE CONSTRUCTION PLAN INCLUDES CONTROLLED DEWATERING AND IMPLEMENTATION OF A RIGOROUS SEDIMENT MANAGEMENT PLAN TO ENSURE THAT CONTAMINATED SEDIMENTS ARE NOT MOBILIZING DOWNSTREAM TO THE RIFLE RIVER AND ULTIMATELY SAGINAW BAY. THE WETLAND RESTORATION WILL INCLUDE PLANTING DIVERSE NATIVE SPECIES SUCH AS MILKWEED FOR MONARCH BUTTERFLY AND VARIOUS POLLINATOR SPECIES. THE REMOVAL OF THE DAM AND ASSOCIATED RIVER CHANNEL RESTORATION WILL RECONNECT APPROXIMATELY 0.5 MILES OF UPSTREAM HABITAT, WHICH BENEFITS WILD BROOK TROUT AND OTHER DESIRABLE AQUATIC ORGANISMS (USFWS SEA LAMPREY CONTROL PROGRAM STAFF HAVE REVIEWED AND GREEN-LIGHTED THIS PROJECT FROM A LAMPREY CONTROL PERSPECTIVE). BROOK TROUT AND OTHER FISH, MACROINVERTEBRATES, AND OTHER AQUATIC ORGANISMS WILL ALSO BE PERMANENTLY PROTECTED FROM THE RISK OF A FUTURE DAM FAILURE, WHICH WOULD HAVE DRASTIC NEGATIVE IMPACTS ON FISH, WILDLIFE, AND HABITAT IN HOUGHTON CREEK, THE RIFLE RIVER, AND LIKELY EXTENDING TO SAGINAW BAY COASTAL WETLANDS ADJACENT TO THE MOUTH OF THE RIFLE RIVER. THIS PROJECT WILL RESULT IN: 1 SIGNIFICANT-HAZARD DAM REMOVED 0.5 UPSTREAM MILES OF COLDWATER STREAM RECONNECTED 14.47 ACRES OF WETLAND HABITAT IMPROVED AND PROTECTED THROUGH INVASIVE SPECIES MANAGEMENT AND NATIVE PLANTINGS PROTECTION OF 70 MILES OF DOWNSTREAM COLDWATER HABITAT IN HOUGHTON CREEK AND THE RIFLE RIVER, SAGINAW BAY, AND COASTAL WETLANDS NEAR THE MOUTH OF THE RIFLE RIVER DUE TO AVOIDANCE OF POTENTIAL DAM FAILURE OF SANBACK DAM AND ENGAGEMENT OF 50 ROSE CITY COMMUNITY MEMBERS IN THE DESIGN AND PARK SPACE VISIONING PROCESS, POST-DAM REMOVAL VOLUNTEER OPPORTUNITIES, AND DISTRIBUTION OF PROJECT UPDATES THROUGH VARIOUS MEDIA UPDATES TO EDUCATE AND INFORM THE PUBLIC.

Posted 8/28/24