This agreement provides funding to canyon lake water treatment plant improvement project (clwtp)

Active Cooperative Agreement Awarded Last action

Award ID
98T86001
Recipient
Awarding agency
Obligated
$4,725,000

Award facts

Assistance listing
66.202 Congressionally Mandated Projects
Completion date 34% complete
Funding
  • $3,780,000.00 Federal
  • $945,000.00 Non-federal
Place of performance
Lake Elsinore, CA 92530, USA

Award details come from USAspending.gov.

Description

The clwtp, located in elsinore valley municipal water district (evmwd), california, was shut down in 2020 in response to elevated PFAS levels. The purpose of the project involves installing treatment upgrades at the clwtp to allow for reoperation of the facility. The existing intake pump station will be completely replaced with a new intake pump station, floating barge, electrical building, and raw water pipeline. The static and rapid mixers will be replaced to accommodate 7MGD capacity and maintain a minimum of 30 second detention time. Ferric sulfate and polymer will be added at the rapid mix process to support total organic carbon (TOC) removal through enhanced coagulation. The up-flow clarifier will be replaced with a new flocculation and sedimentation basin equipped with plate settlers capable of operating at the raw water flow of 7 MGD. Chemical systems will be added including ferric sulfate, potassium permanganate, and polymer. PFAS treatment will be added after the dual media filtration and will require booster pumping potentially preceded by a weir, to accommodate increased head from the treatment system. The project will be completed within an existing water treatment facility. Phase 1 is a planning phase and phase 2, (FY23) is the construction phase. This agreement provides phased federal funding in the amount of $780,000. Preaward costs have been approved back to 2/1/2025. Activities:the activities to be designed involve installing treatment upgrades at the clwtp to allow for reopening and operation of the facility. The existing intake pump station will be completely replaced with a new intake pump station, floating barge, electrical building, and raw water pipeline. The static and rapid mixers will be replaced to accommodate 7MGD capacity and maintain a minimum of 30 second detention time. Ferric sulfate and polymer will be added at the rapid mix process to support total organic carbon (TOC) removal through enhanced coagulation. The up-flow clarifier will be replaced with a new flocculation and sedimentation basin equipped with plate settlers. Chemical systems will be added including ferric sulfate, potassium permanganate, and polymer. PFAS treatment will be added after the dual media filtration. The project will be completed within an existing water treatment facility.subrecipient:no subawards are included in this assistance agreement.outcomes:the deliverable is an improved capacity at the facility and reopen the clwtp. The outcome will provide fresh drinking water with a significant reduction in PFAS to community members in elsinore and canyon lake, california.

Transactions

Action Federal Non-federal Date
Amendment This agreement provides funding to the elsinore valley municipal water district to implement its project to install treatment upgrades at the canyon lake… $3,000,000 $750,000
Original award $780,000 $195,000

Quick answers

Who received award 98T86001?

98T86001 was awarded to Elsinore Valley Municipal Water District by EPA Region 9 (Regional Offices) on February 1, 2025.

How much is award 98T86001 worth?

$4,725,000 has been obligated on 98T86001: $3,780,000 in federal funding and $945,000 in non-federal funding.