This agreement provides funding to the north tahoe public utility district to implement its 2025 waterline replacement project (water improvement project) as directed in the 2024 consolidated…

Active Cooperative Agreement Awarded Last action

Award ID
97T27401
Recipient
Awarding agency
Obligated
$1,562,500

Award facts

Assistance listing
66.202 Congressionally Mandated Projects
Completion date 82% complete
Funding
  • $1,250,000.00 Federal
  • $312,500.00 Non-federal
Place of performance
Kings Beach, CA, USA

Award details come from USAspending.gov.

About this award

This Cooperative Agreement provides $1,250,000 in funding from the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) to the North Tahoe Public Utility District (NTPUD). The funding supports the implementation of NTPUD's 2025 Waterline Replacement Project (Water Improvement Project) in Kings Beach, California. Key project activities include the installation of approximately 2,700 linear feet of 8-inch water mains, new 2-inch service lines to each developed property, addition of new fire hydrants, and improvements to the water system's looping and fire flow capacity. The anticipated deliverables include construction bid documents, quarterly progress reports, and a final report documenting the completion of construction. This project aims to enhance the community's drought resilience by reducing water system leaks and providing adequate fire flows as required by the California Fire Code, thereby preserving water resources. The award has a period of performance from March 1, 2025 to March 1, 2027.

Description

This agreement provides funding to the north tahoe public utility district to implement its 2025 waterline replacement project (water improvement project) as directed in the 2024 consolidated appropriations act. The agreement provides full federal funding in the amount of $1,250,000. Preaward costs are approved back to march 1, 2025. See terms and conditions. Activities:the activities to be performed include the installation of approximately 2,700 linear feet of 8-inch water mains, new 2-inch service lines to each developed property, the addition of new fire hydrants in the county right-of-way to comply with fire code requirements, the installation of valves and appurtenances, and the improvement of system looping. The fire hydrants will be spaced every 500 feet to comply with the california fire code. Water modeling of the proposed improvements calculates greater than 2,000 GPM of available fire flow after project completion. Subrecipient:no subawards are included in this assistance agreement.outcomes:the anticipated deliverables include construction bid documents, quarterly reports documenting construction progress, and a final report to document completion of construction. The expected outcomes include enhanced drought resilience by reducing leaks in our water system and providing adequate fire flows as required by the california fire code. This will preserve water for other uses since there will be less water drawn from lake tahoe. The intended beneficiaries include the community of kings beach in placer county, california.

Quick answers

Who received award 97T27401?

97T27401 was awarded to North Tahoe Public Utility District by EPA Region 9 (Regional Offices) on March 1, 2025.

How much is award 97T27401 worth?

$1,562,500 has been obligated on 97T27401: $1,250,000 in federal funding and $312,500 in non-federal funding.