The project is centered around the monroe drop structure, a 9-foot tall low head DAM on the long TOM river at river mile 6.6 that is owned by the U.S. Army corps of engineers (USACE)
Active Cooperative Agreement Awarded
- Award ID
- F23AC01865
- Recipient
-
Long Tom Watershed Council UEI PFCCVANPQN56
- Awarding agency
-
DOI Fish and Wildlife Service Headquarters Region 9
Fish and Wildlife Service, Department of the Interior
- Obligated
- $740,000
Award facts
- Assistance listing
- 15.685 National Fish Passage
- Completion date 96% complete
- Funding agency
- DOI Fish and Wildlife Service Region 1 Fish and Wildlife Service, Department of the Interior
- Place of performance
- Oregon, USA
Award details come from USAspending.gov.
Description
IT is the downstream-most barrier on the long TOM river and blocks upstream passage for juvenile upper willamette river spring chinook, which are ESA-listed as threatened. The project would open up access to 15 miles of mainstem and tributary rearing habitat for juvenile chinook. The DAM also blocks or impedes passage for pacific lamprey and coastal cutthroat trout that would otherwise use habitat upstream of the DAM for spawning and rearing. The DAM also disrupts sediment transport processes, increases water temperatures, and creates ideal conditions for warmwater predatory fish as well as algae blooms. There are two other USACE low head dams upstream of the monroe drop structure on the long TOM river. Ltwc has been working with USACE for nearly 20 years to develop plans for improving fish passage at all three dams, and once that vision is realized fish passage will be restored to 100 miles of habitat in the long TOM and coast range tributaries where ltwc has restored dozens of miles of habitat. The proposed project is the first step in achieving this vision and is the highest priority aquatic project in the long TOM watershed. The project will remove the DAM, restore the channel 1,000 upstream of the DAM, install scour protection at the footings of a state of oregon highway bridge near the DAM, revegetate the project area with native trees and shrubs, and replace a fish passage barrier culvert to provide access to 1 2 mile off-channel habitat in historical long TOM river channel segments adjacent to the DAM. Ltwc, USACE, the city of monroe, the confederated tribes of siletz indians, and USFWS nfpp are partners on the project.
Quick answers
Who received award F23AC01865?
F23AC01865 was awarded to Long Tom Watershed Council by DOI Fish and Wildlife Service Headquarters Region 9 (Fish and Wildlife Service) on June 26, 2023.
How much is award F23AC01865 worth?
$740,000 has been obligated on F23AC01865.
Which agency awarded F23AC01865?
DOI Fish and Wildlife Service Headquarters Region 9 (Fish and Wildlife Service) awarded F23AC01865, with funding from DOI Fish and Wildlife Service Region 1 (Fish and Wildlife Service).
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award