This agreement provides funding to canyon lake water treatment plant improvement project (clwtp)
Active Cooperative Agreement Awarded Last action
- Award ID
- 98T86001
- Recipient
-
Elsinore Valley Municipal Water District UEI K7BJBM4CM996
- Awarding agency
-
EPA Region 9
Regional Offices, Environmental Protection Agency
- Obligated
- $4,725,000
Award facts
- Assistance listing
- 66.202 Congressionally Mandated Projects
- Completion date 34% complete
- Funding
-
- $3,780,000.00 Federal
- $945,000.00 Non-federal
- Place of performance
- Lake Elsinore, CA 92530, USA
Award details come from USAspending.gov.
Description
The clwtp, located in elsinore valley municipal water district (evmwd), california, was shut down in 2020 in response to elevated PFAS levels. The purpose of the project involves installing treatment upgrades at the clwtp to allow for reoperation of the facility. The existing intake pump station will be completely replaced with a new intake pump station, floating barge, electrical building, and raw water pipeline. The static and rapid mixers will be replaced to accommodate 7MGD capacity and maintain a minimum of 30 second detention time. Ferric sulfate and polymer will be added at the rapid mix process to support total organic carbon (TOC) removal through enhanced coagulation. The up-flow clarifier will be replaced with a new flocculation and sedimentation basin equipped with plate settlers capable of operating at the raw water flow of 7 MGD. Chemical systems will be added including ferric sulfate, potassium permanganate, and polymer. PFAS treatment will be added after the dual media filtration and will require booster pumping potentially preceded by a weir, to accommodate increased head from the treatment system. The project will be completed within an existing water treatment facility. Phase 1 is a planning phase and phase 2, (FY23) is the construction phase. This agreement provides phased federal funding in the amount of $780,000. Preaward costs have been approved back to 2/1/2025. Activities:the activities to be designed involve installing treatment upgrades at the clwtp to allow for reopening and operation of the facility. The existing intake pump station will be completely replaced with a new intake pump station, floating barge, electrical building, and raw water pipeline. The static and rapid mixers will be replaced to accommodate 7MGD capacity and maintain a minimum of 30 second detention time. Ferric sulfate and polymer will be added at the rapid mix process to support total organic carbon (TOC) removal through enhanced coagulation. The up-flow clarifier will be replaced with a new flocculation and sedimentation basin equipped with plate settlers. Chemical systems will be added including ferric sulfate, potassium permanganate, and polymer. PFAS treatment will be added after the dual media filtration. The project will be completed within an existing water treatment facility.subrecipient:no subawards are included in this assistance agreement.outcomes:the deliverable is an improved capacity at the facility and reopen the clwtp. The outcome will provide fresh drinking water with a significant reduction in PFAS to community members in elsinore and canyon lake, california.
Transactions
| Action | Federal | Non-federal | Date |
|---|---|---|---|
| Amendment | $3,000,000 | $750,000 | |
| Original award | $780,000 | $195,000 |
Quick answers
Who received award 98T86001?
98T86001 was awarded to Elsinore Valley Municipal Water District by EPA Region 9 (Regional Offices) on February 1, 2025.
How much is award 98T86001 worth?
$4,725,000 has been obligated on 98T86001: $3,780,000 in federal funding and $945,000 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards