Cooperative Agreement F23AC03403

Award Date 8/30/23
Completion Date 9/30/25
Dollars Obligated $2.6M
Federal Grant Program
15.685
Assistance Type
Cooperative Agreement
Place of Performance
Bridgeton, MI 49327, USA
Similar Awards
The U.S. Fish and Wildlife Service (USFWS) Region 3 awarded a $100,000 Cooperative Agreement under the National Fish Habitat Partnership (CFDA 15.686) to the Conservation Resource Alliance (CRA), a non-profit organization, for the Maple River Post Dam Removal Wetlands Restoration Project. The project involves over 9 acres of wetlands restoration and monitoring along the historic Lake Kathleen bottomlands in the Maple River watershed, which had been dammed for over 100 years. With the dam now...
This federal Cooperative Agreement award from the U.S. Fish and Wildlife Service under the National Fish Passage Program (CFDA 15.685) provides $1,822,000 to Duplain Township in Duplain, MI to remove the failing Elsie Dam on the Maple River. The primary project objectives are to eliminate the public safety hazard posed by the dam failure, restore the river channel, and improve aquatic organism passage and ecosystem function. Key deliverables include final design plans, an ecosystem restoration...
This $499,025 Project Grant awarded by the U.S. Department of the Interior Fish and Wildlife Service under the National Fish Passage program (CFDA 15.685) will enable American Rivers, a non-profit organization, to remove the Washburn Mill Dam on the Mohawk River in Colebrook, New Hampshire. The dam removal project will restore 39.3 miles of river connectivity and 10 acres of cold-water brook trout habitat. This will improve public safety, habitat connectivity, fisheries population resilience,...
The Muskegon River Watershed Assembly (MRWA) was awarded a $207,500 cooperative agreement from the U.S. Department of the Interior Fish and Wildlife Service Region 3 under the Fish and Wildlife Management Assistance federal grant program (CFDA 15.608). The funding will support MRWA's project to remove the Altona Dam on the Little Muskegon River in Altona, Michigan by December 2025. Removal of the derelict Altona Dam will reconnect over 14 miles of instream habitat, improve conditions for brook...
This $350,000 federal Project Grant award, funded by the U.S. Fish and Wildlife Service under the Fish and Aquatic Conservation - Aquatic Invasive Species program (CFDA 15.608), supports the Conservation Resource Alliance (CRA) in carrying out a comprehensive watershed restoration project in the Cedar River watershed in Michigan. The key objectives of the project are to: 1) Perform pre-construction fish surveys, 2) Replace four priority undersized road-stream crossings with bankfull-spanning...
This $750,000 federal Project Grant awarded by the U.S. Environmental Protection Agency (EPA) under the Geographic Programs - Great Lakes Restoration Initiative (CFDA 66.469) provides funding to the Michigan Department of Natural Resources (DNR) to replace twin perched culverts with an open-bottom arch culvert on the Sucker River. This will restore natural connectivity and allow 20 miles of upstream access for the native fish community, including important migratory species and brook trout,...
The Department of the Interior Fish and Wildlife Service Region 3 awarded a $300,000 Cooperative Agreement under the National Fish Passage program (CFDA 15.685) to Trout Unlimited, Inc. to replace an undersized and failing culvert on Claybank Creek at Pine Creek Road in Manistee County, Michigan. This project will restore aquatic organism passage, enhance flood resiliency, and improve infrastructure at the crossing. The replacement culvert will reconnect 3.5 miles of upstream high-quality...
This Project Grant award from the U.S. Department of the Interior Fish and Wildlife Service's Natural Resource Damage Assessment and Restoration (NRDAR) Program (CFDA 15.658) provides $100,000 in funding to the Michigan Department of Environment, Great Lakes, and Energy (MDEGLE) to collect sediment core samples and complete probing transects upstream of the Allegan City Dam on the Kalamazoo River. The purpose of this data collection effort is to characterize the sediments down to the pre-dam...
The City of Ypsilanti received a $4,465,000 cooperative agreement from the U.S. Department of the Interior's Fish and Wildlife Service under the National Fish Passage Program (CFDA 15.685) to finalize the removal design and fully remove the Peninsular Paper Dam from the Huron River. The project will restore aquatic organism passage and connectivity by deconstructing this 21-foot concrete gravity dam. Key activities include engineering design, sediment management, habitat protection, and...
This Cooperative Agreement award from the U.S. Department of the Interior Fish and Wildlife Service under the National Fish Passage Program (CFDA 15.685) will fund the Michigan Department of Natural Resources (DNR) to replace 6 improperly sized and failing road-stream crossings on state forest lands. The project aims to restore connectivity and improve 25 miles of stream habitat in the Upper Manistee River watershed, a priority area for Arctic grayling reintroduction and other climate-vulnerable...

THE MAPLE RIVER RESTORATION PROJECT IS A HIGH-IMPACT, COMMUNITY-DRIVEN PARTNERSHIP ORGANIZED BY A DIVERSE PARTNERSHIP OF NON-GOVERNMENTAL ORGANIZATIONS (NGOS), TRIBAL, AND GOVERNMENTAL ENTITIES THAT AIMS TO RESTORE AND REOPEN A DORMANT 4.6-MILE RIVER CHANNEL DISCONNECTED FROM THE MUSKEGON RIVER DURING MICHIGANS LOGGING ERA IN THE 1800S. THROUGH FEASIBILITY STUDIES, COMMUNITY VISIONING, CULVERT REPLACEMENTS, AND DAM REMOVAL, A RESTORED MAPLE RIVER WILL BRING WATERSHED-WIDE BENEFITS. FOCUS IS BEING GIVEN TO ASSIST IN EXPANSION OF AN ANISHINAABE WILD RICE STAND, CLIMATE RESILIENCY, AND IMPROVED EMERGENCY SERVICES THROUGH INCREASED AGRICULTURAL AND ROADWAY FLOOD CONVEYANCE, RE-ESTABLISHMENT AND RECONNECTION OF A FISHERY LOST FOR OVER A CENTURY, AND SUPPORT FOR DIMINISHING PROPERTY VALUES IN TWO UNDER-SERVED AND IMPOVERISHED RURAL TOWNSHIPS. THIS PROJECT IS AN IMPORTANT FIRST STEP IN REMOVING TWO UNDERSIZED ROAD CROSSING CULVERTS AND REPLACING THEM WITH FULL SPANNING, OPEN BOTTOM BRIDGES. THE BRIDGES WILL INCREASE THE CAPACITY OF THE MAPLE RIVER CLOSER TO ITS HISTORIC CHANNEL AND MOVE WATER MORE EFFECTIVELY TO ACCOMMODATE FLOW THROUGH THE HISTORIC CHANNEL, IMPROVE RESILIENCY TO FLOODING, AND ALLOW FOR RECREATIONAL WATERCRAFT PURSUITS. THE COMPLEX NATURE OF THE PROJECT REQUIRES A BROAD RANGE OF PARTNER SKILLS AND ABILITIES WHO WILL COLLABORATE WITH FIVE DIFFERENT CONTRACTORS DURING THE FOUR-YEAR PROJECT. ENCOMPASS CONSULTING LLC WILL SERVE AS A REPRESENTATIVE OF MUSKEGON RIVER WATERSHED ASSEMBLY TO OVERSEE THE PROJECT AND WILL COLLABORATE WITH JMB ASSOCIATES AND A DESIGN CONTRACTOR TO COMPLETE PERMITTING, SELECTION AND MANAGEMENT OF DESIGN AND CONSTRUCTION CONTRACTORS, AND MONITORING. TWO DESIGN CONTRACTORS, YET TO BE SELECTED, WILL BE RESPONSIBLE FOR SYNERGISTICALLY DEVELOPING ENGINEERING AND DESIGN PLANS WITH THE PROJECT TEAM AND REPLACE THE CULVERTS WITH APPROPRIATELY SIZED AND POSITIONED BRIDGES. THE FINAL PRODUCTS OF THIS AGREEMENT WILL INCLUDE: COMPLETED FEASIBILITY, ENGINEERING, AND DESIGN PLANS FOR REPLACEMENT OF TWO ROAD STREAM CROSSINGS AND A HYDROLOGICAL STUDY TO DETERMINE WATER CONVEYANCE IN THE RECONNECTED RIVER CHANNEL.

Posted 9/12/23, 12:00 AM